Project overview

Montag Greens is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000011050. Montag Greens is located at Survey No.19 Hissa No.8. This is a Ongoing being developed by Montag Infrastructure Private Limited.

Montag Greens has RESIDENTIAL Apartments with carpet areas ranging from 685 to 685 Sq.ft. Carpet. The Project has total 153 of which 100 are currently available for sale.

Montag Greens is being developed on a total land area of 235732 Sq.ft. out of which 20290 Sq.ft. i.e 9% is reserved for recreational purposes. Montag Greens has 8 Wings / Towers British And Spanish Row Houses Type H,British/Spanish Villa Type D,Hill Views Type F,Italian Villa Type A,Italian Villa Type B,Spanish Villa Type C,Studio Appt Type G,Type E

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Montag Greens
  • Location:
  • Survey No.19 Hissa No.8
  • Const. Stage:
    Ongoing
  • Possession:
    01 Dec 2018
Developer Details

  • Developer:
    Montag Infrastructure Private Limited
  • Phone:
  • Address:
  • The Crescent Business Park
Project RERA Details
MAHA REARA No: P52000011050
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Design And Dimentions
Funding Bank HDFC BANK
Proposed Possession 01 Dec 2018
Revised Possession 01 Dec 2018
Extended Possession 30 Jun 2026
Litigations No Litigations
Last Modified 29 Jul 2024
Last Retrived 28 Jul 2025
Montag Greens QR Code
Montag Greens
MahaRERA - P52000011050
Apartment Details & Configuration
TypeArea
RESIDENTIAL75.5 Sq.mts. ( 813 Sq.ft. )
RESIDENTIAL115.93 Sq.mts. ( 1248 Sq.ft. )
RESIDENTIAL43.2 Sq.mts. ( 465 Sq.ft. )
RESIDENTIAL104.5 Sq.mts. ( 1125 Sq.ft. )
RESIDENTIAL133.1 Sq.mts. ( 1433 Sq.ft. )
3 BHK133 Sq.mts. ( 1432 Sq.ft. )
RESIDENTIAL28.3 Sq.mts. ( 305 Sq.ft. )
RESIDENTIAL63.6 Sq.mts. ( 685 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Montag Greenslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply100% completed
95% Complete
0
Water Conservation, Rain water Harvesting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting100% completed
95% Complete
0
Storm Water Drains
Na
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
00
Open Parking100% completed
95% Complete
00
Landscaping & Tree Planting100% completed
95% Complete
0
Fire Protection And Fire Safety Requirements
Na
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
0
Community Buildings100% completed
95% Complete
00
Aggregate area of recreational Open Space100% completed
95% Complete
0
Buildings / Wings in Montag Greens
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Montag Greens by Montag Infrastructure Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

235732 Sq. ft.

Project Area

20290 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

153 apartments in total
Total
153
Booked
53
Available
100

Saleable Area Statistics (Sq. ft.)

96422 Total
Total
96422
Booked
40391
Available
56031
Total 153 apartments in project. 53 apartments booked. 34% apartments booked.
Total 96422 Sq.ft. saleable area. 40391 saleable area booked.
42% area booked.

British And Spanish Row Houses Type H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
British And Spanish Row Houses Type HJun 202342000160
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL75.5 Sq.mts. ( 813 Sq.ft. )14
14 total apartments / 1 apartments booked. 7% apartments booked.
Work Description in Building British And Spanish Row Houses Type HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

British/Spanish Villa Type D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
British/Spanish Villa Type DJun 20236201040
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL115.93 Sq.mts. ( 1248 Sq.ft. )4
1 Booked25% Booked
25% Booked
4 total apartments / 1 apartments booked. 25% apartments booked.
Work Description in Building British/Spanish Villa Type DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Hill Views Type F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Hill Views Type FJun 202351010040
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL43.2 Sq.mts. ( 465 Sq.ft. )68
17 Booked25% Booked
25% Booked
68 total apartments / 17 apartments booked. 25% apartments booked.
Work Description in Building Hill Views Type FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Italian Villa Type A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Italian Villa Type AJun 202312401080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL104.5 Sq.mts. ( 1125 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 total apartments / 2 apartments booked. 100% apartments booked.
Work Description in Building Italian Villa Type ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Italian Villa Type B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Italian Villa Type BJun 2023155000100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL133.1 Sq.mts. ( 1433 Sq.ft. )16
15 Booked93% Booked
93% Booked
16 total apartments / 15 apartments booked. 93% apartments booked.
Work Description in Building Italian Villa Type BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Spanish Villa Type C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Spanish Villa Type CJun 20236201040
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK133 Sq.mts. ( 1432 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 total apartments / 1 apartments booked. 50% apartments booked.
Work Description in Building Spanish Villa Type CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Studio Appt Type G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Studio Appt Type GJun 20235101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL28.3 Sq.mts. ( 305 Sq.ft. )31
15 Booked48% Booked
48% Booked
31 total apartments / 15 apartments booked. 48% apartments booked.
Work Description in Building Studio Appt Type GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Type E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type EJun 20235101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL63.6 Sq.mts. ( 685 Sq.ft. )16
16 total apartments / 1 apartments booked. 6% apartments booked.
Work Description in Building Type ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Montag Infrastructure Private Limited
for Project
Montag Greens
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation