Project overview

Ndw The Crest is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900007311. Ndw The Crest is located at U8wnzdes8vwjm0fokxm7icvgyhubrwfubzzezigdia0=. This is a Ongoing being developed by Anmol Land Developers.

Ndw The Crest has 1 BHK, 1RK, 2 BHK & 3 BHK Apartments with carpet areas ranging from 1079 to 822 Sq.ft. Carpet. The Project has total 51 of which 2 are currently available for sale.

Ndw The Crest is being developed on a total land area of 13662 Sq.ft. out of which 1348 Sq.ft. i.e 10% is reserved for recreational purposes. Ndw The Crest has 1 Wings / Towers The Crest

ProjectDeveloperLocationPossession
Shanti TowerShanti Prakash Realty & Infrastructure LLPAnand Patil Marg29-04-2030 00:00:00
Kalpataru OceanaKalpataru Properties (Thane) Pvt. Ltd.Uodtcfvqppbpceournmzpm9xa8ohi1kxx6fm9wzcejoiinu1cpll+Ap31mf4cqoedb9tthblm6ld1apw0yferg==31-12-2026 00:00:00
Krypton TerracesKrypton Construction & DevelopersVr46zvj6smlotckkw243laz306chz3ianqkkqowq792htgzpdhh3pmfhk9oiw69l31-01-2020 00:00:00
Kalpavruksha TowerKalpavrukshaJmcpxmj7dgfvybvz+Rast6cqd0tr4b1aqdioiga5vskn80y82xxklo8j6sotrk7hr722ighmaiaueo0biir4aa==30-03-2021 00:00:00
Shree Chamunda HeightsShree Chamunda RealtorsY6vflmr9redhqi5eoipq1t4qgiznqb7a9jtxynjhbkq=31-12-2019 00:00:00
Ashish Sea ViewSanghvi Gruha Niraman Private Limited400025, Mumbai City31-12-2014 00:00:00
LouisandraSuraj Estate Developers Ltd1W64gstunt9telvzxcqklw==30-06-2022 00:00:00
Jayant SapphireJayant Homes Private LimitedWsurodjl3trqaw43m+Mlqq==31-03-2018 00:00:00
Kalaya TowerAkruti Developers And BuildersY0l86+Fi8zu6qrw7ipp2fg==15-01-2025 00:00:00
Sumukh PlazaDharmesh Construction Co.Lulacrj4j9e+Nqqtfjpdvq==31-03-2025 00:00:00
Suraj Park View 2Suraj Estate Developers LtdTlyexib7k9nsapwmhmdgtk9jfupagrjju/G/0Wpnkn8=31-12-2026 00:00:00
Amrita ApartmentsUniversal Estate Developers6Isxyewy7qqtx/Iotpveog==30-06-2018 00:00:00
Lotus ResidencyLotus EnterprisesDbtbib4bymqflwgxxdjhqw==30-12-2023 00:00:00
Neha GalaxyShishir Mangeh ShivapurkarZrzmcm5nmrrkemyxqem3xg==26-05-2021 00:00:00
The Royal TuskSoham Mahavir DevelopersUef0vbbfgcgkkheoywyeeya8bepy/Rnirbe5iipgswc05q6iqnpdkze6llkhoeaojeotzxvoramoao6om0atp/Twjtlnxc+Ql5rz1krel4w=30-12-2024 00:00:00
Indiabulls Sky Forest -A2Indiabulls Properties Private Limited7Mszjyaldft7h68cbftmdq==30-09-2023 00:00:00
ElanzaA R ConstructionsYfcw9bfb/Mp+S4u1jhsf0+Fau7di6sf8sioiydirpjm=31-03-2018 00:00:00
Palai Commercial ComplexDhanji GalaSenapati Bapat Marg31-03-2019 00:00:00
25 South Tower A 11Th To 47Th FloorTwenty Five South Realty LimitedCeahbonydwrzjnrc0fswvtjplovbfopojpckeaduz/0=30-12-2026 00:00:00
Om Swami AnandAanandvardhan RealtorsK66wyenbt8czi3guzquqd5yfmtl0dshe4dbx1dt0/Wxc4rv98wqfmo1txakr1kus31-12-2017 00:00:00
Indiabulls Sky Forest -A3Indiabulls Properties Private Limited7Mszjyaldft7h68cbftmdq==30-09-2023 00:00:00
Ra ResidencesR A AssociatesRzrdmj+Gq0axzlb/Ncv37q==30-06-2019 00:00:00
Lifescapes AquinoGoodwill Properties Pvt LtdHdtj57xhrkampffi4/Utza==30-12-2022 00:00:00
Ratan InfiniaShree Shankheshwar Enterprises421J2c3nxb4ue3hcfr0iya==31-12-2026 00:00:00
Sugee SukrutSugee Nine Developers LlpXclwcsytk4mg6bo1+8Ebva==31-10-2026 00:00:00
Pole StarOm Shanti Housing Development CompanyPmeq4sm+Iaj2z2+Teij7oq==31-12-2027 00:00:00
Ramswaroop Palai TowerDhanji GalaDadar West31-12-2018 00:00:00
Eon OneFirstlight Properties Private LimitedYuaa0is1hbena1wnzwkb1dvkfli8k6xkafqzlompcxm=30-12-2023 00:00:00
InsigniaAshwatha DevelopersS.K. Bole Road31-12-2023 00:00:00
Dee Jay Square A WingDee Jay Developers4+Gnzeqcfestbllnvm2w1jrsdk4q31hbcze2mu/Mb8u=30-12-2021 00:00:00
Siddhi Vinayak GrandeurGopal Rampritsingh ThakurX98esdkyvdcs8fcv7mdx8a==30-12-2022 00:00:00
Ison HeightHatdia Builders Pvt LtdVapqfxnyp0tqc7qfz5r+Yusnnw4rwynynnpayonmzbyflsim9ymi0nrgxqz72fuk31-12-2019 00:00:00
Ajmera ClassiqueJasmin Kishorechandra AjmeraLshum6f6e73qtxrk9h+G3g==30-12-2023 00:00:00
AmoghBhalchandra Vinayak WadnerkarZwpyn7tkxqau8poylvnhkw==31-12-2017 00:00:00
Rustomjee Crown - Phase IRealgem Buildtech Private LimitedHatjlnssldsqwcux6eovjo58erurffy5iczz7eptuga=30-12-2022 00:00:00
Kings KrestKarwa And Kewal Kiran Realtors (Aop)Usxyrcov1helymakyz5j+G==30-12-2023 00:00:00
Tranquil BaySuraj Estate Developers Ltd45Hukpf8nc9e1agfw7+L7a==31-12-2018 00:00:00
Db ViewsM/S Shree Shantinagar Venture400011, Mumbai City31-12-2022 00:00:00
Buildarch SakuraBuildarch Land Devlopers Pvt. Ltd.Svbmkp1z6mkn0wvjtuj4fvnpce09zzhbf1qotnczbg2v/Vxnvtum2bpnd6rubmza31-12-2026 00:00:00
Mansion 835Rajadhiraj Construction LlpEfg2yv14wsly/Runhkzcgq==31-12-2027 00:00:00
Vision CrestWest Avenue Realtors Private LimitedMnyuztt9peaz7+Umaarfxhtmgevm0vdoztrsuwxlp6q=31-12-2025 00:00:00
Hari Tara HeightsRamdev ConstructionDadar West30-06-2021 00:00:00
Sumer Trinity Vertical Phase-ISumer BuildersYwwqxykslstcyy1zd5gaezgloe07o4uwz/Kp9wfccec=30-06-2023 00:00:00
Essgee Options One Phase IGmj Builders & Developers+Rgzzobcrvfi0ulzvnad0g==30-12-2023 00:00:00
Essgee Options One - Phase ISheetal Sagar Builders & Developers Pvt Ltd+Rgzzobcrvfi0ulzvnad0g==30-12-2023 00:00:00
Earth VintageEarth VintageVgyv4y08bjjogm0ww+Ktoa==30-12-2022 00:00:00
87 NinadMaauli Creations Pvt Ltd5/Mnmsp9do7srxk4ax/H1t5tnmmnzkkmel6vjdddo+D9ffdxcijvqooszsjsxdni30-12-2022 00:00:00
FlorenceEcostruk Infra Private LimitedP2xoqxfveg9env+Ig2swrq==30-06-2022 00:00:00
Vipin ResidencyAnmol Land DevelopersKso3fzo3r/Lpo68miljrmq==30-12-2022 00:00:00
Rustomjee Crown -Phase IiRealgem Buildtech Private Limited/Hu52u+Ykibwte+Gfswptnw078kxu6hjwvuhf7kpfyw=30-12-2023 00:00:00
Tanishq WisteriaAakaar Tanishq Nirmaan J. V.Qeblp+Woweidm37tbnirtq==31-08-2019 00:00:00
MangirishAccord Estates Pvt LtdRihk9ts4i2fj/Bu9s2qwrg==30-06-2019 00:00:00
25 South Tower A Upto 10Th FloorTwenty Five South Realty LimitedZpzn/Meu8hsm/Ovgdvcgn7bfifr1sdmzmmcrou1k27s=30-12-2026 00:00:00
Fashion IndexPsk Developers Pvt. Ltd.Q/Rrjwrtnfr497cupbku6w==30-12-2023 00:00:00
Mint Magna Housing LlpMint Magna Housing LlpMr6mx3ij3cn1azq2w1w8hkaqnxgr/I3ek9qsnqtbfiiizozzus3iwaeb0svwwtid30-03-2018 00:00:00
Ndw The CrestAnmol Land DevelopersU8wnzdes8vwjm0fokxm7icvgyhubrwfubzzezigdia0=30-12-2022 00:00:00
Sigma GarnetColo Color Private LimitedBitzptapctfvfkakqekzbzwqb5dlnahceuygfkaqa8jqob6okmujecw0v2h3aqwp30-12-2026 00:00:00
Aayesha PalaceZoeb EnterprisesYtdaja7jzgfupzeowni7181eqo+Drp+Fxhvhlban+Ts=30-12-2023 00:00:00
25 South - Central TowerTwenty Five South Realty LimitedAkmgruopkn9fwjspnr4tvzw97lgf7gn577akv6cqhe0=30-12-2028 00:00:00
Samarth RaghukulM/S Virtue EnterprisesNneqvkfebte7sqp6zuvmta==31-12-2017 00:00:00
Construction Of Mill Workers Tenements At Shrinivas Mill Lower ParelMhada/C0jyo6on8a4mwkk2loupw==31-12-2018 00:00:00
Shaanti AshishRuparel Estates India Pvt LtdSeoqij/Neaqblvfvkwlzwa==30-12-2022 00:00:00
Ranka Lifestyle VenturesBhavesh Jayantilal JainJzb8yzsab9cttduonlqi0ta2chpsloe8k5ktfb3pgedzxymihaqivrkfsxcuioh823-06-2023 00:00:00
Essgee Options One - Phase IiSheetal Sagar Builders & Developers Private Limited+Rgzzobcrvfi0ulzvnad0g==30-06-2023 00:00:00
AkankshaSugee Ten Developers LlpT4aerecymcaqz/+Pqy2ugyy9qp3jzhbmy9glwwvrtl6ps1vwbiaezhpuurede9cu30-06-2025 00:00:00
Yash PlazaBhalchandra Vinayak WadnerkarXxt3+Oufg1dfb0auoihoug==31-12-2017 00:00:00
PaletteSuraj Estate Developers LtdMtxmgqsd4o2bvcvqoxmreq==30-06-2023 00:00:00
Keniwadi AnnapurnaVenus Housing EnterpriseK1zuehsbckqo/Xvh+Awd+3Erechwepcqcprtwh4t04q=31-12-2018 00:00:00
EmmanuelSkyline Realty Private LimitedBuet7fyzvht9zzfhdmwlbq==30-12-2025 00:00:00
SkylineArihant Builders And DevelopersFotnwi3q8vgp8lyqfec1z/77T1mhlg8dh65wjqewdazlh6cxpvv4pxfioeskbfto31-03-2023 00:00:00
Ratan AddressShri Nakoda EnterprisesBri8trvrxbvhx25y2fnxdo4trihe3znby+Cabqiy5+C=30-04-2024 00:00:00
Vivaana HeightsN K Builders & DevelopersVpqv7nzyrew7v+Tr8nffdqcnvme4f0tcricl+/Oufyw+Xptby4lirkqanlk0a/Ppdqbjopyy2mqxjayknoqjzbewf1ld2vas6lp6fppevze=30-06-2026 00:00:00
SAI DATTA KRIPABhalchandra Vinayak Wadnerkar3561 To 356630-06-2023 00:00:00
Satguru SkylightShreenath RealtyH+Nhod/Uupxvkv7vnf4p8g==31-03-2027 00:00:00
Ruparel ElaviaShree Sukhakarta Developers Pvt.Ltd.400014, Mumbai City31-12-2019 00:00:00
Shiv KrupaR K EngineersFm9tk8/G6hc12vvgdp8r3q==31-07-2018 00:00:00
Aai Satidevi ParadiseShreenath DevelopersOqt9+Jrub09bnjtbqvih9wh9wvk91f5cvv38ksvc8adjlqgjeob3yuk250rbpqjfkb6d2vihhycv7raer8nlya==31-03-2026 00:00:00
Suraj AurevaSuraj Estate Developers Ltd31-12-2031 00:00:00
Suraj Park View 1Suraj Estate Developers Ltd31-12-2031 00:00:00
Yashwant HeightsGirnar Estate31-12-2030 00:00:00
Project Details
  • Project:
    Ndw The Crest
  • Location:
  • U8wnzdes8vwjm0fokxm7icvgyhubrwfubzzezigdia0=
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Anmol Land Developers
  • Phone:
  • Address:
  • Dudhwala Complex
Project RERA Details
MAHA REARA No: P51900007311
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Sanjay Puri Architects
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 30 Dec 2023
Litigations No Litigations
Last Modified 03 Jun 2025
Last Retrived 13 Feb 2026
Ndw The Crest QR Code
Ndw The Crest
MahaRERA - P51900007311
Apartment Details & Configuration
TypeArea
1 BHK24.41 Sq.mts. ( 263 Sq.ft. )
1 BHK35.74 Sq.mts. ( 385 Sq.ft. )
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )
1 BHK36 Sq.mts. ( 388 Sq.ft. )
1RK20.79 Sq.mts. ( 224 Sq.ft. )
2 BHK73.74 Sq.mts. ( 794 Sq.ft. )
2 BHK74.02 Sq.mts. ( 797 Sq.ft. )
2 BHK76.09 Sq.mts. ( 819 Sq.ft. )
2 BHK76.37 Sq.mts. ( 822 Sq.ft. )
3 BHK100.21 Sq.mts. ( 1079 Sq.ft. )
3 BHK102.56 Sq.mts. ( 1104 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ndw The Crestlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Yet Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
Not Yet Started
Energy management
Na
Fire Protection And Fire Safety Requirements10% completed
10% Complete
Not Yet Started
Landscaping & Tree Planting
Not Yet Started
Open Parking
Not Yet Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Yet Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Yet Started
Water Supply
Not Yet Started
Buildings / Wings in Ndw The Crest
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ndw The Crest by Anmol Land Developerslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

13662 Sq. ft.

Project Area

1348 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

51 apartments in total
Total
51
Booked
49
Available
2

Saleable Area Statistics (Sq. ft.)

40849 Total
Total
40849
Booked
40362
Available
487
Total 51 apartments in project. 49 apartments booked. 96% apartments booked.
Total 40849 Sq.ft. saleable area. 40362 saleable area booked.
99% area booked.

The Crest

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
The CrestDec 2021201010062
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.41 Sq.mts. ( 263 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35.74 Sq.mts. ( 385 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK36 Sq.mts. ( 388 Sq.ft. )3
3 Booked100% Booked
100% Booked
1RK20.79 Sq.mts. ( 224 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK73.74 Sq.mts. ( 794 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK74.02 Sq.mts. ( 797 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK76.09 Sq.mts. ( 819 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK76.37 Sq.mts. ( 822 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK100.21 Sq.mts. ( 1079 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK102.56 Sq.mts. ( 1104 Sq.ft. )3
3 Booked100% Booked
100% Booked
51 total apartments / 49 apartments booked. 96% apartments booked.
Work Description in Building The CrestCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress20% done
20% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress69% done
69% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked
Channel Partners
Channel Partners Registered by Developer
Anmol Land Developers
for Project
Ndw The Crest
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation