Project overview

Mohan Areca is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000829. Mohan Areca is located at Survey No 4/Hissa No 1P. This is a Ongoing being developed by MOHAN LIFESPACES LLP.

Mohan Areca has Shop Apartments with carpet areas ranging from 147 to 521 Sq.ft. Carpet. The Project has total 224 of which 0 are currently available for sale.

Mohan Areca is being developed on a total land area of 78283 Sq.ft. out of which 7828 Sq.ft. i.e 10% is reserved for recreational purposes. Mohan Areca has 4 Wings / Towers A Wing,B Wing,C Wing,D Wing

ProjectDeveloperLocationPossession
Jeevan LifestylesJEEVAN ENTERPRISESS N 148 / 13/1531-03-2019 00:00:00
M/s. Shubham Karoti Complex Phase - IM/s. Shubham Karoti Enterprises146/4 B Plot 1,231-03-2018 00:00:00
M/S. Shubham Karoti Complex Phase - IiiM/S. Shubham Karoti EnterprisesThane, 42150331-03-2020 00:00:00
SHREEJI ICONIC PHASE IRAJ LAXMI DEVELOPERS137B, 148 Hn1 And 2B, 145 Hn 130-05-2022 00:00:00
RACHANA HEIGHTSRESHMA VIKAS BAMBULKAR482109-06-2019 00:00:00
SATVIK E WINGJIGAR ENTERPRISESS No 39 H No 6 Pt Plot No 1 And 1201-12-2019 00:00:00
Khatri NxAashiyana ConstructionsGut No 111 Hissa No 3, 41, 4231-12-2019 00:00:00
PADMAPRABHA CO OP HSG SOCIETYSHREE MAHAVEER ENTERPRISESSurvey No 46 Plot No 23 24 H No 6A9 6A10 P30-04-2018 00:00:00
VED HEIGHTSOM REALITYS.No. 96, H. No. 231-12-2026 00:00:00
RAM RIVERAS No 29/A/3 Plot No 13 And 1430-09-2025 00:00:00
SAMARTH PARADISES P DEVELOPERSS No 21 H No 1331-12-2026 00:00:00
SAI VILLABUILT TECH BUILDERS & DEVELOPERS PVT. LTD.Survey No 174 Hissa No 5P30-12-2022 00:00:00
NAV SAI CHHAYA CHS LTDNIKET ENTERPRISESS No. 30 Final Plot No. H. No. 1/B1631-01-2020 00:00:00
PANVELKAR OPTIMAVARAD VINAYAK DEVELOPERSSurvey No 16 Hissa No 330-09-2020 00:00:00
SHREEJI GREENSDEEP LAXMI ASSOCIATESS No 70 H No 6A S No 70 H No 6B S No 73 H No 2 S No 73 H No 531-07-2026 00:00:00
Shiv ParadiseShiv CorporationPlot No 14 & 15 S No 45 H No 1/A/17 And 1 /A/1831-12-2025 00:00:00
FULORA CO-OP HOUSING SOCIETY LTDPINNACLE CREATORSSurvey No 13 Hissa No 6 A 1731-07-2025 00:00:00
VEDANT VASTUVEDANT VENTURESurvey No. 63, Hissa No. 4A8, Plot No. 831-12-2018 00:00:00
Mohan ArecaMOHAN LIFESPACES LLPSurvey No 4/Hissa No 1P31-12-2019 00:00:00
VISHWAJEET MANORABHIJEET REALTYGut No 574 Pt 574231-12-2019 00:00:00
Park One Phase IISHREE LAXMI ENTERPRISESSurvey No. 125, H.No. 1/A31-12-2027 00:00:00
NAV AVANI CHSMANGALYA INFRAS. No. 51, H. No. 3/A/30, Plot No. 3031-01-2025 00:00:00
Soham NeelM/s Neel Siddhi Enterprises27/1/11 , Plot No. 831-03-2027 00:00:00
SAMARTH VATIKASHREE SAMARTH ASSOCIATES122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
SAI ARCADESAI DEVELOPERSSurvey No 5 Hissa No 22 Plot No 431-12-2017 00:00:00
KOOL BREEZE PHASE IIABHISHEK SHELTERS LTDS No 127 H No 32 S No 13 H No 1231-05-2018 00:00:00
SAISHYAM ARCADESHUBH BUILDSPACESurvey No 20, Hissa No 2,431-12-2025 00:00:00
SHREEJI ICONICRAJ LAXMI DEVELOPERSSr No 137B And Sr No 9 H No 1031-12-2028 00:00:00
Samarth Shivani Co-Operative Housing Society LimitedGURURAJ ENTERPRISES BUILDERS AND DEVELOPERSS.No. 31, H. No. 2/A, Plot No. 8 & 931-08-2025 00:00:00
SATYAM SHEELA WING FSHREEJI DEVELOPERSSurvey No 72/4 And Survey No 73/1/B, Shirgaon,Badlapur-42150331-07-2026 00:00:00
Sai FloraM/S MITRA REALITY59, Hissa No 1 B Part31-12-2026 00:00:00
SAI CHARAN APARTMENTSAI CHARAN ENTERPRISESSurvey No 39, Hissa No 2D31-12-2025 00:00:00
Project Details
  • Project:
    Mohan Areca
  • Location:
  • Survey No 4/Hissa No 1P
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    MOHAN LIFESPACES LLP
  • Phone:
  • Address:
  • Mohan Plaza
Project RERA Details
MAHA REARA No: P51700000829
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Raj Associates
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2022
Litigations No Litigations
Last Modified 08 Sep 2021
Last Retrived 13 Feb 2026
Mohan Areca QR Code
Mohan Areca
MahaRERA - P51700000829
Apartment Details & Configuration
TypeArea
2 BHK35.5 Sq.mts. ( 382 Sq.ft. )
2 BHK35.51 Sq.mts. ( 382 Sq.ft. )
2 BHK38.7 Sq.mts. ( 417 Sq.ft. )
2 BHK39.1 Sq.mts. ( 421 Sq.ft. )
2 BHK39.51 Sq.mts. ( 425 Sq.ft. )
2 BHK40.12 Sq.mts. ( 432 Sq.ft. )
2 BHK41.62 Sq.mts. ( 448 Sq.ft. )
1 BHK28 Sq.mts. ( 301 Sq.ft. )
1 BHK28.13 Sq.mts. ( 303 Sq.ft. )
1 BHK29.23 Sq.mts. ( 315 Sq.ft. )
1 BHK29.27 Sq.mts. ( 315 Sq.ft. )
2 BHK35.87 Sq.mts. ( 386 Sq.ft. )
2 BHK36.25 Sq.mts. ( 390 Sq.ft. )
2 BHK36.36 Sq.mts. ( 391 Sq.ft. )
2 BHK36.74 Sq.mts. ( 395 Sq.ft. )
2 BHK38.16 Sq.mts. ( 411 Sq.ft. )
2 BHK38.63 Sq.mts. ( 416 Sq.ft. )
2 BHK38.64 Sq.mts. ( 416 Sq.ft. )
Shop13.62 Sq.mts. ( 147 Sq.ft. )
Shop22.7 Sq.mts. ( 244 Sq.ft. )
Shop24.58 Sq.mts. ( 265 Sq.ft. )
Shop29.41 Sq.mts. ( 317 Sq.ft. )
Shop32.25 Sq.mts. ( 347 Sq.ft. )
Shop39.02 Sq.mts. ( 420 Sq.ft. )
Shop47.32 Sq.mts. ( 509 Sq.ft. )
Shop48.4 Sq.mts. ( 521 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mohan Arecalast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
AC Library
-
Acupressure Track
-
Aerobics / Meditation Room
-
Aggregate area of recreational Open Space
-
Amphitheater
-
Archery Net
-
Art and Craft Room
-
Children???s Play Area
-
Club House
-
Community Buildings50% completed
50% Complete
-
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
-
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
-
Gazebo
-
Gymnasium
-
Indoor Badminton Court
-
Indoor Games
-
Jacuzzi, Steam & Sauna
-
Jogging Track
-
Landscape Garden
-
Landscaping & Tree Planting90% completed
90% Complete
-
Mini Theater
-
Net Café
-
Open Parking
-
Rock Climbing
-
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
-
SOLAR POWER
-
Solid Waste Management And Disposal
-
Storm Water Drains100% completed
95% Complete
-
Street Lighting100% completed
95% Complete
-
Swimming Pool
-
Table Tennis
-
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
-
Virtual Games ( Golf & Car Racing)
-
Water Conservation, Rain water Harvesting100% completed
95% Complete
-
Water Supply100% completed
95% Complete
-
Buildings / Wings in Mohan Areca
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mohan Areca by MOHAN LIFESPACES LLPlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

78283 Sq. ft.

Project Area

7828 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

224 apartments in total
Total
224
Booked
224
Available
0

Saleable Area Statistics (Sq. ft.)

88439 Total
Total
88439
Booked
88439
Available
0
Total 224 apartments in project. 224 apartments booked. 100% apartments booked.
Total 88439 Sq.ft. saleable area. 88439 saleable area booked.
100% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 2019171010816
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK35.5 Sq.mts. ( 382 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK35.51 Sq.mts. ( 382 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK38.7 Sq.mts. ( 417 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK39.1 Sq.mts. ( 421 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK39.51 Sq.mts. ( 425 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK40.12 Sq.mts. ( 432 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHK41.62 Sq.mts. ( 448 Sq.ft. )8
8 Booked100% Booked
100% Booked
96 total apartments / 96 apartments booked. 100% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 2019171010820
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28 Sq.mts. ( 301 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK28.13 Sq.mts. ( 303 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK29.23 Sq.mts. ( 315 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK29.27 Sq.mts. ( 315 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK35.87 Sq.mts. ( 386 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK36.25 Sq.mts. ( 390 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK36.36 Sq.mts. ( 391 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK36.74 Sq.mts. ( 395 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK38.16 Sq.mts. ( 411 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK38.63 Sq.mts. ( 416 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK38.64 Sq.mts. ( 416 Sq.ft. )8
8 Booked100% Booked
100% Booked
96 total apartments / 96 apartments booked. 100% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 201941010822
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK35.5 Sq.mts. ( 382 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK35.51 Sq.mts. ( 382 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK39.1 Sq.mts. ( 421 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK39.51 Sq.mts. ( 425 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK40.12 Sq.mts. ( 432 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK41.62 Sq.mts. ( 448 Sq.ft. )1
1 Booked100% Booked
100% Booked
18 total apartments / 18 apartments booked. 100% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 20191100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Shop13.62 Sq.mts. ( 147 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop22.7 Sq.mts. ( 244 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop24.58 Sq.mts. ( 265 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop29.41 Sq.mts. ( 317 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop32.25 Sq.mts. ( 347 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop39.02 Sq.mts. ( 420 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop47.32 Sq.mts. ( 509 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop48.4 Sq.mts. ( 521 Sq.ft. )6
6 Booked100% Booked
100% Booked
14 total apartments / 14 apartments booked. 100% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
MOHAN LIFESPACES LLP
for Project
Mohan Areca
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation