Project overview

Navkar City Phase Ii Part I is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000009437. Navkar City Phase Ii Part I is located at Survey No 332 Hissa No 7 8 And Survey No 333 Hissa No 1 And 2. This is a Ongoing being developed by Navkar Estate And Homes Pvt Ltd.

Navkar City Phase Ii Part I has 2 BHK Apartments with carpet areas ranging from 469 to 489 Sq.ft. Carpet. The Project has total 131 of which 5 are currently available for sale.

Navkar City Phase Ii Part I is being developed on a total land area of 68995 Sq.ft. out of which 5906 Sq.ft. i.e 9% is reserved for recreational purposes. Navkar City Phase Ii Part I has 3 Wings / Towers A Type Bldg,D Type Bldg,Type B Bldg Wing B 1 B 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Navkar City Phase Ii Part I
  • Location:
  • Survey No 332 Hissa No 7 8 And Survey No 333 Hissa No 1 And 2
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Navkar Estate And Homes Pvt Ltd
  • Phone:
  • Address:
  • Navkar City
Project RERA Details
MAHA REARA No: P99000009437
Project Type Others
RERA Project Status Ongoing
Architect Rajesh R C
Funding Bank IDBI BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 22 Aug 2017
Last Retrived 28 Jul 2025
Navkar City Phase Ii Part I QR Code
Navkar City Phase Ii Part I
MahaRERA - P99000009437
Apartment Details & Configuration
TypeArea
2 BHK45.23 Sq.mts. ( 487 Sq.ft. )
2 BHK45.72 Sq.mts. ( 492 Sq.ft. )
2 BHK47.65 Sq.mts. ( 513 Sq.ft. )
2 BHK48.13 Sq.mts. ( 518 Sq.ft. )
3 BHK57.63 Sq.mts. ( 620 Sq.ft. )
3 BHK61.67 Sq.mts. ( 664 Sq.ft. )
3 BHK61.8 Sq.mts. ( 665 Sq.ft. )
3 BHK61.85 Sq.mts. ( 666 Sq.ft. )
3 BHK62.03 Sq.mts. ( 668 Sq.ft. )
3 BHK64.36 Sq.mts. ( 693 Sq.ft. )
3 BHK64.51 Sq.mts. ( 694 Sq.ft. )
F MP Room No 117.21 Sq.mts. ( 185 Sq.ft. )
F MP Room No 1015.84 Sq.mts. ( 171 Sq.ft. )
F MP Room No 217.94 Sq.mts. ( 193 Sq.ft. )
F MP Room No 317.07 Sq.mts. ( 184 Sq.ft. )
F MP Room No 417.44 Sq.mts. ( 188 Sq.ft. )
F MP Room No 523.48 Sq.mts. ( 253 Sq.ft. )
F MP Room No 617.77 Sq.mts. ( 191 Sq.ft. )
F MP Room No 717.69 Sq.mts. ( 190 Sq.ft. )
F MP Room No 823.42 Sq.mts. ( 252 Sq.ft. )
F MP Room No 917.59 Sq.mts. ( 189 Sq.ft. )
Grad Shop No 126.03 Sq.mts. ( 280 Sq.ft. )
Grnd MP Room No 120.97 Sq.mts. ( 226 Sq.ft. )
Grnd MP Room No 220.13 Sq.mts. ( 217 Sq.ft. )
Grnd MP Room No 322.29 Sq.mts. ( 240 Sq.ft. )
Grnd MP Room No 418.99 Sq.mts. ( 204 Sq.ft. )
Grnd Shop No 1A71.35 Sq.mts. ( 768 Sq.ft. )
Grnd Shop No 219.42 Sq.mts. ( 209 Sq.ft. )
Grnd Shop No 319.34 Sq.mts. ( 208 Sq.ft. )
Grnd Shop No 523.31 Sq.mts. ( 251 Sq.ft. )
Grnd Shop No 623.72 Sq.mts. ( 255 Sq.ft. )
1 BHK27.25 Sq.mts. ( 293 Sq.ft. )
1 BHK27.96 Sq.mts. ( 301 Sq.ft. )
2 BHK43.55 Sq.mts. ( 469 Sq.ft. )
2 BHK43.73 Sq.mts. ( 471 Sq.ft. )
2 BHK45.22 Sq.mts. ( 487 Sq.ft. )
2 BHK45.24 Sq.mts. ( 487 Sq.ft. )
2 BHK45.34 Sq.mts. ( 488 Sq.ft. )
2 BHK45.38 Sq.mts. ( 488 Sq.ft. )
2 BHK45.44 Sq.mts. ( 489 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Navkar City Phase Ii Part Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space88% completed
88% Complete
Work In Progress
Community Buildings70% completed
70% Complete
Work In Progress
Compound Wall of layout80% completed
80% Complete
Work In Progress
Electrical Meter Room, Sub-Station, Receiving Station88% completed
88% Complete
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements75% completed
75% Complete
Work In Progress
Land Development Filling and Levellig100% completed
95% Complete
Work Compted
Landscaping & Tree Planting90% completed
90% Complete
Work In Progress
Multipurpose Court
Na
Open Gymnasium60% completed
60% Complete
Work In Progress
Open Parking80% completed
80% Complete
Work In Progress
Outdoor playing Area with Playing Equipment70% completed
70% Complete
Work In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
Work In Progress
Street Lighting85% completed
85% Complete
Work In Progress
swimming Pool80% completed
80% Complete
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting60% completed
60% Complete
Work In Progress
Water Supply80% completed
80% Complete
Work In Progress
Buildings / Wings in Navkar City Phase Ii Part I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Navkar City Phase Ii Part I by Navkar Estate And Homes Pvt Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

68995 Sq. ft.

Project Area

5906 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

131 apartments in total
Total
131
Booked
126
Available
5

Saleable Area Statistics (Sq. ft.)

56484 Total
Total
56484
Booked
54816
Available
1668
Total 131 apartments in project. 126 apartments booked. 96% apartments booked.
Total 56484 Sq.ft. saleable area. 54816 saleable area booked.
97% area booked.

A Type Bldg

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Type BldgDec 20208101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK45.23 Sq.mts. ( 487 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK45.72 Sq.mts. ( 492 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK47.65 Sq.mts. ( 513 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK48.13 Sq.mts. ( 518 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK57.63 Sq.mts. ( 620 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK61.67 Sq.mts. ( 664 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK61.8 Sq.mts. ( 665 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK61.85 Sq.mts. ( 666 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK62.03 Sq.mts. ( 668 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK64.36 Sq.mts. ( 693 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK64.51 Sq.mts. ( 694 Sq.ft. )2
2 Booked100% Booked
100% Booked
F MP Room No 117.21 Sq.mts. ( 185 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 1015.84 Sq.mts. ( 171 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 217.94 Sq.mts. ( 193 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 317.07 Sq.mts. ( 184 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 417.44 Sq.mts. ( 188 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 523.48 Sq.mts. ( 253 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 617.77 Sq.mts. ( 191 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 717.69 Sq.mts. ( 190 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 823.42 Sq.mts. ( 252 Sq.ft. )1
1 Booked100% Booked
100% Booked
F MP Room No 917.59 Sq.mts. ( 189 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grad Shop No 126.03 Sq.mts. ( 280 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd MP Room No 120.97 Sq.mts. ( 226 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd MP Room No 220.13 Sq.mts. ( 217 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd MP Room No 322.29 Sq.mts. ( 240 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd MP Room No 418.99 Sq.mts. ( 204 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd Shop No 1A71.35 Sq.mts. ( 768 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd Shop No 219.42 Sq.mts. ( 209 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd Shop No 319.34 Sq.mts. ( 208 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd Shop No 426.03 Sq.mts. ( 280 Sq.ft. )1
1 Booked100% Booked
100% Booked
Grnd Shop No 523.31 Sq.mts. ( 251 Sq.ft. )2
2 Booked100% Booked
100% Booked
Grnd Shop No 623.72 Sq.mts. ( 255 Sq.ft. )1
1 Booked100% Booked
100% Booked
47 total apartments / 47 apartments booked. 100% apartments booked.
Work Description in Building A Type BldgCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress99% done
99% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress89% done
89% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress98% done
98% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress99% done
99% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Type Bldg

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D Type BldgDec 20208101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.25 Sq.mts. ( 293 Sq.ft. )16
13 Booked81% Booked
81% Booked
1 BHK27.96 Sq.mts. ( 301 Sq.ft. )12
11 Booked91% Booked
91% Booked
28 total apartments / 24 apartments booked. 85% apartments booked.
Work Description in Building D Type BldgCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress98% done
98% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type B Bldg Wing B 1 B 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type B Bldg Wing B 1 B 2Dec 20208101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK43.55 Sq.mts. ( 469 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK43.73 Sq.mts. ( 471 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK45.22 Sq.mts. ( 487 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK45.24 Sq.mts. ( 487 Sq.ft. )9
8 Booked88% Booked
88% Booked
2 BHK45.34 Sq.mts. ( 488 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK45.38 Sq.mts. ( 488 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK45.44 Sq.mts. ( 489 Sq.ft. )5
5 Booked100% Booked
100% Booked
56 total apartments / 55 apartments booked. 98% apartments booked.
Work Description in Building Type B Bldg Wing B 1 B 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the flats / premises
work-in-progress98% done
98% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress98% done
98% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Navkar Estate And Homes Pvt Ltd
for Project
Navkar City Phase Ii Part I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation