Project overview

Neelrekha is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008659. Neelrekha is located at 629. This is a Ongoing being developed by Tasmai Spaces.

Neelrekha has 2 BHK & 3 BHK Apartments with carpet areas ranging from 616 to 1042 Sq.ft. Carpet. The Project has total 15 of which 7 are currently available for sale.

Neelrekha is being developed on a total land area of 4472 Sq.ft. Neelrekha has 1 Wings / Towers Neelrekha

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Neelrekha
  • Location:
  • 629
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Tasmai Spaces
  • Phone:
  • Address:
  • Utkarsh
Project RERA Details
MAHA REARA No: P51800008659
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Prashant Sukhatankar Of Tangents Design Cell
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 01 Nov 2018
Last Retrived 26 Jul 2025
Neelrekha QR Code
Neelrekha
MahaRERA - P51800008659
Apartment Details & Configuration
TypeArea
2 BHK57.2 Sq.mts. ( 616 Sq.ft. )
2 BHK66.03 Sq.mts. ( 711 Sq.ft. )
3 BHK77.07 Sq.mts. ( 830 Sq.ft. )
3 BHK84.89 Sq.mts. ( 914 Sq.ft. )
3 BHK92.36 Sq.mts. ( 994 Sq.ft. )
3 BHK96.76 Sq.mts. ( 1042 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Neelrekhalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
Na
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
Na
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
-
Water Supply
-
Buildings / Wings in Neelrekha
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Neelrekha by Tasmai Spaceslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4472 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

15 apartments in total
Total
15
Booked
8
Available
7

Saleable Area Statistics (Sq. ft.)

12210 Total
Total
12210
Booked
6088
Available
6122
Total 15 apartments in project. 8 apartments booked. 53% apartments booked.
Total 12210 Sq.ft. saleable area. 6088 saleable area booked.
50% area booked.

Neelrekha

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
NeelrekhaDec 2019171000116
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.2 Sq.mts. ( 616 Sq.ft. )5
3 Booked60% Booked
60% Booked
2 BHK66.03 Sq.mts. ( 711 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK77.07 Sq.mts. ( 830 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK84.89 Sq.mts. ( 914 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK92.36 Sq.mts. ( 994 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK96.76 Sq.mts. ( 1042 Sq.ft. )1
1 Booked100% Booked
100% Booked
15 total apartments / 8 apartments booked. 53% apartments booked.
Work Description in Building NeelrekhaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
Tasmai Spaces
for Project
Neelrekha
last updated on 26 Jul 2025 as per information obtained from MARA RERA.