Project overview

Nandanvan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800012073. Nandanvan is located at 126Tpsiii. This is a Ongoing being developed by Kosmos Developer.

Nandanvan has 1bhk, 2 BHK, 2bhk, 3bhk & Shop Apartments with carpet areas ranging from 1109 to 1063 Sq.ft. Carpet. The Project has total 76 of which 0 are currently available for sale.

Nandanvan is being developed on a total land area of 24816 Sq.ft. Nandanvan has 1 Wings / Towers Nandanvan

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Nandanvan
  • Location:
  • 126Tpsiii
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    Kosmos Developer
  • Phone:
  • Address:
  • Kosmos Kedar Darshan Building
Project RERA Details
MAHA REARA No: P51800012073
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ketan Vaidya Associates
Funding Bank CANARA BANK
Proposed Possession 30 Jun 2021
Revised Possession 30 Jun 2021
Extended Possession 30 Jun 2023
Litigations No Litigations
Last Modified 06 Mar 2023
Last Retrived 26 Jul 2025
Nandanvan QR Code
Nandanvan
MahaRERA - P51800012073
Apartment Details & Configuration
TypeArea
1bhk33.65 Sq.mts. ( 362 Sq.ft. )
1bhk37 Sq.mts. ( 398 Sq.ft. )
1bhk46.82 Sq.mts. ( 504 Sq.ft. )
2 BHK43.66 Sq.mts. ( 470 Sq.ft. )
2 BHK44.13 Sq.mts. ( 475 Sq.ft. )
2 BHK64.87 Sq.mts. ( 698 Sq.ft. )
2 BHK64.97 Sq.mts. ( 699 Sq.ft. )
2 BHK67.89 Sq.mts. ( 731 Sq.ft. )
2 BHK80.28 Sq.mts. ( 864 Sq.ft. )
2bhk42.43 Sq.mts. ( 457 Sq.ft. )
2bhk51.21 Sq.mts. ( 551 Sq.ft. )
2bhk52.18 Sq.mts. ( 562 Sq.ft. )
2bhk54.33 Sq.mts. ( 585 Sq.ft. )
2bhk58.91 Sq.mts. ( 634 Sq.ft. )
3bhk88.47 Sq.mts. ( 952 Sq.ft. )
3bhk96.57 Sq.mts. ( 1039 Sq.ft. )
3bhk98.72 Sq.mts. ( 1063 Sq.ft. )
3bhk103 Sq.mts. ( 1109 Sq.ft. )
Shop92.25 Sq.mts. ( 993 Sq.ft. )
Shop27 Sq.mts. ( 291 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nandanvanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Construction Of Meter Room Completed At Ground Flo
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Fire Fighting System Completed As Proposed In Cfo
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Drainage Work Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Ground Development Work Completed On Site
Street Lighting100% completed
95% Complete
Existing Street Light Poles Available At Plot Boun
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Treatment Plant Not Proposed. Drainage Will Be Con
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting Completed.
Water Supply100% completed
95% Complete
Bore Well Water Available. Water Supply From Mcgm
Buildings / Wings in Nandanvan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nandanvan by Kosmos Developerlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

24816 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

76 apartments in total
Total
76
Booked
76
Available
0

Saleable Area Statistics (Sq. ft.)

54646 Total
Total
54646
Booked
54646
Available
0
Total 76 apartments in project. 76 apartments booked. 100% apartments booked.
Total 54646 Sq.ft. saleable area. 54646 saleable area booked.
100% area booked.

Nandanvan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
NandanvanJun 20212410100125
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1bhk33.65 Sq.mts. ( 362 Sq.ft. )1
1 Booked100% Booked
100% Booked
1bhk37 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
1bhk46.82 Sq.mts. ( 504 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK43.66 Sq.mts. ( 470 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK44.13 Sq.mts. ( 475 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK64.87 Sq.mts. ( 698 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK64.97 Sq.mts. ( 699 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK67.89 Sq.mts. ( 731 Sq.ft. )18
18 Booked100% Booked
100% Booked
2 BHK80.28 Sq.mts. ( 864 Sq.ft. )1
1 Booked100% Booked
100% Booked
2bhk42.43 Sq.mts. ( 457 Sq.ft. )1
1 Booked100% Booked
100% Booked
2bhk51.21 Sq.mts. ( 551 Sq.ft. )1
1 Booked100% Booked
100% Booked
2bhk52.18 Sq.mts. ( 562 Sq.ft. )1
1 Booked100% Booked
100% Booked
2bhk54.33 Sq.mts. ( 585 Sq.ft. )3
3 Booked100% Booked
100% Booked
2bhk58.91 Sq.mts. ( 634 Sq.ft. )6
6 Booked100% Booked
100% Booked
3bhk88.47 Sq.mts. ( 952 Sq.ft. )2
2 Booked100% Booked
100% Booked
3bhk96.57 Sq.mts. ( 1039 Sq.ft. )11
11 Booked100% Booked
100% Booked
3bhk98.72 Sq.mts. ( 1063 Sq.ft. )1
1 Booked100% Booked
100% Booked
3bhk103 Sq.mts. ( 1109 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop92.25 Sq.mts. ( 993 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27 Sq.mts. ( 291 Sq.ft. )1
1 Booked100% Booked
100% Booked
76 total apartments / 76 apartments booked. 100% apartments booked.
Work Description in Building NandanvanCompletion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Kosmos Developer
for Project
Nandanvan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation