Project overview

Motiram Puram is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700001387. Motiram Puram is located at Survey No 183 H.No 9 Survey No 184 Hissa No 2A. This is a Ongoing being developed by Nayan Dilip Dalal.

Motiram Puram has 1 BHK, 1 RK & 2 BHK Apartments with carpet areas ranging from 213 to 453 Sq.ft. Carpet. The Project has total 118 of which 37 are currently available for sale.

Motiram Puram is being developed on a total land area of 25295 Sq.ft. out of which 2530 Sq.ft. i.e 10% is reserved for recreational purposes. Motiram Puram has 2 Wings / Towers Gold Finch And Flamingo,Woodpecker

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Project Details
  • Project:
    Motiram Puram
  • Location:
  • Survey No 183 H.No 9 Survey No 184 Hissa No 2A
  • Const. Stage:
    Ongoing
  • Possession:
    30 May 2022
Developer Details

  • Developer:
    Nayan Dilip Dalal
  • Phone:
  • Address:
  • Janki Darshan
Project RERA Details
MAHA REARA No: P51700001387
Project Type Others
RERA Project Status Ongoing
Architect Ms M Square
Funding Bank BANK OF INDIA
Proposed Possession 30 May 2022
Revised Possession 30 May 2022
Extended Possession
Litigations No Litigations
Last Modified 27 Jul 2017
Last Retrived 26 Jul 2025
Motiram Puram QR Code
Motiram Puram
MahaRERA - P51700001387
Apartment Details & Configuration
TypeArea
1 BHK28.13 Sq.mts. ( 303 Sq.ft. )
1 BHK29.19 Sq.mts. ( 314 Sq.ft. )
1 BHK29.78 Sq.mts. ( 321 Sq.ft. )
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )
1 BHK30.58 Sq.mts. ( 329 Sq.ft. )
1 BHK33.72 Sq.mts. ( 363 Sq.ft. )
1 BHK33.73 Sq.mts. ( 363 Sq.ft. )
2 BHK35.22 Sq.mts. ( 379 Sq.ft. )
2 BHK40.92 Sq.mts. ( 440 Sq.ft. )
2 BHK46.47 Sq.mts. ( 500 Sq.ft. )
SHOP10.53 Sq.mts. ( 113 Sq.ft. )
SHOP11.14 Sq.mts. ( 120 Sq.ft. )
SHOP11.58 Sq.mts. ( 125 Sq.ft. )
SHOP12.1 Sq.mts. ( 130 Sq.ft. )
SHOP13.52 Sq.mts. ( 146 Sq.ft. )
SHOP18.28 Sq.mts. ( 197 Sq.ft. )
1 BHK31 Sq.mts. ( 334 Sq.ft. )
1 BHK31.01 Sq.mts. ( 334 Sq.ft. )
1 BHK31.26 Sq.mts. ( 336 Sq.ft. )
1 BHK31.27 Sq.mts. ( 337 Sq.ft. )
1 BHK32.63 Sq.mts. ( 351 Sq.ft. )
1 BHK32.89 Sq.mts. ( 354 Sq.ft. )
1 RK19.79 Sq.mts. ( 213 Sq.ft. )
1 RK19.89 Sq.mts. ( 214 Sq.ft. )
2 BHK42.13 Sq.mts. ( 453 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Motiram Puramlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Electric Meter Room
Energy management
Na
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
Na
Storm Water Drains
-
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting
Water Supply
-
Buildings / Wings in Motiram Puram
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Motiram Puram by Nayan Dilip Dalallast updated on 26 Jul 2025 as per information obtained from MARA RERA.

25295 Sq. ft.

Project Area

2530 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

118 apartments in total
Total
118
Booked
81
Available
37

Saleable Area Statistics (Sq. ft.)

38497 Total
Total
38497
Booked
26090
Available
12406
Total 118 apartments in project. 81 apartments booked. 68% apartments booked.
Total 38497 Sq.ft. saleable area. 26090 saleable area booked.
68% area booked.

Gold Finch And Flamingo

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gold Finch And FlamingoMay 20218101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.13 Sq.mts. ( 303 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK29.19 Sq.mts. ( 314 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK29.78 Sq.mts. ( 321 Sq.ft. )21
14 Booked66% Booked
66% Booked
1 BHK30.52 Sq.mts. ( 329 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK30.58 Sq.mts. ( 329 Sq.ft. )7
3 Booked42% Booked
42% Booked
1 BHK33.72 Sq.mts. ( 363 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.73 Sq.mts. ( 363 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK35.22 Sq.mts. ( 379 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK40.92 Sq.mts. ( 440 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK46.47 Sq.mts. ( 500 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10.53 Sq.mts. ( 113 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP11.14 Sq.mts. ( 120 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.58 Sq.mts. ( 125 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP12.1 Sq.mts. ( 130 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.52 Sq.mts. ( 146 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.28 Sq.mts. ( 197 Sq.ft. )1
None Booked0% Booked
0% Booked
65 total apartments / 45 apartments booked. 69% apartments booked.
Work Description in Building Gold Finch And FlamingoCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Woodpecker

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
WoodpeckerMay 20218101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31 Sq.mts. ( 334 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK31.01 Sq.mts. ( 334 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK31.26 Sq.mts. ( 336 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.27 Sq.mts. ( 337 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK32.63 Sq.mts. ( 351 Sq.ft. )7
3 Booked42% Booked
42% Booked
1 BHK32.89 Sq.mts. ( 354 Sq.ft. )8
1 RK19.79 Sq.mts. ( 213 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 RK19.89 Sq.mts. ( 214 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK42.13 Sq.mts. ( 453 Sq.ft. )8
6 Booked75% Booked
75% Booked
53 total apartments / 36 apartments booked. 67% apartments booked.
Work Description in Building WoodpeckerCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Nayan Dilip Dalal
for Project
Motiram Puram
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation