Project overview

Mohini Tower is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800006731. Mohini Tower is located at 761F 1528. This is a Ongoing being developed by Mohini Sheltors Private Limited.

Mohini Tower has 1 BHK, 1 RM, 2 BHK, 3 BHK, COMM 1, COMM 2 & COMM 3 Apartments with carpet areas ranging from 143 to 802 Sq.ft. Carpet. The Project has total 35 of which 2 are currently available for sale.

Mohini Tower is being developed on a total land area of 9000 Sq.ft. Mohini Tower has 1 Wings / Towers Mohini Tower

ProjectDeveloperLocationPossession
Florence A P PropertiesE 195 A30-09-2018 00:00:00
Disha Co-Op Housing Society LtdPritesh SanghviPlot No 586 F.P. No 153831-12-2018 00:00:00
SpentaSvk Projects LlpCts No E 85531-12-2017 00:00:00
Pllatinum AuraG.S. DevelopersE/82531-03-2018 00:00:00
White HouseOmega Enterprises40005010-04-2019 00:00:00
Dlh OrnateDev Land & Housing Pvt Ltd598, 599 Village Khar West At Junction Of Rd 9 And 11, Cts No E 59731-12-2018 00:00:00
Unicore AuraUnicore RealtyMumbai Suburban, 40005230-12-2023 00:00:00
RamkrishnaShreeji Lifespace400052, Mumbai Suburban31-07-2020 00:00:00
Bandra North Gulmohar AvenueShivalik Ventures Private Limited30/547-551, 30/531, 30/581-789, 30/334-335, 30/529, Cts No 30/326-32827-08-2023 00:00:00
AaryaRaja BuildersE/67930-12-2021 00:00:00
Jaswant HeightsL Nagpal DevelopersF/16731-12-2018 00:00:00
Mohini TowerMohini Sheltors Private Limited761F 152831-12-2019 00:00:00
Corner ViewEkta Supreme CorporationCts No F -488, Plot No 378 -37930-09-2019 00:00:00
VirajblissVijay Raj EstatesE/86/1831-12-2018 00:00:00
Shapoorji Pallonji The DesignateBehold Space Developers Private LimitedH/463, Mumbai, St Francis Rd30-06-2021 00:00:00
K Mordani CelynK Mordani Constructions LlpF/9130-04-2021 00:00:00
Khar Yamuna Bhuvan Co.Op.Hsg. Soc. Ltd.Aum AssociatesC.T.S. No. E/21030-03-2019 00:00:00
AdicioShree Ahuja Project Private LimitedMumbai Suburban, 40005231-03-2018 00:00:00
Bandra Boon Chs LtdMass Jaks Associate VenturesF22 F.P. No 35031-12-2024 00:00:00
Sheel Apartments By MayfairMayfair Housing Private LimitedFinal Plot Nos 598 And 599 Of Tps Iii 1St Variation Final Bearing Cts No F40 And F41 Of Village Bandra31-12-2024 00:00:00
Kanakia ParisKanakia Spaces Realty Private Limited629/1284/B30-09-2019 00:00:00
The Address By Gs Bandra Tower CTen X Realty Limited31-01-2030 00:00:00
The Address By Gs Bandra Tower BTen X Realty Limited31-01-2030 00:00:00
Darvesh GrandShyam Sunder Estates Private Limited837 And 838, E/835, 83631-03-2018 00:00:00
Gyan GharPankaj ChawlaMumbai Suburban, 40007131-03-2017 00:00:00
Hicons Corporate LoungeTejal Minerals And Grinders Pvt LtdMumbai Suburban, 40005230-12-2020 00:00:00
Khar Hira Premises Co Op Society LtdL Nagpal DevelopersE/25029-02-2024 00:00:00
Pushp-VatikaAnish Shah & Manish ShahCts No E/550 Of Village Bandra - E31-12-2024 00:00:00
52 Park AvenueDan Kutir ChslE/495 Of Village Bandra E31-08-2024 00:00:00
PlatinaG F Reality Private LimitedE/79831-12-2019 00:00:00
Narayan DhanRaaju AmarnaaniKhar Gymkhana30-12-2022 00:00:00
IzarraOrno Infraprojects Pvt LtdPlot 43530-12-2022 00:00:00
Ekta ErosEkta Shelters Private LimitedE/4931-12-2019 00:00:00
Ventura At One4Sun Star Spaces Pvt. Ltd.35031-03-2018 00:00:00
Prabhat DarshanShivalik Ventures Private Limited257 1 To 7, 255, 256 1 To 2430-06-2023 00:00:00
La MaisonParamvir Real Estates Llp619, 62030-12-2023 00:00:00
NavratnamalaElegant Constructions694627-02-2020 00:00:00
Mohini CastleMohini Sheltors Private Limited582/F1530, F1531/Tpsiii, 58130-06-2021 00:00:00
Redevelopment Of Loita Kunj Chs LtdOrra Realtors Private LimitedE 18430-12-2024 00:00:00
Naik Kakad NiwasNiraj Kakad Constructions Private LimitedCts No F/814 Final Plot No 14031-01-2020 00:00:00
TribecaNestor Builders & Developers Private LimitedF/69231-12-2018 00:00:00
11.11 Business ParkRockwell Developers Llp23031-12-2025 00:00:00
Bandra Siddharth Co Op Hsg Soc LtdL Nagpal Builders Llp41431-05-2025 00:00:00
Queen Of SpacesSpace India Builders And Developers LlpC.T.S. No-F/350, F.P. No-51331-01-2026 00:00:00
The Address By Gs Bandra Tower ATen X Realty Limited31-01-2030 00:00:00
La52Galani Ajwani Developers Llp80530-06-2027 00:00:00
259 Park CrestShree Krishna Homes Pvt Ltd48831-12-2026 00:00:00
N SquareParthesh Developers Private LimitedF/11831-12-2019 00:00:00
Om PalaceUmiya BuildersMumbai Suburban, 40005415-07-2020 00:00:00
Kakad HeightsNiraj Kakad ConstructionsJunction Of 25Th And 29Th Road15-04-2019 00:00:00
Maple ShadesShandor Homes LlpCts No F/437 And F/438 Fp No 422 And 42314-05-2025 00:00:00
LalanibusinessparkLalani Constructions Private LimitedCts No F 73A31-03-2024 00:00:00
N N TowerL Nagpal Builders LlpF/16631-10-2023 00:00:00
HighstreetParamvir Developers LlpE37630-12-2022 00:00:00
Kakad ClassicNiraj Kakad Developers LlpFinal Plot No. 595-A, Cts No. F/3430-07-2019 00:00:00
16Th AvenueMnk Builders LlpE17030-06-2018 00:00:00
Apollo HeightsJasani Realty Pvt.LtdE323 Part E32531-07-2022 00:00:00
WestendParamvir Builders LlpG61030-06-2019 00:00:00
Velkar ResidencyK L Housing LlpE 44631-03-2018 00:00:00
Asavari Co Op Hsg Soc LtdTrimity ConstructionsSurvye No 1631-12-2024 00:00:00
Crest LinkCrest Ventures Limited265, 266, 26728-02-2026 00:00:00
Notan CasaLifespace Homes Realtors LlpF/469, F/467, F/46830-06-2025 00:00:00
Ganga Jamna SangamParthesh DevelopersCts No F 111 F11531-07-2019 00:00:00
AnandSunnyside DevelopersC 911 C 912 C 91331-03-2018 00:00:00
K L RegaliaK L Housing LlpE 447A31-03-2018 00:00:00
NivanM/S. Paradigm Real Estates LlpE/75131-10-2018 00:00:00
Violette ValleyAqua Marine EnterprisesF 38331-12-2017 00:00:00
Pali PalmsSsd Holdings LlpMumbai Suburban31-12-2018 00:00:00
Benchmark PlazaBenchmark Projects Pvt LtdCts No F160 Fp No 55531-12-2019 00:00:00
Shankesh CrownH. Mehta Realtors Llp36/631-12-2026 00:00:00
Gurukrupa NirmalamGurukrupa Realcon Infrastructure LlpCts No 604 Pt Village Bandra East31-12-2026 00:00:00
DattaJoin Trak Infra Private Limited195B ,195C31-12-2028 00:00:00
BrightlandSambhavparshva Developers Private Limited19531-12-2026 00:00:00
Hill ViewL Nagpal Builders Llp39431-12-2026 00:00:00
Aos GenesisAos Developments LlpE/746 To 74831-12-2027 00:00:00
Project Details
  • Project:
    Mohini Tower
  • Location:
  • 761F 1528
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Mohini Sheltors Private Limited
  • Phone:
  • Address:
  • Kumar Harshavardhan Chs Ltd
Project RERA Details
MAHA REARA No: P51800006731
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Uday D Tambe
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 16 Aug 2017
Last Retrived 26 Jul 2025
Mohini Tower QR Code
Mohini Tower
MahaRERA - P51800006731
Apartment Details & Configuration
TypeArea
1 BHK48.17 Sq.mts. ( 519 Sq.ft. )
1 BHK33.3 Sq.mts. ( 358 Sq.ft. )
1 BHK34.38 Sq.mts. ( 370 Sq.ft. )
1 BHK36.27 Sq.mts. ( 390 Sq.ft. )
1 BHK38.68 Sq.mts. ( 416 Sq.ft. )
1 BHK39.32 Sq.mts. ( 423 Sq.ft. )
1 BHK42.21 Sq.mts. ( 454 Sq.ft. )
1 BHK47.07 Sq.mts. ( 507 Sq.ft. )
1 BHK47.11 Sq.mts. ( 507 Sq.ft. )
1 RM18.75 Sq.mts. ( 202 Sq.ft. )
1 RM19.31 Sq.mts. ( 208 Sq.ft. )
1 RM27.66 Sq.mts. ( 298 Sq.ft. )
2 BHK47.66 Sq.mts. ( 513 Sq.ft. )
2 BHK50.95 Sq.mts. ( 548 Sq.ft. )
2 BHK51.15 Sq.mts. ( 551 Sq.ft. )
2 BHK51.78 Sq.mts. ( 557 Sq.ft. )
2 BHK54.33 Sq.mts. ( 585 Sq.ft. )
2 BHK54.73 Sq.mts. ( 589 Sq.ft. )
2 BHK54.77 Sq.mts. ( 590 Sq.ft. )
2 BHK54.95 Sq.mts. ( 591 Sq.ft. )
2 BHK56.34 Sq.mts. ( 606 Sq.ft. )
2 BHK56.38 Sq.mts. ( 607 Sq.ft. )
2 BHK56.97 Sq.mts. ( 613 Sq.ft. )
2 BHK57.48 Sq.mts. ( 619 Sq.ft. )
2 BHK66.9 Sq.mts. ( 720 Sq.ft. )
3 BHK70.43 Sq.mts. ( 758 Sq.ft. )
3 BHK74.54 Sq.mts. ( 802 Sq.ft. )
COMM 117.68 Sq.mts. ( 190 Sq.ft. )
COMM 213.26 Sq.mts. ( 143 Sq.ft. )
COMM 318.49 Sq.mts. ( 199 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mohini Towerlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Reliance
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Mcgm
Landscaping & Tree Planting50% completed
50% Complete
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Mcgm
Solid Waste Management And Disposal90% completed
90% Complete
Mcgm
Storm Water Drains100% completed
95% Complete
Mcgm
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Mcgm
Water Conservation, Rain water Harvesting100% completed
95% Complete
Consultant
Water Supply90% completed
90% Complete
Mcgm
Buildings / Wings in Mohini Tower
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mohini Tower by Mohini Sheltors Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

9000 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

35 apartments in total
Total
35
Booked
33
Available
2

Saleable Area Statistics (Sq. ft.)

17122 Total
Total
17122
Booked
15599
Available
1522
Total 35 apartments in project. 33 apartments booked. 94% apartments booked.
Total 17122 Sq.ft. saleable area. 15599 saleable area booked.
91% area booked.

Mohini Tower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mohini TowerJan 190015111251
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK48.17 Sq.mts. ( 519 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.3 Sq.mts. ( 358 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK34.38 Sq.mts. ( 370 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK36.27 Sq.mts. ( 390 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK38.68 Sq.mts. ( 416 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK39.32 Sq.mts. ( 423 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK42.21 Sq.mts. ( 454 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK47.07 Sq.mts. ( 507 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK47.11 Sq.mts. ( 507 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 RM18.75 Sq.mts. ( 202 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 RM19.31 Sq.mts. ( 208 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 RM27.66 Sq.mts. ( 298 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK47.66 Sq.mts. ( 513 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK50.95 Sq.mts. ( 548 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.15 Sq.mts. ( 551 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.78 Sq.mts. ( 557 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK54.33 Sq.mts. ( 585 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK54.73 Sq.mts. ( 589 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK54.77 Sq.mts. ( 590 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK54.95 Sq.mts. ( 591 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK56.34 Sq.mts. ( 606 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK56.38 Sq.mts. ( 607 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK56.97 Sq.mts. ( 613 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK57.48 Sq.mts. ( 619 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK66.9 Sq.mts. ( 720 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK70.43 Sq.mts. ( 758 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK74.54 Sq.mts. ( 802 Sq.ft. )1
None Booked0% Booked
0% Booked
COMM 117.68 Sq.mts. ( 190 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMM 213.26 Sq.mts. ( 143 Sq.ft. )1
1 Booked100% Booked
100% Booked
COMM 318.49 Sq.mts. ( 199 Sq.ft. )1
1 Booked100% Booked
100% Booked
35 total apartments / 33 apartments booked. 94% apartments booked.
Work Description in Building Mohini TowerCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mohini Sheltors Private Limited
for Project
Mohini Tower
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation