Project overview
Naval Baug Building No 1 And 2B is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000015716. Naval Baug Building No 1 And 2B is located at 401602. This is a New Project being developed by Ahura Mazda Developers.
Naval Baug Building No 1 And 2B has 1 BHK & 2 BHK Apartments with carpet areas ranging from 326 to 459 Sq.ft. Carpet. The Project has total 42 of which 42 are currently available for sale.
Naval Baug Building No 1 And 2B is being developed on a total land area of 15769 Sq.ft. out of which 9203 Sq.ft. i.e 58% is reserved for recreational purposes. Naval Baug Building No 1 And 2B has 3 Wings / Towers Building 2B,Building No 1A,Building No 1B
| Project | Developer | Location | Possession |
-
Developer:
Ahura Mazda Developers
-
Phone:
-
Address:
-
A-1, Avishkar Chs Ltd., Main Road, Near West Coast, Masoli, 401602
| MAHA REARA No: |
P99000015716 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
Kotak Mahindra Bank |
| Proposed Possession |
30 Mar 2022 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
14 Mar 2018 |
| Last Retrived |
28 Jul 2025 |
Naval Baug Building No 1 And 2B QR Code
Naval Baug Building No 1 And 2B
MahaRERA - P99000015716
| Type | Area |
| 1 BHK | 40.76 Sq.mts. ( 439 Sq.ft. ) |
| 1 BHK | 43.14 Sq.mts. ( 464 Sq.ft. ) |
| 1 BHK | 43.15 Sq.mts. ( 464 Sq.ft. ) |
| 1 BHK | 46.89 Sq.mts. ( 505 Sq.ft. ) |
| 1 BHK | 30.11 Sq.mts. ( 324 Sq.ft. ) |
| 1 BHK | 32.89 Sq.mts. ( 354 Sq.ft. ) |
| 1 BHK | 34.02 Sq.mts. ( 366 Sq.ft. ) |
| 1 BHK | 35.29 Sq.mts. ( 380 Sq.ft. ) |
| 2 BHK | 42.54 Sq.mts. ( 458 Sq.ft. ) |
| 1 BHK | 30.33 Sq.mts. ( 326 Sq.ft. ) |
| 1 BHK | 33.1 Sq.mts. ( 356 Sq.ft. ) |
| 1 BHK | 33.34 Sq.mts. ( 359 Sq.ft. ) |
| 1 BHK | 35.97 Sq.mts. ( 387 Sq.ft. ) |
| 2 BHK | 42.65 Sq.mts. ( 459 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Naval Baug Building No 1 And 2Blast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Work Not Started |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Work Not Started |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Work Not Started |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Work Not Started |
|
|
|
Work Not Started |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Work Not Started |
Water Conservation, Rain water Harvesting
|
|
Na |
|
|
|
Work Not Started |
Buildings / Wings in Naval Baug Building No 1 And 2B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Naval Baug Building No 1 And 2B by Ahura Mazda Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
42
apartments in total
Saleable Area Statistics (Sq. ft.)
16927
Total
Total 42 apartments in project. 0 apartments booked. 0% apartments booked.
Total 16927 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 2B | Mar 2021 | 4 | 1 | 0 | 1 | 0 | 0 | 12 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 40.76 Sq.mts. ( 439 Sq.ft. ) | 3 | |
| 1 BHK | 43.14 Sq.mts. ( 464 Sq.ft. ) | 3 | |
| 1 BHK | 43.15 Sq.mts. ( 464 Sq.ft. ) | 3 | |
| 1 BHK | 46.89 Sq.mts. ( 505 Sq.ft. ) | 3 | |
12 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building 2B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 1A | Mar 2021 | 4 | 1 | 0 | 1 | 0 | 0 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30.11 Sq.mts. ( 324 Sq.ft. ) | 3 | |
| 1 BHK | 32.89 Sq.mts. ( 354 Sq.ft. ) | 3 | |
| 1 BHK | 34.02 Sq.mts. ( 366 Sq.ft. ) | 3 | |
| 1 BHK | 35.29 Sq.mts. ( 380 Sq.ft. ) | 3 | |
| 2 BHK | 42.54 Sq.mts. ( 458 Sq.ft. ) | 3 | |
15 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No 1A | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 1B | Mar 2021 | 4 | 1 | 0 | 1 | 0 | 0 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30.33 Sq.mts. ( 326 Sq.ft. ) | 3 | |
| 1 BHK | 33.1 Sq.mts. ( 356 Sq.ft. ) | 3 | |
| 1 BHK | 33.34 Sq.mts. ( 359 Sq.ft. ) | 3 | |
| 1 BHK | 35.97 Sq.mts. ( 387 Sq.ft. ) | 3 | |
| 2 BHK | 42.65 Sq.mts. ( 459 Sq.ft. ) | 3 | |
15 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Building No 1B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Ahura Mazda Developers
for Project
Naval Baug Building No 1 And 2B
last updated on
28 Jul 2025 as per information obtained from MARA RERA.