Project overview

Navare Plaza is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700020680. Navare Plaza is located at 8028 8029 8030. This is a New being developed by Om Developers.

Navare Plaza has Office space & Shop Apartments with carpet areas ranging from 125 to 594 Sq.ft. Carpet. The Project has total 64 of which 37 are currently available for sale.

Navare Plaza is being developed on a total land area of 15023 Sq.ft. Navare Plaza has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Siddhivinayak GardensA1 Buildcon991, 2, 3 And 1001830-12-2024 00:00:00
Shree ShaliniJay Service And ConsultantCts No 251 And 252A30-09-2023 00:00:00
M Square It ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Shree Ganesh SymphonyPawar GroupS. No.172, H.No.1/801-12-2025 00:00:00
Trimurti GardenSai Narayan DevelopersSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRaj GroupS No 39, H No 1,230-12-2022 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Balaji AnnexM/S Om Swayambhu Siddhivinayak Builders And DevelopersSurvey No 93/3, 93/4, 93/530-12-2026 00:00:00
Arya ArianaAshapura Corporation5664/A30-03-2024 00:00:00
GajananGk BuildconB6330-06-2023 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Empire Industrial Centrum Phase-IiiEmpire Industries Limited22R30-03-2026 00:00:00
Empire Industrial Centrum Phase-IvEmpire Industries Limited2230-03-2025 00:00:00
Seasons Sahara Building No 2Samarth Sai Builders & DevelopersS No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan30-12-2024 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Rajeshwari Residency Phase IiShree Siddhi ConstructionSurvey No 30/2, 30/3/2/1, 30/3/2/230-03-2025 00:00:00
Pinnacle RoyalPinnacle InfraGut No41, Hissa No 20, Plot No 1530-03-2023 00:00:00
Kohinoor AashiyanaKgi Realty Private Limited24/3 37/130-10-2024 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Platinum Square B 1Radmin Developers & Consultants Private Limited21/2,21/3/1,22/1/2,1/3,1/5,1/6,1/830-05-2025 00:00:00
Aditya NishantPremnarayan Shukla14229-01-2023 00:00:00
Ten X Habitat Raymond Realty Tower JRaymond Limited126B 1/1 Part, 129/1 Part30-06-2025 00:00:00
Nana Patil RoyalM/S. J. R. Y. EnterprisesPardi No 3/1, 3/230-09-2022 00:00:00
Elite 2 ShopsPalava Dwellers Private Limited97 Pt 150/4 Pt31-07-2020 00:00:00
Elite 1 ShopPalava Dwellers Private Limited96/2 Pt, 97 Pt31-07-2020 00:00:00
Regalia ShopsPalava Dwellers Private Limited96/2 Pt, 100/2 Pt31-07-2020 00:00:00
Urbano 2 ShopsPalava Dwellers Private Limited52 Pt ,And 144/9 Pt31-07-2020 00:00:00
New Shiv-Shakti ChsShree Laxmi DevelopersPlot 83 S No 7030-03-2023 00:00:00
Clara ShopsPalava Dwellers Private Limited144 4 Pt 144 9 Pt31-07-2020 00:00:00
EmeraldApr Realty3/7A30-11-2024 00:00:00
Hubs InfrastructureHub's Infrastructure110/1/A/1/B/730-06-2024 00:00:00
Shiv Aangan ResidencyDhananjay DevelopersSurvey No 40 Hissa No 5/2 And 5/630-03-2025 00:00:00
Nana Patil ResidencyQuality Builders & DevelopersPardi No 3, Hissa No 1, Hissa No 231-01-2021 00:00:00
Satyam OrchidGirija InfrastructurePlot No 1030-12-2021 00:00:00
Sai Lake AtulyamMatoshree ConstructionOld 129/1/A Paiki-3 Plot No. 5, New 129/1/Sh/Plot No. 530-12-2025 00:00:00
Iris Mira Road EJeetendra Alias Ravi Amarnath Kapoor21/1, 24/230-12-2022 00:00:00
Sai EnclaveVighnaharta DevelopersSurvey No 57 Hissa No 1 And 2 Part30-12-2023 00:00:00
Lakeside 1 ShopsPalava Dwellers Private Limited150/6 Pt 150/9 Pt 73/1 Pt 73/2 Pt31-07-2020 00:00:00
Lakeside 2 ShopsPalava Dwellers Private Limited69/1 Pt, 69/2 Pt,150/8 Pt31-07-2020 00:00:00
Pritam SolitaireJayesh Pramodbhai ThakkarSurvey No 44A Hissa No 1/1B Part30-12-2025 00:00:00
Chandraprabha HeightsAdwait ConstructionsCts No . 11963 To 1196730-06-2022 00:00:00
Sai Darshan - FShree Sai AssociatesGut No.112/A30-06-2022 00:00:00
Lodha Ithink BMacrotech Developers Limited166 1Bpt28-02-2022 00:00:00
Deep JyotDeep RealtorsS.No.63, H. No.330-06-2023 00:00:00
Prince AvenueShakti DevelopersSurvey Number 15 Hissa 4A 4B02-09-2023 00:00:00
Savitri SmrutiAdwait Constructions9028A , 9029 To 903130-06-2022 00:00:00
North Mlcp ShopPalava Dwellers Private Limited98 Pt31-07-2020 00:00:00
Runwal Gardens Phase 2 Bldg No 13-17Runwal Residency Private LimitedSurvey Nos. 9/1 To 9/8Pt, 12/7Pt, 12/8Pt, 12/9Pt, 12/10Pt, 12/11Pt, 12/12Pt,12/13Pt, 14/2Apt 14/2B Pt 14/4Pt30-06-2025 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Sharada DeepNyp Developers4, 14/ H. No.5/43A,30-06-2022 00:00:00
Udaynagar ChsSameer Mukund NatuF.P. No. 28730-06-2025 00:00:00
Sudam ResidencySaikrupa DevelopersSurvey No. 90, Hissa No. 9/D30-06-2024 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Jagannath Co-Operative Housing Society LtdM/S. Shrusti BuildcomCts No 340 Tika No 1330-06-2023 00:00:00
Dosti West County - Phase 4- Dosti PineDosti Enterprises17/4Pt,17/5Pt.17/7A Pt,17/7B Pt, 17/8Pt, 17/9Pt, 17/11A Pt, 17/11B Pt, 17/11C Pt, 18/3Pt, 18/4Pt, 18/5Pt, 18/6B Pt, 18/7 Pt,18/8 Pt, 18/9Pt, 18/10A Pt30-12-2027 00:00:00
Project Details
  • Project:
    Navare Plaza
  • Location:
  • 8028 8029 8030
  • Const. Stage:
    New
  • Possession:
    28 Aug 2022
Developer Details

  • Developer:
    Om Developers
  • Phone:
  • Address:
  • Malhar Sankool
Project RERA Details
MAHA REARA No: P51700020680
Project Type Others
RERA Project Status New
Architect A S Dastane And Associates
Funding Bank G P PARSIK BANK
Proposed Possession 28 Aug 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 01 Dec 2023
Last Retrived 26 Jul 2025
Navare Plaza QR Code
Navare Plaza
MahaRERA - P51700020680
Apartment Details & Configuration
TypeArea
2.5 BHK135.08 Sq.mts. ( 1454 Sq.ft. )
2.5 BHK135.12 Sq.mts. ( 1454 Sq.ft. )
Office space23.64 Sq.mts. ( 254 Sq.ft. )
Office space26.93 Sq.mts. ( 290 Sq.ft. )
Office space28.2 Sq.mts. ( 304 Sq.ft. )
Office space28.86 Sq.mts. ( 311 Sq.ft. )
Office space13.77 Sq.mts. ( 148 Sq.ft. )
Office space14.75 Sq.mts. ( 159 Sq.ft. )
Office space14.76 Sq.mts. ( 159 Sq.ft. )
Office space15.62 Sq.mts. ( 168 Sq.ft. )
Office space15.63 Sq.mts. ( 168 Sq.ft. )
Office space17.23 Sq.mts. ( 185 Sq.ft. )
Office space17.96 Sq.mts. ( 193 Sq.ft. )
Office space34.43 Sq.mts. ( 371 Sq.ft. )
Office space34.44 Sq.mts. ( 371 Sq.ft. )
Office space34.45 Sq.mts. ( 371 Sq.ft. )
Office space34.92 Sq.mts. ( 376 Sq.ft. )
Office space36.12 Sq.mts. ( 389 Sq.ft. )
Office space55.2 Sq.mts. ( 594 Sq.ft. )
Shop36.44 Sq.mts. ( 392 Sq.ft. )
Shop37 Sq.mts. ( 398 Sq.ft. )
Shop38.9 Sq.mts. ( 419 Sq.ft. )
Shop40.31 Sq.mts. ( 434 Sq.ft. )
Shop19.04 Sq.mts. ( 205 Sq.ft. )
Shop22.59 Sq.mts. ( 243 Sq.ft. )
Shop15 Sq.mts. ( 161 Sq.ft. )
Shop29.9 Sq.mts. ( 322 Sq.ft. )
Shop33.61 Sq.mts. ( 362 Sq.ft. )
Shop26.37 Sq.mts. ( 284 Sq.ft. )
Shop11.58 Sq.mts. ( 125 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Navare Plazalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Work In Progress
Landscaping & Tree Planting100% completed
95% Complete
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains
Work In Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Work In Progress
Water Supply80% completed
80% Complete
Work In Progress
Buildings / Wings in Navare Plaza
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Navare Plaza by Om Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

15023 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

64 apartments in total
Total
64
Booked
27
Available
37

Saleable Area Statistics (Sq. ft.)

21078 Total
Total
21078
Booked
6981
Available
14097
Total 64 apartments in project. 27 apartments booked. 42% apartments booked.
Total 21078 Sq.ft. saleable area. 6981 saleable area booked.
33% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingAug 20215001001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK135.08 Sq.mts. ( 1454 Sq.ft. )1
None Booked0% Booked
0% Booked
2.5 BHK135.12 Sq.mts. ( 1454 Sq.ft. )2
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingAug 20217000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office space23.64 Sq.mts. ( 254 Sq.ft. )4
2 Booked50% Booked
50% Booked
Office space26.93 Sq.mts. ( 290 Sq.ft. )4
2 Booked50% Booked
50% Booked
Office space28.2 Sq.mts. ( 304 Sq.ft. )3
None Booked0% Booked
0% Booked
Office space28.86 Sq.mts. ( 311 Sq.ft. )4
None Booked0% Booked
0% Booked
Office space13.77 Sq.mts. ( 148 Sq.ft. )4
2 Booked50% Booked
50% Booked
Office space14.75 Sq.mts. ( 159 Sq.ft. )2
1 Booked50% Booked
50% Booked
Office space14.76 Sq.mts. ( 159 Sq.ft. )2
1 Booked50% Booked
50% Booked
Office space15.62 Sq.mts. ( 168 Sq.ft. )5
3 Booked60% Booked
60% Booked
Office space15.63 Sq.mts. ( 168 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space17.23 Sq.mts. ( 185 Sq.ft. )3
2 Booked66% Booked
66% Booked
Office space17.96 Sq.mts. ( 193 Sq.ft. )4
2 Booked50% Booked
50% Booked
Office space34.43 Sq.mts. ( 371 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space34.44 Sq.mts. ( 371 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space34.45 Sq.mts. ( 371 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space34.92 Sq.mts. ( 376 Sq.ft. )8
3 Booked37% Booked
37% Booked
Office space36.12 Sq.mts. ( 389 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space55.2 Sq.mts. ( 594 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop36.44 Sq.mts. ( 392 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop37 Sq.mts. ( 398 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.9 Sq.mts. ( 419 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop40.31 Sq.mts. ( 434 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.04 Sq.mts. ( 205 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop22.59 Sq.mts. ( 243 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15 Sq.mts. ( 161 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop29.9 Sq.mts. ( 322 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop33.61 Sq.mts. ( 362 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.37 Sq.mts. ( 284 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.58 Sq.mts. ( 125 Sq.ft. )1
None Booked0% Booked
0% Booked
61 total apartments / 27 apartments booked. 44% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Om Developers
for Project
Navare Plaza
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation