Nasar Enclave Sale Building A And B Wing is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800028733. Nasar Enclave Sale Building A And B Wing is located at 195 Part, 208 Part, 812 And 813. This is a New being developed by M/S. Nasar Associates.

Nasar Enclave Sale Building A And B Wing has Hostel Room, Hostel room & showroom Apartments with carpet areas ranging from 1144 to 515 Sq.ft. Carpet. The Project has total 192 of which 157 are currently available for sale.

Nasar Enclave Sale Building A And B Wing is being developed on a total land area of 20871 Sq.ft. Nasar Enclave Sale Building A And B Wing has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nasar Enclave Sale Building A And B Wing
  • Location:
  • 195 Part, 208 Part, 812 And 813
  • Const. Stage:
    New
  • Possession:
    30 Jun 2026
Developer Details

  • Developer:
    M/S. Nasar Associates
  • Phone:
  • Address:
  • Prashal Society
Project RERA Details
MAHA REARA No: P51800028733
Project Type Others
RERA Project Status New
Architect Aashish Solanki
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 30 Jun 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 25 Mar 2021
Last Retrived 26 Jul 2025
Nasar Enclave Sale Building A And B Wing QR Code
Nasar Enclave Sale Building A And B Wing
MahaRERA - P51800028733
Apartment Details & Configuration
TypeArea
1 BHK47.77 Sq.mts. ( 514 Sq.ft. )
2 BHK64.71 Sq.mts. ( 697 Sq.ft. )
3 BHK98.64 Sq.mts. ( 1062 Sq.ft. )
showroom154.23 Sq.mts. ( 1660 Sq.ft. )
showroom180.12 Sq.mts. ( 1939 Sq.ft. )
Hostel Room14.25 Sq.mts. ( 153 Sq.ft. )
Hostel Room24.26 Sq.mts. ( 261 Sq.ft. )
Hostel room24.42 Sq.mts. ( 263 Sq.ft. )
Hostel Room29.23 Sq.mts. ( 315 Sq.ft. )
Hostel Room30.41 Sq.mts. ( 327 Sq.ft. )
Hostel Room30.51 Sq.mts. ( 328 Sq.ft. )
Hostel Room31.78 Sq.mts. ( 342 Sq.ft. )
Hostel Room33.76 Sq.mts. ( 363 Sq.ft. )
Hostel Room44.93 Sq.mts. ( 484 Sq.ft. )
Hostel Room47.87 Sq.mts. ( 515 Sq.ft. )
showroom106.32 Sq.mts. ( 1144 Sq.ft. )
showroom220.98 Sq.mts. ( 2379 Sq.ft. )
showroom394.17 Sq.mts. ( 4243 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nasar Enclave Sale Building A And B Winglast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space25% completed
25% Complete
As Per Plan Paved Rg
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station25% completed
25% Complete
As Per Requirement Of Reliance Energy
Energy management
Na
Fire Protection And Fire Safety Requirements25% completed
25% Complete
As Per Cfo Noc
Landscaping & Tree Planting
As Per Tree Noc
Open Parking
Yet Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)25% completed
25% Complete
Internal Chambers
Solid Waste Management And Disposal
Lines Proposed No Stp Proposed
Storm Water Drains
Will Be Provided As Per Requirement Of Mcgm
Street Lighting
Will Be Connected To Municipal Storm Water Drain
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Recharge Pit Proposed
Buildings / Wings in Nasar Enclave Sale Building A And B Wing
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nasar Enclave Sale Building A And B Wing by M/S. Nasar Associateslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

20871 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

192 apartments in total
Total
192
Booked
35
Available
157

Saleable Area Statistics (Sq. ft.)

101654 Total
Total
101654
Booked
30588
Available
71066
Total 192 apartments in project. 35 apartments booked. 18% apartments booked.
Total 101654 Sq.ft. saleable area. 30588 saleable area booked.
30% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202516121000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK47.77 Sq.mts. ( 514 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK64.71 Sq.mts. ( 697 Sq.ft. )26
18 Booked69% Booked
69% Booked
3 BHK98.64 Sq.mts. ( 1062 Sq.ft. )25
17 Booked68% Booked
68% Booked
showroom154.23 Sq.mts. ( 1660 Sq.ft. )1
None Booked0% Booked
0% Booked
showroom180.12 Sq.mts. ( 1939 Sq.ft. )1
None Booked0% Booked
0% Booked
54 total apartments / 35 apartments booked. 64% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress58% done
58% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202516121000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Hostel Room14.25 Sq.mts. ( 153 Sq.ft. )14
None Booked0% Booked
0% Booked
Hostel Room24.26 Sq.mts. ( 261 Sq.ft. )13
None Booked0% Booked
0% Booked
Hostel room24.42 Sq.mts. ( 263 Sq.ft. )14
None Booked0% Booked
0% Booked
Hostel Room29.23 Sq.mts. ( 315 Sq.ft. )14
None Booked0% Booked
0% Booked
Hostel Room30.41 Sq.mts. ( 327 Sq.ft. )13
None Booked0% Booked
0% Booked
Hostel Room30.51 Sq.mts. ( 328 Sq.ft. )14
None Booked0% Booked
0% Booked
Hostel Room31.78 Sq.mts. ( 342 Sq.ft. )13
None Booked0% Booked
0% Booked
Hostel Room33.76 Sq.mts. ( 363 Sq.ft. )13
None Booked0% Booked
0% Booked
Hostel Room44.93 Sq.mts. ( 484 Sq.ft. )14
None Booked0% Booked
0% Booked
Hostel Room47.87 Sq.mts. ( 515 Sq.ft. )13
None Booked0% Booked
0% Booked
showroom106.32 Sq.mts. ( 1144 Sq.ft. )1
None Booked0% Booked
0% Booked
showroom220.98 Sq.mts. ( 2379 Sq.ft. )1
None Booked0% Booked
0% Booked
showroom394.17 Sq.mts. ( 4243 Sq.ft. )1
None Booked0% Booked
0% Booked
138 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress58% done
58% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S. Nasar Associates
for Project
Nasar Enclave Sale Building A And B Wing
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation