Project overview

Nakshatra Ozone is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000009297. Nakshatra Ozone is located at S.No. 50, Hissa No.7/8,. This is a Ongoing being developed by Jsb Homes Llp.

Nakshatra Ozone has Residential Apartments with carpet areas ranging from 252 to 252 Sq.ft. Carpet. The Project has total 224 of which 101 are currently available for sale.

Nakshatra Ozone is being developed on a total land area of 18805 Sq.ft. Nakshatra Ozone has 2 Wings / Towers 12A,12B

ProjectDeveloperLocationPossession
Redevelopment Of Ganpati Niwas ChslBharat Realty Venture Private LimitedCts No 99931-07-2025 00:00:00
Kalpataru Radiance DKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Kalpataru Radiance AKeyana Estate LlpCts No.260/5A -Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Sharad Apartments Chs LtdAakar Constructions20331-12-2017 00:00:00
Constrution Of 24 Lig Ts On Cts No 356 P At Siddharth Nagar Goregaon West Mumbai 400062Mumbai Housing And Area Development BoardCts No 356 Part30-06-2019 00:00:00
Raj - BaijuRaj Arcade Pvt. Ltd.Cts 456/ Plot No 32431-12-2019 00:00:00
Kalpataru Radiance BKeyana Estate LlpCts No.260/5A Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Navkar AshrayNavkar Builder &Amp; DevvelopersTilak Nagar30-04-2016 00:00:00
Anmol Fortune - IiWadhwa Realty Pvt Ltd. Cts No-58 Part 1 To 7631-12-2019 00:00:00
Plot No 88Jitesh Bhawarlal Jain716, 7161 To 1131-05-2018 00:00:00
Mayadevi/ VikuthdhamHome Today Renovation India Pvt.Ltd584, 584/1 To 831-12-2018 00:00:00
Om Shubh LabhBali Realty Llp695, 695/1 To 695/630-06-2018 00:00:00
HimbinduM/S. Sahajanand Developers292/21 To 30, 292 Pt31-12-2018 00:00:00
Raj PantheonRajesh Surti40010403-07-2015 00:00:00
Vaibhav Chs LtdSwastik Realty Pvt Ltd22030-06-2018 00:00:00
Aum HeightsAbhismit EnterprisesPlot No 30 Cts No 221 Pt31-12-2018 00:00:00
Goregaon Makarand Chs, ParagGolden Land16731-05-2019 00:00:00
Siddharth Nagar Sukhvilla Chs LtdDilip Hiralal DoshiPlot No 6 - Cts No 350 Part 350/ 13 To 1630-06-2018 00:00:00
Diwaprabhu ResidencyDiwaprabhu HomesCts No. 521.521/1 To 416-07-2018 00:00:00
Dineshkunj Chs LtdSwastik Realty Pvt Ltd188 Cts No.60730-06-2018 00:00:00
Shri Ganesh ApartmentsMatushree Real Estate Developers Private LimitedCity Survey Number 22231-12-2017 00:00:00
Kalpataru Radiance EKeyana Estate LlpCts No.260/5A Part Of Village Pahadi Goregaon West30-06-2022 00:00:00
Samarth ResidencyAjay Sitaram Surve560, 1 To 630-12-2022 00:00:00
Jairajratna Chs LtdMumbai Shelter Project Jairajratan LlpMumbai Suburban30-06-2019 00:00:00
Anmol Fortune - IiiWadhwa Realty Pvt Ltd. Cts No 58 Part 1 To 7630-12-2022 00:00:00
Sethia Sea View C And D WingPrathamesh Land DevelopersCts 2231-03-2019 00:00:00
AsmiSia Developers Llp1046821 To 531-12-2019 00:00:00
Azad Laxmi Nagar Sra ChsGoodbuild (India) Private LimitedCts No 1A/178/2 Survey No 16130-12-2023 00:00:00
Shivoham HeightsRajputana Heights6851 To 8, 685, 68431-12-2017 00:00:00
Pampa Co-Operative Housing SocietyArham Realtors Llp3531-03-2018 00:00:00
Siddharth Nagar SatyadeepSai Developers400104, Mumbai Suburban31-12-2019 00:00:00
Ariisto Sommet-ResidentialAshvi Developers Private LimitedNotionally Divided Part Of Cts No 236/A/1, 236/A/5 Of Village Pahadi Goregaon Tal. Borivali Msd30-12-2023 00:00:00
Redevlopment Of Sundresh Chs LtdRaj Corporation27431-12-2017 00:00:00
Meeras Empire And Meeras CrownRushabh Real Estate Developers Private Limited50Pt28-11-2023 00:00:00
Pahhal AvenueUmmang Realtors Llp799/1 To 8, 79931-12-2019 00:00:00
Redevelopment Of Navchandrakunj ChslPranav Constructions LimitedPlot No.42, Cts No.734/A, 734/1 To 630-03-2022 00:00:00
34 Park EstateM/S Reddy Builders & Developers50 A Part, 55 Part, 49 Part31-07-2028 00:00:00
Laxmi HeightsLaxmidevi DevelopersPlot No 30731-12-2018 00:00:00
Swati C.H.S. LtdDilip Hiralal DoshiCts No 348 P 348 70 To 7230-06-2018 00:00:00
Redevelopment Of Mettivilla ChslPranav Constructions LimitedCts No 659 659/1 To 659/530-12-2028 00:00:00
Golden Star Residency Building No 2Arundhati Ajay Kadam1227/7, 1227/630-09-2018 00:00:00
DeshabhimaniSiroyafm Constructions Pvt LtdMumbai Suburban, 40006206-07-2010 00:00:00
Siddharth Nagar Abhiman Chs Ltd Building No-25Mumbai Shelter Housing Development Pvt Ltd347 Part31-12-2019 00:00:00
Palai TowersN D Developers90230-06-2021 00:00:00
Laxmi NagarReliable ConstructionsPlot No B-1 Cts 1A170-B Pahadi Goregaon W Tal Borivali Dist Mumbai 40009030-12-2023 00:00:00
Siddarth Nagar Arunodaya Chs LtdChiraginfraprojectspvt LtdMumbai Suburban, 40006231-03-2018 00:00:00
Ariisto Sommet-RetailAtithi Builders And Constructors Private Limited236/A/5 Of Village Pahadi Goregaon Tal. Borivali Msd, Notionally Divided Part Of Cts No 236/A/130-12-2023 00:00:00
Goregaon Rasik Co Op Hsg Society LtdAakar Real Estate DevelopersCts No. 208 Plot No 11431-03-2019 00:00:00
Kabra Aurum Wing A B C And D Redevelopment Of Goregaon Unnat Nagar Ii Plot No 51 To 55 ChslKabra And AssociatesPlot No 51 To 55 Cts 307 Part31-12-2019 00:00:00
Poonam HeightsShah & Mehta AssociatesCts No 916 And 139331-12-2018 00:00:00
Vasundhara Chs Ltd - Phase Ii - A And B WingReliable ConstructionsPlot No 6 Cts 219Pt Divn Konkan Village Pahadi Goregaon Tal Borivali Dist Mumbai 40010431-12-2019 00:00:00
Dridhena Developers And RealtorsDridhena Developers And Realtors662, 662/1 To 528-02-2019 00:00:00
Dharmanath KrupaBali Landmarks Llp679/1 To 679/7, 67931-12-2018 00:00:00
Building On Sub Plot - D, Cts No 101/B Of Village GoregaonSkyline Construction Co.Part Of Sub Plot D Cts No 101 B Of Village Goregaon At Oshiwara District Centre Goregaon W Mumbai31-10-2019 00:00:00
Laxmi CallistaLaxmidevi Developers283A01-09-2019 00:00:00
Siddharth Nagar Paschim Jagruti Chs LtdShivam Parivar Developers Pvt LtdCts 365 Part30-12-2026 00:00:00
The MeadowsGuruashish Construction Private LimitedPlot No.R-10, Cts No-260/9A19-11-2019 00:00:00
Ashish Building Of Emticibom Employees Chs LtdKarwa And Kewal Kiran Realtors8362, 8363, 836430-09-2024 00:00:00
Shastri Nagar Prerna C.H.S.Ltd.Confiable ConstructionsCts No. 219 Pt30-06-2025 00:00:00
Siddharth Nagar SamataWhite Water Developers35330-04-2023 00:00:00
Regent PalaceSadhna InfrastructuresCts 649, 649/1 To 431-03-2018 00:00:00
Rajendra Jhaveri ResidenceUsha Developers629 1 To 1131-12-2018 00:00:00
Goregaon Pearl Chs Ltd - Wing BSsd Escatics Pvt. Ltd.Goregaon West30-06-2017 00:00:00
Redevelopment Of Goregaon Prakash C.H.S.Ltd.M/S. Madhav Enterprises194/1 And 231-12-2018 00:00:00
Goregaon Janseva Chs Ltd Wing A And BKarwa And Kewal Kiran RealtorsCs No. 267 Part30-12-2021 00:00:00
Asmi DreamzAjay Malshi Dedhia340 Pt, 33931-03-2018 00:00:00
Prithvi ApartmentHitendra Nimbalkar113, 1 To 325-12-2020 00:00:00
Shiv GangaAnjani Kumar Co Pvt Ltd696, 696/130-06-2023 00:00:00
Siddharth Nagar Sukhvilla Chs Ltd Phase- 2Dilip Hiralal DoshiPlot No 6 Cts No 350 Part 350/13 To 1630-03-2022 00:00:00
S. N. Saket Co-Op Housing Society LimitedMan Viraj Construction347 - B31-12-2018 00:00:00
Siddharth Nagar ParijatWhite Water DevelopersMumbai Suburban, 40010430-06-2021 00:00:00
Shreedham ClassicShreedham Construction Private Limited365/33 To 50 And 52 Non Slum Plot Bearing Cst No 370, 365 Pt, 356 Pt31-12-2018 00:00:00
C Link Chandrama Co-Op. Housing Society LimitedConcrete Lifestyles &Amp; Infrastructure Private LimitedMumbai Suburban, 40010415-06-2018 00:00:00
Siddharth Nagar Gulmohar Chs LtdShivam Parivar Developers Pvt Ltd2630-12-2024 00:00:00
Viniyog Chs Ltd.Vinayak Developers190, 190/1 To 430-07-2020 00:00:00
Siddharth Nagar Siddhivinayak Chs LtdInfinity ConstructionsCts 348/62 To 6531-12-2027 00:00:00
Luxury Chsl LtdLaxmidevi DevelopersBehind Filmistan30-06-2025 00:00:00
Siddharth Nagar Shivam Chs LtdVirendra Hiralal DoshiCts No 348 Part31-03-2025 00:00:00
Vijayi JwalaChirag Infraprojects Private Limited217(Pt)31-03-2027 00:00:00
Shree Hari EnclaveParesh PatelGoregaon West, Mumbai Suburban31-12-2025 00:00:00
AnandiSadhna Global Construction400062, Mumbai Suburban31-12-2017 00:00:00
Raj SpacesRajesh SurtiMumbai Suburban, 40006203-03-2010 00:00:00
S N Sahayog ChslUmang Construction CoBorivali, 400104, Mumbai Suburban31-03-2018 00:00:00
Vallabh Krupa ChslGun Rajan Constructions644/A/131-10-2026 00:00:00
MatrusmrutiGio Properties41702-10-2025 00:00:00
Goregaon Matrusmruti ChslMadhu Associates171, 171/1 To 1031-12-2025 00:00:00
Sumit Samarth ArcadeSumit Woods Pvt Ltd862/1 To 28, 862, 1/1 To 130 Of Village Pahadi31-12-2017 00:00:00
Pai NiwasAakar Constructions204 204/1 To 231-12-2017 00:00:00
AmanPatel DevelopersMumbai Suburban, 40006201-05-2017 00:00:00
Paras ResidencyAureum Spaces Llp141/A30-09-2025 00:00:00
Sushanku Avenue 36Sushanku Realty Private Limited268A/131-12-2025 00:00:00
Kenorita Jewels Phase IiK R Shoppers Private Limited796, 793 /1 To 11, 796/ 1 To 25 & 819, 79431-12-2025 00:00:00
Project Details
  • Project:
    Nakshatra Ozone
  • Location:
  • S.No. 50, Hissa No.7/8,
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Jsb Homes Llp
  • Phone:
  • Address:
  • Pratiek Plaza Opp To Patel Petrol Pump
Project RERA Details
MAHA REARA No: P99000009297
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ajay Wade & Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Nakshatra Ozone QR Code
Nakshatra Ozone
MahaRERA - P99000009297
Apartment Details & Configuration
TypeArea
Residential23.41 Sq.mts. ( 252 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Nakshatra Ozonelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
0
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
0
Landscaping & Tree Planting100% completed
95% Complete
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
0
Solid Waste Management And Disposal100% completed
95% Complete
0
Storm Water Drains100% completed
95% Complete
0
Street Lighting100% completed
95% Complete
0
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
0
Water Conservation, Rain water Harvesting100% completed
95% Complete
0
Water Supply100% completed
95% Complete
0
Buildings / Wings in Nakshatra Ozone
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nakshatra Ozone by Jsb Homes Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

18805 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

224 apartments in total
Total
224
Booked
123
Available
101

Saleable Area Statistics (Sq. ft.)

56445 Total
Total
56445
Booked
30994
Available
25451
Total 224 apartments in project. 123 apartments booked. 54% apartments booked.
Total 56445 Sq.ft. saleable area. 30994 saleable area booked.
55% area booked.

12A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
12ADec 201915101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential23.41 Sq.mts. ( 252 Sq.ft. )112
61 Booked54% Booked
54% Booked
112 total apartments / 61 apartments booked. 54% apartments booked.
Work Description in Building 12ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

12B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
12BDec 201915101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential23.41 Sq.mts. ( 252 Sq.ft. )112
62 Booked55% Booked
55% Booked
112 total apartments / 62 apartments booked. 55% apartments booked.
Work Description in Building 12BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Jsb Homes Llp
for Project
Nakshatra Ozone
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation