Project overview

Nehru Nagar Mangal Prabhat Chs Ltd Building No-9 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008871. Nehru Nagar Mangal Prabhat Chs Ltd Building No-9 is located at 12 Part. This is a Ongoing being developed by Mumbai Shelter Housing Development Pvt Ltd.

Nehru Nagar Mangal Prabhat Chs Ltd Building No-9 has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 282 to 561 Sq.ft. Carpet. The Project has total 99 of which 45 are currently available for sale.

Nehru Nagar Mangal Prabhat Chs Ltd Building No-9 is being developed on a total land area of 17823 Sq.ft. out of which 8743 Sq.ft. i.e 49% is reserved for recreational purposes. Nehru Nagar Mangal Prabhat Chs Ltd Building No-9 has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nehru Nagar Mangal Prabhat Chs Ltd Building No-9
  • Location:
  • 12 Part
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jul 2019
Developer Details

  • Developer:
    Mumbai Shelter Housing Development Pvt Ltd
  • Phone:
  • Address:
  • Kalpaka Chs Ltd Bldg No-1
Project RERA Details
MAHA REARA No: P51800008871
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ellora Project Consultans Pvt Ltd
Funding Bank AXIS BANK
Proposed Possession 31 Jul 2019
Revised Possession 31 Jul 2019
Extended Possession 30 Jan 2023
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Nehru Nagar Mangal Prabhat Chs Ltd Building No-9 QR Code
Nehru Nagar Mangal Prabhat Chs Ltd Building No-9
MahaRERA - P51800008871
Apartment Details & Configuration
TypeArea
2 BHK52.07 Sq.mts. ( 560 Sq.ft. )
2 BHK52.08 Sq.mts. ( 561 Sq.ft. )
1 BHK39.09 Sq.mts. ( 421 Sq.ft. )
1RK26.22 Sq.mts. ( 282 Sq.ft. )
2 BHK47.55 Sq.mts. ( 512 Sq.ft. )
2 BHK52.11 Sq.mts. ( 561 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nehru Nagar Mangal Prabhat Chs Ltd Building No-9last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Bldg Is Under Construction
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Bldg Is Under Construction
Energy management
Na
Fire Protection And Fire Safety Requirements
Bldg Is Under Construction
Landscaping & Tree Planting
Bldg Is Under Construction
Open Parking
Bldg Is Under Construction
Sewerage (Chamber, Lines, Septic Tank , STP)
Bldg Is Under Construction
Solid Waste Management And Disposal
Bldg Is Under Construction
Storm Water Drains
Bldg Is Under Construction
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Bldg Is Under Construction
Water Conservation, Rain water Harvesting
Bldg Is Under Construction
Water Supply
Bldg Is Under Construction
Buildings / Wings in Nehru Nagar Mangal Prabhat Chs Ltd Building No-9
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nehru Nagar Mangal Prabhat Chs Ltd Building No-9 by Mumbai Shelter Housing Development Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

17823 Sq. ft.

Project Area

8743 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

99 apartments in total
Total
99
Booked
54
Available
45

Saleable Area Statistics (Sq. ft.)

54195 Total
Total
54195
Booked
30222
Available
23973
Total 99 apartments in project. 54 apartments booked. 54% apartments booked.
Total 54195 Sq.ft. saleable area. 30222 saleable area booked.
56% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJan 1900161010226
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK52.07 Sq.mts. ( 560 Sq.ft. )29
16 Booked55% Booked
55% Booked
2 BHK52.08 Sq.mts. ( 561 Sq.ft. )14
6 Booked42% Booked
42% Booked
43 total apartments / 22 apartments booked. 51% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress46% done
46% Booked
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 1900161010032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.09 Sq.mts. ( 421 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK26.22 Sq.mts. ( 282 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK47.55 Sq.mts. ( 512 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK52.07 Sq.mts. ( 560 Sq.ft. )24
18 Booked75% Booked
75% Booked
2 BHK52.08 Sq.mts. ( 561 Sq.ft. )11
5 Booked45% Booked
45% Booked
2 BHK52.11 Sq.mts. ( 561 Sq.ft. )15
8 Booked53% Booked
53% Booked
56 total apartments / 32 apartments booked. 57% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress46% done
46% Booked
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
work-in-progress90% done
90% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
Mumbai Shelter Housing Development Pvt Ltd
for Project
Nehru Nagar Mangal Prabhat Chs Ltd Building No-9
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation