Project overview

Mukundan Astria is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000050138. Mukundan Astria is located at 132(A). This is a New being developed by Mukundan Infra.

Mukundan Astria has 1 BHK & 2 BHK Apartments with carpet areas ranging from 407 to 602 Sq.ft. Carpet. The Project has total 280 of which 104 are currently available for sale.

Mukundan Astria is being developed on a total land area of 42948 Sq.ft. Mukundan Astria has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Mukundan Astria
  • Location:
  • 132(A)
  • Const. Stage:
    New
  • Possession:
    31 Mar 2028
Developer Details

  • Developer:
    Mukundan Infra
  • Phone:
  • Address:
  • Sonal Arcade
Project RERA Details
MAHA REARA No: P99000050138
Project Type Residential / Group Housing
RERA Project Status New
Architect Megha Urbanscapes
Funding Bank IDBI BANK
Proposed Possession 31 Mar 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Jun 2025
Last Retrived 28 Jul 2025
Mukundan Astria QR Code
Mukundan Astria
MahaRERA - P99000050138
Apartment Details & Configuration
TypeArea
1 BHK31.63 Sq.mts. ( 340 Sq.ft. )
1 BHK33.57 Sq.mts. ( 361 Sq.ft. )
1 BHK34.27 Sq.mts. ( 369 Sq.ft. )
1 BHK36.84 Sq.mts. ( 397 Sq.ft. )
1 BHK39.47 Sq.mts. ( 425 Sq.ft. )
1 BHK39.55 Sq.mts. ( 426 Sq.ft. )
1 BHK39.57 Sq.mts. ( 426 Sq.ft. )
2 BHK41.41 Sq.mts. ( 446 Sq.ft. )
2 BHK42.72 Sq.mts. ( 460 Sq.ft. )
2 BHK47.4 Sq.mts. ( 510 Sq.ft. )
2 BHK50.42 Sq.mts. ( 543 Sq.ft. )
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )
2 BHK54.58 Sq.mts. ( 587 Sq.ft. )
2 BHK55.05 Sq.mts. ( 593 Sq.ft. )
3 BHK69.65 Sq.mts. ( 750 Sq.ft. )
1 BHK37.83 Sq.mts. ( 407 Sq.ft. )
1 BHK39.51 Sq.mts. ( 425 Sq.ft. )
2 BHK41.29 Sq.mts. ( 444 Sq.ft. )
2 BHK41.35 Sq.mts. ( 445 Sq.ft. )
2 BHK42.46 Sq.mts. ( 457 Sq.ft. )
2 BHK54.52 Sq.mts. ( 587 Sq.ft. )
2 BHK54.65 Sq.mts. ( 588 Sq.ft. )
2 BHK55.9 Sq.mts. ( 602 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mukundan Astrialast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
0
Water Conservation, Rain water Harvesting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
0
Storm Water Drains
0
Solid Waste Management And Disposal
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Open Parking
Na
Landscaping & Tree Planting
0
Fire Protection And Fire Safety Requirements
0
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Mukundan Astria
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mukundan Astria by Mukundan Infralast updated on 28 Jul 2025 as per information obtained from MARA RERA.

42948 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

280 apartments in total
Total
280
Booked
176
Available
104

Saleable Area Statistics (Sq. ft.)

134537 Total
Total
134537
Booked
83429
Available
51107
Total 280 apartments in project. 176 apartments booked. 62% apartments booked.
Total 134537 Sq.ft. saleable area. 83429 saleable area booked.
62% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMar 202812101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.63 Sq.mts. ( 340 Sq.ft. )12
10 Booked83% Booked
83% Booked
1 BHK33.57 Sq.mts. ( 361 Sq.ft. )12
7 Booked58% Booked
58% Booked
1 BHK34.27 Sq.mts. ( 369 Sq.ft. )12
11 Booked91% Booked
91% Booked
1 BHK36.84 Sq.mts. ( 397 Sq.ft. )24
12 Booked50% Booked
50% Booked
1 BHK39.47 Sq.mts. ( 425 Sq.ft. )11
4 Booked36% Booked
36% Booked
1 BHK39.55 Sq.mts. ( 426 Sq.ft. )12
1 BHK39.57 Sq.mts. ( 426 Sq.ft. )12
8 Booked66% Booked
66% Booked
2 BHK41.41 Sq.mts. ( 446 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK42.72 Sq.mts. ( 460 Sq.ft. )12
11 Booked91% Booked
91% Booked
2 BHK47.4 Sq.mts. ( 510 Sq.ft. )12
7 Booked58% Booked
58% Booked
2 BHK50.42 Sq.mts. ( 543 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK50.49 Sq.mts. ( 543 Sq.ft. )12
11 Booked91% Booked
91% Booked
2 BHK54.58 Sq.mts. ( 587 Sq.ft. )12
6 Booked50% Booked
50% Booked
2 BHK55.05 Sq.mts. ( 593 Sq.ft. )12
12 Booked100% Booked
100% Booked
3 BHK69.65 Sq.mts. ( 750 Sq.ft. )12
191 total apartments / 127 apartments booked. 66% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress77% done
77% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMar 202812101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.83 Sq.mts. ( 407 Sq.ft. )11
3 Booked27% Booked
27% Booked
1 BHK39.51 Sq.mts. ( 425 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK41.29 Sq.mts. ( 444 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHK41.35 Sq.mts. ( 445 Sq.ft. )11
10 Booked90% Booked
90% Booked
2 BHK42.46 Sq.mts. ( 457 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK54.52 Sq.mts. ( 587 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK54.65 Sq.mts. ( 588 Sq.ft. )11
4 Booked36% Booked
36% Booked
2 BHK55.9 Sq.mts. ( 602 Sq.ft. )12
11 Booked91% Booked
91% Booked
89 total apartments / 49 apartments booked. 55% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress85% done
85% Booked
Channel Partners
Channel Partners Registered by Developer
Mukundan Infra
for Project
Mukundan Astria
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation