Project overview

Naval Baug Building No 1 And 2B is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000015716. Naval Baug Building No 1 And 2B is located at 401602. This is a New Project being developed by Ahura Mazda Developers.

Naval Baug Building No 1 And 2B has 1 BHK & 2 BHK Apartments with carpet areas ranging from 326 to 459 Sq.ft. Carpet. The Project has total 42 of which 42 are currently available for sale.

Naval Baug Building No 1 And 2B is being developed on a total land area of 15769 Sq.ft. out of which 9203 Sq.ft. i.e 58% is reserved for recreational purposes. Naval Baug Building No 1 And 2B has 3 Wings / Towers Building 2B,Building No 1A,Building No 1B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Naval Baug Building No 1 And 2B
  • Location:
  • 401602
  • Const. Stage:
    New Project
  • Possession:
    30 Mar 2022
Developer Details

  • Developer:
    Ahura Mazda Developers
  • Phone:
  • Address:
  • A-1, Avishkar Chs Ltd., Main Road, Near West Coast, Masoli, 401602
Project RERA Details
MAHA REARA No: P99000015716
Project Type Residential
RERA Project Status New Project
Funding Bank Kotak Mahindra Bank
Proposed Possession 30 Mar 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Mar 2018
Last Retrived 28 Jul 2025
Naval Baug Building No 1 And 2B QR Code
Naval Baug Building No 1 And 2B
MahaRERA - P99000015716
Apartment Details & Configuration
TypeArea
1 BHK40.76 Sq.mts. ( 439 Sq.ft. )
1 BHK43.14 Sq.mts. ( 464 Sq.ft. )
1 BHK43.15 Sq.mts. ( 464 Sq.ft. )
1 BHK46.89 Sq.mts. ( 505 Sq.ft. )
1 BHK30.11 Sq.mts. ( 324 Sq.ft. )
1 BHK32.89 Sq.mts. ( 354 Sq.ft. )
1 BHK34.02 Sq.mts. ( 366 Sq.ft. )
1 BHK35.29 Sq.mts. ( 380 Sq.ft. )
2 BHK42.54 Sq.mts. ( 458 Sq.ft. )
1 BHK30.33 Sq.mts. ( 326 Sq.ft. )
1 BHK33.1 Sq.mts. ( 356 Sq.ft. )
1 BHK33.34 Sq.mts. ( 359 Sq.ft. )
1 BHK35.97 Sq.mts. ( 387 Sq.ft. )
2 BHK42.65 Sq.mts. ( 459 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Naval Baug Building No 1 And 2Blast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Work Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Not Started
Street Lighting
Work Not Started
Treatment And Disposal Of Sewage And Sullage Water
Work Not Started
Water Conservation, Rain water Harvesting
Na
Water Supply
Work Not Started
Buildings / Wings in Naval Baug Building No 1 And 2B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Naval Baug Building No 1 And 2B by Ahura Mazda Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

15769 Sq. ft.

Project Area

9203 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

42 apartments in total
Total
42
Booked
0
Available
42

Saleable Area Statistics (Sq. ft.)

16927 Total
Total
16927
Booked
0
Available
16927
Total 42 apartments in project. 0 apartments booked. 0% apartments booked.
Total 16927 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building 2B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 2BMar 202141010012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.76 Sq.mts. ( 439 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK43.14 Sq.mts. ( 464 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK43.15 Sq.mts. ( 464 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK46.89 Sq.mts. ( 505 Sq.ft. )3
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building 2BCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 1A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1AMar 20214101003
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.11 Sq.mts. ( 324 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK32.89 Sq.mts. ( 354 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK34.02 Sq.mts. ( 366 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK35.29 Sq.mts. ( 380 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK42.54 Sq.mts. ( 458 Sq.ft. )3
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 1ACompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 1B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1BMar 20214101003
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.33 Sq.mts. ( 326 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK33.1 Sq.mts. ( 356 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK33.34 Sq.mts. ( 359 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK35.97 Sq.mts. ( 387 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK42.65 Sq.mts. ( 459 Sq.ft. )3
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 1BCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Ahura Mazda Developers
for Project
Naval Baug Building No 1 And 2B
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation