Project overview

Nayan-Vastu Heritage is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000035201. Nayan-Vastu Heritage is located at 401102, Palghar, Makane. This is a New Project being developed by Unity Infra.

Nayan-Vastu Heritage has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 141 to 684 Sq.ft. Carpet. The Project has total 29 of which 29 are currently available for sale.

Nayan-Vastu Heritage is being developed on a total land area of 20053 Sq.ft. out of which 2002 Sq.ft. i.e 10% is reserved for recreational purposes. Nayan-Vastu Heritage has 2 Wings / Towers Building No 1 Wing B,Building No 1 Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nayan-Vastu Heritage
  • Location:
  • 401102, Palghar, Makane
  • Const. Stage:
    New Project
  • Possession:
    31 Mar 2025
Developer Details

  • Developer:
    Unity Infra
  • Phone:
  • Address:
  • Gala No 2, Sai Sadan Bldg 1, Ambewadi, Near Manorama Hospital, Nallasopara East, 401209
Project RERA Details
MAHA REARA No: P99000035201
Project Type Others
RERA Project Status New Project
Funding Bank HDFC BANK
Proposed Possession 31 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 May 2023
Last Retrived 28 Jul 2025
Nayan-Vastu Heritage QR Code
Nayan-Vastu Heritage
MahaRERA - P99000035201
Apartment Details & Configuration
TypeArea
1 BHK36.13 Sq.mts. ( 389 Sq.ft. )
1 BHK46.53 Sq.mts. ( 501 Sq.ft. )
2 BHK57.82 Sq.mts. ( 622 Sq.ft. )
Shop12.58 Sq.mts. ( 135 Sq.ft. )
Shop12.59 Sq.mts. ( 136 Sq.ft. )
Shop15.87 Sq.mts. ( 171 Sq.ft. )
1 BHK46.74 Sq.mts. ( 503 Sq.ft. )
2 BHK63.51 Sq.mts. ( 684 Sq.ft. )
Shop13.13 Sq.mts. ( 141 Sq.ft. )
Shop14.43 Sq.mts. ( 155 Sq.ft. )
Shop15.36 Sq.mts. ( 165 Sq.ft. )
Shop21.02 Sq.mts. ( 226 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nayan-Vastu Heritagelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Building Under Construction
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Building Under Construction
Energy management
Building Under Construction
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Building Under Construction
Open Parking
Building Under Construction
Sewerage (Chamber, Lines, Septic Tank , STP)
Building Under Construction
Solid Waste Management And Disposal
Building Under Construction
Storm Water Drains
Building Under Construction
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Building Under Construction
Water Conservation, Rain water Harvesting
Building Under Construction
Water Supply
Building Under Construction
Buildings / Wings in Nayan-Vastu Heritage
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nayan-Vastu Heritage by Unity Infralast updated on 28 Jul 2025 as per information obtained from MARA RERA.

20053 Sq. ft.

Project Area

2002 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

29 apartments in total
Total
29
Booked
0
Available
29

Saleable Area Statistics (Sq. ft.)

12304 Total
Total
12304
Booked
0
Available
12304
Total 29 apartments in project. 0 apartments booked. 0% apartments booked.
Total 12304 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building No 1 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1 Wing BMar 20254111141
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.13 Sq.mts. ( 389 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK46.53 Sq.mts. ( 501 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK57.82 Sq.mts. ( 622 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12.58 Sq.mts. ( 135 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.59 Sq.mts. ( 136 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.87 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 1 Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 1 Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1 Wing CMar 20254111141
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.74 Sq.mts. ( 503 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK63.51 Sq.mts. ( 684 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.13 Sq.mts. ( 141 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop14.43 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.36 Sq.mts. ( 165 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.02 Sq.mts. ( 226 Sq.ft. )1
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 1 Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Unity Infra
for Project
Nayan-Vastu Heritage
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation