Project overview

Narang Urbane Housing Forum - Phase Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000006562. Narang Urbane Housing Forum - Phase Ii is located at 401501, Palghar. This is a On-Going Project being developed by Yamuna Realty Private Limited.

Narang Urbane Housing Forum - Phase Ii has 1 BHK WING A, 1 BHK WING B, 1 BHK WING C, 1 BHK WING D, 1 BHK WING E, 1RK WING A, 1RK WING C, 1RK WING E, SHOP WING A S14 & SHOP WING E S15 Apartments with carpet areas ranging from 124 to 356 Sq.ft. Carpet. The Project has total 194 of which 164 are currently available for sale.

Narang Urbane Housing Forum - Phase Ii is being developed on a total land area of 77178 Sq.ft. Narang Urbane Housing Forum - Phase Ii has 6 Wings / Towers Farm Block Bldg No 1,Farm Block Bldg No 2,Farm Block Bldg No 3,Farm Block Bldg No 4,Farm Block Bldg No 5,Farm Block Bldg No 6

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Narang Urbane Housing Forum - Phase Ii
  • Location:
  • 401501, Palghar
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2022
Developer Details

  • Developer:
    Yamuna Realty Private Limited
  • Phone:
  • Address:
  • 96B Ground Floor, Narang Manor, 15Th Road, Agarwal Nursing Home, Bandra West, 400050
Project RERA Details
MAHA REARA No: P99000006562
Project Type Residential
RERA Project Status On-Going Project
Funding Bank HDFC Bank Limited
Proposed Possession 31 Dec 2022
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 21 Aug 2023
Last Retrived 28 Jul 2025
Narang Urbane Housing Forum - Phase Ii QR Code
Narang Urbane Housing Forum - Phase Ii
MahaRERA - P99000006562
Apartment Details & Configuration
TypeArea
2 BHK44.51 Sq.mts. ( 479 Sq.ft. )
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )
SHOP S1311.03 Sq.mts. ( 119 Sq.ft. )
1 BHK WING A33.05 Sq.mts. ( 356 Sq.ft. )
1RK WING A22.83 Sq.mts. ( 246 Sq.ft. )
SHOP WING A S1411.55 Sq.mts. ( 124 Sq.ft. )
SHOP WING E S1516.43 Sq.mts. ( 177 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Narang Urbane Housing Forum - Phase Iilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Narang Urbane Housing Forum - Phase Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Narang Urbane Housing Forum - Phase Ii by Yamuna Realty Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

77178 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

194 apartments in total
Total
194
Booked
30
Available
164

Saleable Area Statistics (Sq. ft.)

80704 Total
Total
80704
Booked
11783
Available
68922
Total 194 apartments in project. 30 apartments booked. 15% apartments booked.
Total 80704 Sq.ft. saleable area. 11783 saleable area booked.
15% area booked.

Farm Block Bldg No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Farm Block Bldg No 1Jan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.51 Sq.mts. ( 479 Sq.ft. )16
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )4
None Booked0% Booked
0% Booked
20 total apartments / 1 apartments booked. 5% apartments booked.
Work Description in Building Farm Block Bldg No 1Completion
Excavation
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Farm Block Bldg No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Farm Block Bldg No 2Jan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.51 Sq.mts. ( 479 Sq.ft. )16
6 Booked37% Booked
37% Booked
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )4
None Booked0% Booked
0% Booked
SHOP S1311.03 Sq.mts. ( 119 Sq.ft. )2
None Booked0% Booked
0% Booked
22 total apartments / 6 apartments booked. 27% apartments booked.
Work Description in Building Farm Block Bldg No 2Completion
Excavation
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Farm Block Bldg No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Farm Block Bldg No 3Jan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.51 Sq.mts. ( 479 Sq.ft. )8
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )2
None Booked0% Booked
0% Booked
10 total apartments / 1 apartments booked. 10% apartments booked.
Work Description in Building Farm Block Bldg No 3Completion
Excavation
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Farm Block Bldg No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Farm Block Bldg No 4Jan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.51 Sq.mts. ( 479 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )4
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Farm Block Bldg No 4Completion
Excavation
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Farm Block Bldg No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Farm Block Bldg No 5Jan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.51 Sq.mts. ( 479 Sq.ft. )16
2 BHK55.51 Sq.mts. ( 598 Sq.ft. )4
None Booked0% Booked
0% Booked
20 total apartments / 1 apartments booked. 5% apartments booked.
Work Description in Building Farm Block Bldg No 5Completion
Excavation
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Farm Block Bldg No 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Farm Block Bldg No 6Dec 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK WING A33.05 Sq.mts. ( 356 Sq.ft. )18
5 Booked27% Booked
27% Booked
1 BHK WING B33.05 Sq.mts. ( 356 Sq.ft. )20
1 BHK WING C33.05 Sq.mts. ( 356 Sq.ft. )18
1 BHK WING D33.05 Sq.mts. ( 356 Sq.ft. )20
4 Booked20% Booked
20% Booked
1 BHK WING E33.05 Sq.mts. ( 356 Sq.ft. )18
7 Booked38% Booked
38% Booked
1RK WING A22.83 Sq.mts. ( 246 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK WING C22.83 Sq.mts. ( 246 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK WING E22.83 Sq.mts. ( 246 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP WING A S1411.55 Sq.mts. ( 124 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP WING E S1516.43 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
102 total apartments / 21 apartments booked. 20% apartments booked.
Work Description in Building Farm Block Bldg No 6Completion
Excavation
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Yamuna Realty Private Limited
for Project
Narang Urbane Housing Forum - Phase Ii
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation