Project overview

Namdev Vihar is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700015782. Namdev Vihar is located at Wgqknejzzjjju41kl4gzi86flrande6vvyd0eijxfzs=. This is a Ongoing being developed by Namdev Construction.

Namdev Vihar has 1 BHK & 2 BHK Apartments with carpet areas ranging from 451 to 654 Sq.ft. Carpet. The Project has total 32 of which 11 are currently available for sale.

Namdev Vihar is being developed on a total land area of 7685 Sq.ft. out of which 5199 Sq.ft. i.e 68% is reserved for recreational purposes. Namdev Vihar has 2 Wings / Towers A Wing,C Wing

ProjectDeveloperLocationPossession
Tycoons Square Avenue III Tower CTycoons Avanti Projects LLP421301, Thane31-07-2020 00:00:00
Ami Darshan E WingAarohi Development CorporationLw9iuoyjeniehdmgdspynmaia9ls9smtcs6nisv4esusdvh4xfyabpuch3bynzx831-12-2017 00:00:00
Atmaram Kene ResidencyMega Developers4Gy6dm+Oa5dn2sya3budn4mmgph4whiccyp81e+Cibc=31-12-2018 00:00:00
Tulsi ArianaTulsi RealtyYn/Inv3ksg4+Di4rtyhexkphswyrx5q3k1oomc7ppwo=30-12-2027 00:00:00
Gnp LandmarkGnp LandmarkV9eapplmdqaakd7r8wx4zwu3qhi0pkqhzv3m6az4l5xiv55yvqrp9uspgbucikfj31-01-2027 00:00:00
Vedant Empire Phase Ii Wing B-HamptonMohan Hardasmal TharwaniYsxxasckusmphpvhvx4odae6mvlk7h7ypmjdhwvb2kctxuhjclkz/3Tzwuzpbdepsjufjxasineeictbvviltg==31-12-2027 00:00:00
Patel Colossus Phase IiPatel Group & CoRabesexjnmf7jxo2+Jhsnxizsl2gejvbfe6hjjeht/Kwbwqdrvir6hbolijk23958hgmkfupuxk0+3Jgimgcn+Xdtpchzb8lz9zvog6b97eonxgdazcr17hpcvvslic730-12-2023 00:00:00
AmikrupaAarohi Development CorporationFmy6bjc0q6waxufuwnhb5jcymzfoi3urrwlvjz/Vdksvhqjouxoz2h1fomrxuqhv30-09-2020 00:00:00
Shrushti AvenueKishore DesaiThane, 42130131-12-2017 00:00:00
Nirman HeightsNirman HabitatsPfdoi+Ebhntxujupzujykkvcmu0xl+0Npg6ckm1b5aa=31-08-2018 00:00:00
Ashapura PrasadAshapura Nirman Developers8Fczi9x/Mv9+Syhcoexzx0p4wf8ycrcafy3fhjt2k3fz3mxmoyv1roh22567eqpa31-12-2018 00:00:00
Keshar Aagan Cooperative Housing SocietyGagan HomesLqg+Gmwcepnrxtqahw6o0sfyszg0x+1Ewzeuqqjkkji=30-09-2026 00:00:00
White Square Nx Wing A,C,DShri Ram SthapatyaWluqjk88h7ovuj2iu2jb6afmzwi9thdke7sfy6ngp4bim0wofv0mfhn4mw86jzowvbynrp4/0Zhcmgo3wkuklg==31-12-2028 00:00:00
Sarvoday DattSarvoday CombineQkncfhbl1pxywqhqjq1pxa==31-12-2027 00:00:00
Balaji Exotica-Phase 1Balaji WorldFrwcrqjg4i5vyltsw7cbtv0oioss8m63zvg4sfsyz4i=30-12-2022 00:00:00
Disha Co Operative Housing Society LtdGagan Developers And EngineersRtepl0+Evrlnyltpbowdyctrecccvi/Zzkfhol04qse=31-01-2020 00:00:00
Pluto C WingBhakti Realtora/Nnjlv7jmrc8ruacis9jvw==31-12-2017 00:00:00
V Ten ResidencyV Ten Realty Private LimitedMnr85gjj5fq013n2kkl/5Yhmmgulmzbq4vz+Yelyb6ozkc4dxnkyloheumezn8ka2d3zb04whwm9ccdd13wiqa==30-12-2020 00:00:00
Greenworld Developers Pvt. LtdGreenworld Devlopers Pvt. Ltd.V2oelmvi50fi698fiz1jzq==30-06-2021 00:00:00
ShivamGagan Developers & EngineersQtq3i6homnx6msf0spmbvrsniwunnmxudeld+Iyjalu=31-03-2019 00:00:00
GeetanjaliHonest Homes1Akipm5tyj4osqr3xtf2jilus1qkxwvbgvkgf/Ofavk=31-12-2019 00:00:00
Vedant Empire Phase I Wing A-EagletonMohan Hardasmal TharwaniJzpizfyz6muchuoqfuq/O4o4gxhvpy4p/Jj8ww9+Rxhmfnz/H3vlfbkj4cnugzwq31-12-2027 00:00:00
Geetant AshrayVasudha Construction CompanyEee5+Sjyh3pkbnppaui5lcq+Hfdufpt07wnvbkiahcs=31-12-2024 00:00:00
Atharva HeightsJai Shreegurutatvam Engineers And DevelopersQxr7jnz5miyzmovtn8/Stvyixaqa+Cmax4bcfgir93egpt8tz+1Dc3qs9wcdgh5o31-12-2025 00:00:00
Vaishnavi HeightsVaishnavi ConstructionLx6cgpw/8Zhz5kbpl6wynmxfd8akv1rfwlonqy8lyjy3v0e3ru0nch6wi5ptbvntoorttclivjzkdtr1+Qhh1zheukvpjdxnploegfxwzph0ovdq0ddnm26zlkda+Mac4ly3gpab1c1bka76vumakufz9gn8px/Qrj2po+Ffm5q1rgltcuawzxp3kvkmob3xpokzz3vdyykr07arh2sdnzgsggelgli+Pxxhuxfb6jf1kypqq3ok14mysasa61sq30-07-2024 00:00:00
Proposed Residential,Commercial Bldgs On Plot Bearing Old 96 C 2-Pt - Mayur MahalMayur Group (Rd)9Eyme96k3wpr+Mn7xuwxq+2L4rwwp49ugqrrqb5n5nisyiarevqtotuh4ayjfv9l4p03i3uyqcgx+Mnn7ww2tu1ctjdfs83jdvmkoxg63lo=30-06-2027 00:00:00
BALAJI EXOTICA BUILDING TYPE D PHASE IIIBALAJI WORLDSurvey No 16 H No 8/2 Plot No 230-06-2023 00:00:00
Geeta HeightsMayur Group (Rd)Fu/Cr2n7o0g8vd6w5pefca==31-12-2024 00:00:00
Gayatri NiwasGayatri BuildersYxbgzc9dnycg/4P4qomc9g==31-12-2025 00:00:00
Patel Colossus - Phase IiiPatel Group & CoRabesexjnmf7jxo2+Jhsn8p4c50ap/Vs3r1sjy8adfsuxkoyugdf8ydb1jwhbsrxfbli9blth6ic61gch9nsjpcllivmqtrknwpkfhs+A8+0Nojyrc2ik4zcui2gabew30-12-2023 00:00:00
Patel Colossus Phase 1Patel Group & Co87Xvpl/Hjkmouhceyg+Knev8rfvx3pz2nunxqdrme75uyerucmta+Nxqfwk9+Hpk3jvqk2l+Vaac5fmadazyevqfjjoz7pupahzda23xrajjpbbubh943wynubupeajs30-12-2022 00:00:00
Namdev ViharNamdev ConstructionWgqknejzzjjju41kl4gzi86flrande6vvyd0eijxfzs=30-12-2021 00:00:00
Capsule Business HubMaa Vaishnavi Builders & DevelopersZ7zuobkwr5enjbyj2yt1iq==30-06-2021 00:00:00
Sai VyankateshAnjana Sahebrao ChavanRboevxjqbjlhapsdlp9vfo/Gskx721naxcffishswyiklvo6ugxoov46o+Pii59l30-06-2021 00:00:00
Bharat Residency Shivsai Builders & DevelopersUk2k0zej6aenkrskkjb5hzbo3scj+Q1naj0pa8iqyue=31-05-2018 00:00:00
Shiv SiddhiKedar ConstructionJhmd7lcdc4r3lbwmzmrgd1+Glizqj1le9a7mikab24f9fhv/Bzk+K/Ct+Csc4wfuxzsvre4zcmalnqlhfdxyeessxilcnwmnopnt/U3eh88=30-06-2023 00:00:00
Sai Sharada Chs LtdM Square DevelopersLcznpqnumuti5lfbmomq3dc8+Yme7hgr3wz/S2ifntm=31-05-2026 00:00:00
Shivneri Park Co Op Hsg Soc LtdShree Swastik ConstructionsMod7llobl3byk9qqhdu+Boi3qdntbvqin4ab1a+T73a=31-03-2027 00:00:00
Sai ParkSai Satyam Realty LlpZu++Nxxac8klsshwi4u1fisasbo3hajjju+3Hzk83abuxiqiz0c3vlfllrjmv/Cp31-12-2027 00:00:00
Mangeshi FloraOm RealtyTie8f0uvmzgbfbzpq0i0da==31-03-2019 00:00:00
Shivaay ResidencyRohan Krishnapalsingh ThakurPetn8r6sjemdebp7slri1a==30-06-2019 00:00:00
Manali Heights A WingMitali Construction4Y3wogdkitvh9lr8p3rqdg==31-12-2018 00:00:00
Crosstown Ii C WingTroika Estates Private LimitedSaytgus9iyqipjtuqduj75u925zqv3djx33s0holnauviyvpanmwbciejph4018lily2x3zeouwt2seg4ddwrdguj/P1wjjlx05xsryw6ixnqnxajb2m9h/Iy8yjqt8e01-02-2029 00:00:00
Ammu Co-Op Housing Society LtdStonecraftersBzqybeiscmuoyk6rvvyu4fhvpctzmyswhihwlwfcwia=31-03-2027 00:00:00
Satyam Chopra EnclaveSai Satyam Properties LlpI2kqelisd0agwg4wuwnaieejdfhmfxwn/9Ihm/Wl+Dc=31-03-2027 00:00:00
White SquareShri Raghuveer SthapatyaT3clir7v+Wdg3nyoe3kixxrdbstojwq/U9ftihl8+Z2r9usmextwszj+Bpzibruk31-12-2027 00:00:00
Gayatri AnandGayatri BuildersYmsz3d7p6inklwqosk+T+G==31-12-2028 00:00:00
Royal PlazaRoyal RealtyDhrqnmf5+P6rzfgdiiaeylawwsq2lpntgzf8yhioa88=31-12-2027 00:00:00
Tulsi PalaceV V Construction Co1Zwekh9dymbzao4iyzkrdq==31-12-2027 00:00:00
Sai TulipSai Space CorporationCocfucbhzqbqs2cdv7udm9/Cqqa51ggnmb0jzgmmp8upsjx/Qjlf9ztq6ijt+Eldomfsrzhmqkx8pekuv5+4E/Eg1xel3tjqtl7s9ipiydf8lqwgyehj9/Sdd0lkwloxc++Q6l7dca+229Xqmbybqa3uecmh6gtxg4sdgmze1ck=31-12-2026 00:00:00
Om Yashlaxmi ApartmentOm DevelopersWznjj/Cspjedaclognlpjsdpoq5potwmdqjcwocahjc=31-12-2019 00:00:00
Mohan SkyvilleMohan Lifespaces LlpGwgevpjlmwov/Nzthdnlzp9lcntavkoysaf1ezcx3fsdwbx6stnsmnyceafkluz64vf50fb/Cp5cfj0dvsb2rcjazhtfwerfnjgyk+Fe3eu=30-06-2019 00:00:00
Jigar Construction VenusPraful Haribhai SenjaliaPokoxjnr2n5mpmopxapcojbdhdnhh++H+0Qim5sn+Fk=31-03-2019 00:00:00
Chavan AdvaitamSaideep ConstructionsSknqqfv5s2vys47zhpcna65mvrlv1ym0i8dvvgrwxmzxooylxjr5wymye09rv2dsh8brxn/Kqayvsnrlcngutw==31-12-2026 00:00:00
Pancham Co. Operative Hsg SocietyYuvraj Constructions6E00czvrj4zcvoutsqygma==30-06-2025 00:00:00
Patel MountPatel Group & CoOxdi7nkw/1Uqbae3zfqlnzayhpdvy9uukeniw19m4efvfbj7zlw/W/Fyyuryhryvkj9jgpeuf2ouo/Oyo/9Ozvxgqbngsro3vig1tmtupx7rqxvpcxba1breticj8ahf30-06-2024 00:00:00
V-10 Lake ViewV Ten Realty Private LimitedK1jwely83bobe0zxmspffw==31-12-2027 00:00:00
9 SquareShivsai Homes Builders And Developers LlpRe7abybiwwidvupkt9y8f/Gnqsy8mvho0lsi6srs+K0=31-12-2026 00:00:00
Midtown EveMoon Star Developers LlpPfoyeynzptvudvxq7eudza==30-06-2026 00:00:00
Ambre HeightsOm Sai Builders And DevelopersCqj5j+Qurrjmrzyp0p6qow==31-12-2018 00:00:00
Balaji Arcade Wing AShikhar DevelopersXzvh4tpqvemjwyofjjqydyq38857jeib+Bqtprkinbtwsisuzb5dvvoixhjbezugnmxab9i8fwqgkk9x8qcnj0bc2pa7stifu1kvjzzp1le=31-12-2019 00:00:00
Om PushpanjaliR B CONSTRUCTION3/4/A,3/4/B,3/4/C31-12-2026 00:00:00
Bhakti WindsorBhakti RealtorsOndrnlffefabhmlrmxujha==31-10-2026 00:00:00
PATELS ORIONDESIRE REALTYSurvey No 86/1/131-03-2030 00:00:00
Malhar EnclaveSm Enterprises31-05-2028 00:00:00
Tycoons OrbisM/S. Tycoons DevelopersKif8aq8cobcutuuhp2fndbpm4hlbmn2kssk+Fgier2i=13-06-2023 00:00:00
Stella Co-Operative Housing Society LtdSaksham Group31-12-2027 00:00:00
Raj ResidencyRuturaj Builders31-12-2029 00:00:00
Shelar SupremusShelar Realty31-12-2029 00:00:00
Prathamesh DarshanBuilt In Reality Pratham31-03-2027 00:00:00
Mauli PrideMauli Krupa DevelopersSurvey No- 21, Hissa No- A01-12-2027 00:00:00
Empire TowerEkadanta DevelopersBgvaagj5d3h+Vx3asj/Zh6xmbdr0ae0s3u3+Yfbk/Wi=31-12-2026 00:00:00
Om VardhastaZk RealtyGbf6wiytpgol5rxehfcza8vvaeewn4vxro7gigylcis=31-12-2027 00:00:00
Athena EnclaveJai Mata Di Developers1Xxot0pj957nq6w1yllmtpl8fdcxvgtyxsmjvaotscu=30-12-2023 00:00:00
Siyara VistaShakti Realtors28-02-2030 00:00:00
Nirman ParadiseM/S. Western Arch Company31-12-2028 00:00:00
Abhimanyu ResidencyNAMDEV CONSTRUCTION31-12-2027 00:00:00
Krishna NirmanNirman Shelter31-03-2028 00:00:00
Laxmi SolitaireLaxmi Construction Co30-06-2028 00:00:00
Sunshine Prasad Chsl Tulsidal Nirman Llp31-03-2030 00:00:00
Anand EleganzaV N ConstructionsLzuwjavhx2joxdbcurvl/G==31-03-2026 00:00:00
Tulsi TowerShri Kalki Enterprises66Wgmmkfna4/2Ze8aeimrfov82srk4bdg+Pwbvovqwy=30-09-2020 00:00:00
Shree Anandi HeritageJai Malhar Builders & DevelopersUc2zkhaolys2hh2b0p5mdihmvol/Oz/8Ewgzyedoz4imkotckow2klfumpwxa6jbmnwymey6nmnheosv4sl/Cg==30-05-2023 00:00:00
SAKHA MAULI HEIGHTSSAKHARAM JANARDAN BHOIRSno 10/ Hno1/4A/2/130-06-2023 00:00:00
Suviam Pearl Phase ILaxmi Construction CoTxkdg3i+Ewpfu1ogrhz4knznu1ju/O9bvjkt4juvqf8=31-12-2026 00:00:00
Siyara Business Park KalyanShakti Realtors28-02-2030 00:00:00
Triveni GalleriaGolden Arc Ventures Llp31-12-2029 00:00:00
MadelynDanish Constructions31-03-2030 00:00:00
Time SquarePhoenix Infrastructure And Developers 31-12-2028 00:00:00
Project Details
  • Project:
    Namdev Vihar
  • Location:
  • Wgqknejzzjjju41kl4gzi86flrande6vvyd0eijxfzs=
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Namdev Construction
  • Phone:
  • Address:
  • E Wing White Field
Project RERA Details
MAHA REARA No: P51700015782
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Santosh R Madan
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession 31 Dec 2023
Litigations No Litigations
Last Modified 08 Feb 2023
Last Retrived 13 Feb 2026
Namdev Vihar QR Code
Namdev Vihar
MahaRERA - P51700015782
Apartment Details & Configuration
TypeArea
Shop14.32 Sq.mts. ( 154 Sq.ft. )
Shop25.21 Sq.mts. ( 271 Sq.ft. )
Shop25.87 Sq.mts. ( 278 Sq.ft. )
Shop28.75 Sq.mts. ( 309 Sq.ft. )
1 BHK41.92 Sq.mts. ( 451 Sq.ft. )
2 BHK52.94 Sq.mts. ( 570 Sq.ft. )
2 BHK60.64 Sq.mts. ( 653 Sq.ft. )
2 BHK60.72 Sq.mts. ( 654 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Namdev Viharlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completetd
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management100% completed
95% Complete
Completetd
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Completetd
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completetd
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completetd
Buildings / Wings in Namdev Vihar
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Namdev Vihar by Namdev Constructionlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

7685 Sq. ft.

Project Area

5199 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

32 apartments in total
Total
32
Booked
21
Available
11

Saleable Area Statistics (Sq. ft.)

17305 Total
Total
17305
Booked
12004
Available
5301
Total 32 apartments in project. 21 apartments booked. 65% apartments booked.
Total 17305 Sq.ft. saleable area. 12004 saleable area booked.
69% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMar 20184100010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop14.32 Sq.mts. ( 154 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.21 Sq.mts. ( 271 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.87 Sq.mts. ( 278 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.75 Sq.mts. ( 309 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 20228103033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.92 Sq.mts. ( 451 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK52.94 Sq.mts. ( 570 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK60.64 Sq.mts. ( 653 Sq.ft. )7
5 Booked71% Booked
71% Booked
2 BHK60.72 Sq.mts. ( 654 Sq.ft. )7
4 Booked57% Booked
57% Booked
28 total apartments / 21 apartments booked. 75% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Namdev Construction
for Project
Namdev Vihar
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation