Project overview
Nayan-Vastu Heritage is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000034936. Nayan-Vastu Heritage is located at Makane, Palghar, 401102. This is a New Project being developed by Unity Infra.
Nayan-Vastu Heritage has 1 BHK & Shop Apartments with carpet areas ranging from 159 to 524 Sq.ft. Carpet. The Project has total 42 of which 42 are currently available for sale.
Nayan-Vastu Heritage is being developed on a total land area of 29063 Sq.ft. out of which 434 Sq.ft. i.e 1% is reserved for recreational purposes. Nayan-Vastu Heritage has 4 Wings / Towers -,Building No 2 Wing A,Building No 2 Wing B,Building No 3
| Project | Developer | Location | Possession |
-
Project:
Nayan-Vastu Heritage
-
Location:
-
Makane, Palghar, 401102
-
Const. Stage:
New Project
-
Possession:
31 Mar 2025
-
Developer:
Unity Infra
-
Phone:
-
Address:
-
Gala No 2, Sai Sadan Bldg 1, Ambewadi, Near Manorama Hospital, Nallasopara East, 401209
| MAHA REARA No: |
P99000034936 |
| Project Type |
Others |
| RERA Project Status |
New Project |
| Funding Bank |
VASAI VIKAS SAHKARI BANK |
| Proposed Possession |
31 Mar 2025 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
25 Aug 2023 |
| Last Retrived |
28 Jul 2025 |
Nayan-Vastu Heritage QR Code
Nayan-Vastu Heritage
MahaRERA - P99000034936
| Type | Area |
| 1RK | 1 Sq.mts. ( 11 Sq.ft. ) |
| 1 BHK | 46.74 Sq.mts. ( 503 Sq.ft. ) |
| 2 BHK | 63.51 Sq.mts. ( 684 Sq.ft. ) |
| Shop | 13.13 Sq.mts. ( 141 Sq.ft. ) |
| 1 BHK | 46.2 Sq.mts. ( 497 Sq.ft. ) |
| 2 BHK | 62.78 Sq.mts. ( 676 Sq.ft. ) |
| Shop | 12.98 Sq.mts. ( 140 Sq.ft. ) |
| Shop | 14.26 Sq.mts. ( 153 Sq.ft. ) |
| Shop | 15.18 Sq.mts. ( 163 Sq.ft. ) |
| Shop | 17.43 Sq.mts. ( 188 Sq.ft. ) |
| 1 BHK | 30.4 Sq.mts. ( 327 Sq.ft. ) |
| 1 BHK | 48.65 Sq.mts. ( 524 Sq.ft. ) |
| Shop | 14.79 Sq.mts. ( 159 Sq.ft. ) |
| Shop | 23.67 Sq.mts. ( 255 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Nayan-Vastu Heritagelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Under Construction |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Under Construction |
|
|
|
Under Construction |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Under Construction |
|
|
|
Under Construction |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Under Construction |
Solid Waste Management And Disposal
|
|
Under Construction |
|
|
|
Under Construction |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Under Construction |
Water Conservation, Rain water Harvesting
|
|
Under Construction |
|
|
|
Under Construction |
Buildings / Wings in Nayan-Vastu Heritage
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nayan-Vastu Heritage by Unity Infralast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
42
apartments in total
Saleable Area Statistics (Sq. ft.)
16350
Total
Total 42 apartments in project. 0 apartments booked. 0% apartments booked.
Total 16350 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| - | Mar 2025 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1RK | 1 Sq.mts. ( 11 Sq.ft. ) | 1 | |
1 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building - | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 2 Wing A | Mar 2025 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 46.74 Sq.mts. ( 503 Sq.ft. ) | 8 | |
| 2 BHK | 63.51 Sq.mts. ( 684 Sq.ft. ) | 2 | |
| Shop | 13.13 Sq.mts. ( 141 Sq.ft. ) | 1 | |
11 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No 2 Wing A | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 2 Wing B | Mar 2025 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 46.2 Sq.mts. ( 497 Sq.ft. ) | 8 | |
| 2 BHK | 62.78 Sq.mts. ( 676 Sq.ft. ) | 3 | |
| Shop | 12.98 Sq.mts. ( 140 Sq.ft. ) | 2 | |
| Shop | 14.26 Sq.mts. ( 153 Sq.ft. ) | 2 | |
| Shop | 15.18 Sq.mts. ( 163 Sq.ft. ) | 2 | |
| Shop | 17.43 Sq.mts. ( 188 Sq.ft. ) | 1 | |
18 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No 2 Wing B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 3 | Mar 2025 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30.4 Sq.mts. ( 327 Sq.ft. ) | 3 | |
| 1 BHK | 48.65 Sq.mts. ( 524 Sq.ft. ) | 3 | |
| Shop | 14.79 Sq.mts. ( 159 Sq.ft. ) | 4 | |
| Shop | 23.67 Sq.mts. ( 255 Sq.ft. ) | 2 | |
12 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No 3 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Unity Infra
for Project
Nayan-Vastu Heritage
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |