Project overview

Modispaces Tashkent is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800003762. Modispaces Tashkent is located at Yfbt2v2+Zw8ldlb1mtgkb1htavo5xztnycqkrxnxeyowsfgsabv4xktjdqtkapfl. This is a Ongoing being developed by Modispaces Real Estate Pvt Ltd.

Modispaces Tashkent has 1 BHK Big, 1 BHK Small, 1 BHK with Terrace, 2 BHK & 3 BHK Apartments with carpet areas ranging from 450 to 833 Sq.ft. Carpet. The Project has total 34 of which 6 are currently available for sale.

Modispaces Tashkent is being developed on a total land area of 17405 Sq.ft. out of which 2429 Sq.ft. i.e 14% is reserved for recreational purposes. Modispaces Tashkent has 2 Wings / Towers Tashkent Phase 1,Tashkent Phase 2

ProjectDeveloperLocationPossession
A And O EminenteAshapura Housing Private Limited400068, Mumbai Suburban31-12-2021 00:00:00
New Tashkent Terrace ChslAmar AssociatesKbamhlwzojcix0nfkf6m6a==01-10-2018 00:00:00
Shri Vallabh ResidencySwadhinta Builders Llp Jczarsl8c7udhn7qenl3gg==26-01-2022 00:00:00
Romell CornerstoneRomell Real Estate Private LimitedSorsdibvalcyurqpqft2hsie+Zdzrdlhbtx56z4imbe=31-03-2024 00:00:00
Om Moti Nagar ChslRenovator ConstructionE8l3gnio/2Esxqs2tuumn+H8055sjtifnqo1qvlrre4=30-06-2024 00:00:00
Shiv Shreyas ChslK P Developers5Iqaxualf2+Aqinrkuqn0w==31-12-2025 00:00:00
Suryadarshan Chs LtdH&D Projects19Eqqc2wklfzmmbbkoadoq==30-04-2024 00:00:00
Megha Edge- Red RoseMegha Lakshmi Enterprise2O4emi/Akbdqselsfgyela==30-09-2025 00:00:00
Chheda BhuvanHaresh Popatlal ChhedaCy1i2wq+Tnazjgkeaqkerfzafl6ml60ot8ogltexdos=31-12-2026 00:00:00
Earth Residency Wing C And Wing DEarth Estate Developers Pvt LtdXtsoxab6il0puhllpa6imfrqh0ox3mhpi0ypuo5mzuo=28-08-2023 00:00:00
AsharaDevleela DevelopersDnxo5g43kfusasishjzqrw==31-12-2019 00:00:00
Target The MallMahendra Jamnadas KaraO6tjintsywmhn3jtkv1zdtaedm3nltlf/Qiwt3w6bmw=31-12-2017 00:00:00
Pushkar ApartmentSayalee Sanjesh Patkar8Az/04Vn9mx3qarbffg15ki9ovx0mpazqjuy8g82sfxenfpt+G9djunbuuk/J8lo31-03-2019 00:00:00
Modispaces TashkentModispaces Real Estate Pvt LtdYfbt2v2+Zw8ldlb1mtgkb1htavo5xztnycqkrxnxeyowsfgsabv4xktjdqtkapfl31-12-2018 00:00:00
Borivali Sagar ChslMahavir InfraprojectsRvilfikjc2fuqzvsgpmy4jddv6e1pusxiabc7a0kljo=31-03-2026 00:00:00
Sianna HeightsShubhjivan Builders Pvt LtdNgq5nsxzibi9svo14iy+Plfwtcvbillgj3s5vdely2q=31-08-2025 00:00:00
The Konark RiseKonark Rajendra ShahW4eokwe5+Wczcufswo4adq==31-03-2026 00:00:00
Rishabraj DivineM/S. Rishabraj Balaji InfraXkuymijzql9eazxs1z8af3av/Djrdvdd0oqifou2wow=30-10-2023 00:00:00
Sankeshwar DarshanM/S. Rishabraj Balaji InfraHml/Ukassvrc4m8vgxyxwb+1Jcvjgt/C0e1tno1ax3kjnk7ljdstiipkjbnbwcsj30-10-2023 00:00:00
101 BoulevardH M DevelopersTtu4s9tpp4kmo9yguwtnwy16pxwxz6ngzacs7q//Rvi=30-06-2026 00:00:00
Maruti ResidencyOm ConstructionOxvxfxyhxgjlystdie3wyq==30-06-2025 00:00:00
Saffron PeaceRishabraj Namo Enterprise LlpP/Iv3lc1lped5agqsumg92v/Zdrbvgt269yko7pdi5w=31-12-2027 00:00:00
Rishabraj PhoenixRishabraj Estate Developers Pvt LtdYukfp3bo+6Tz1t1bre8lta==28-02-2027 00:00:00
MatruchhayaM/S. Rishabraj Balaji Infra4Nryghkl7ay2lymlylwjmk90afaeolskboeyjeyslto=31-12-2024 00:00:00
SaraswatiKarmvir Saraswati Developers LlpMd9jhtjruxzotosqfkse/Pxwj6mtuudi1wgdheqv7oujgaec0kzopzzr8lls+Mkorlf3k1yotjmryml2bes6vkmdxvxorwsy05y7pqzfrgy=24-12-2024 00:00:00
Shree Rasraj TowerK Mehta And CompanyLuvuyk/Jqlhlnztoutdzwpjdjzrgfbpmnzwkilrvxfo=31-12-2019 00:00:00
Dahisar Manisha Chs LtdMitnetra EnterpriseRteuk/Runtdkn2ugnw5fah5o1lyhgzyhh8ghe1u4x6u=31-12-2019 00:00:00
Sai LeelaLaxmi AssociatesNd5di1flbwwkk6lmyzq9gejbr2zbilecetr7bxfwtta=31-12-2019 00:00:00
Shree YashodhanK Mehta And CompanyE8hzguwjw6nm6dn7cjzxbw==30-09-2025 00:00:00
Jeevan Shobha Chsl And Bhansali ChslHirani Realtors LlpLcqgtjx96jfxdn5jo/Gvshixynoclxrsrvveqf2oqeeeb54ktsyl+Gbwdq6av+Lc31-03-2026 00:00:00
Borivali Yashodhan ChslTgn Realtor LlpH1ydfyazwnqsgkfguxo+Ha==30-06-2024 00:00:00
AudumbarVas Builder & DevelopersPcuw76gswj5x90+Itralbq==31-12-2019 00:00:00
Rbi Employees Siddhivinayak Chs LtdVasundhara Builders4Fgifstanxecgtzmgtdvtq==30-12-2020 00:00:00
Kaveri HeightsKaveri GoldZh5zlby42zlzcaoorhmvuw==30-12-2021 00:00:00
The EricaHindustan Realty LimitedZ3lon7mz0llib9ne/Qgjsg==31-12-2026 00:00:00
Ganesh Chhaya ChslVasundhara Develocus Llp+Sdsu3zzulwfly5ihqhc7q==31-12-2028 00:00:00
21 JewelRatansingh And BrothersHlfrkostfhskjrzox84npccuzjedrcw0wsw62csycpi=31-12-2028 00:00:00
Girivar AvenueMehta SpacesQafwwkewszdyodjfbhsutigtysdhhsgjljj50mvwshbuqdll/Yzdk/Ekxt2cva/Vnyoafeu2szzoks0cdorupotzhirzwwonjf1+Oakjomz8i9pr5wb+Hxsasovvxe7v31-12-2026 00:00:00
Shila Bina Chs LtdMs InfrastructurePjuk7lekopavfyrwjri6ew==31-12-2025 00:00:00
Ankit ChsAditya Developers0Sgcdvlzu8+K52bvn2in+Q==25-12-2019 00:00:00
Shree KrishnaShakuntala BhoirMumbai Suburban, 40006831-12-2018 00:00:00
Nishchay Wing FShreeraj Developer LlpRqey4x9ui6rbj3kh1o4vmg==30-12-2024 00:00:00
PavapuriKum Kum EnterprisesQo7ap3oumpaoxijoh2l+0Q==31-12-2026 00:00:00
Borivali Kesar Kripa Chs LtdBorivali Kesar Kripa Chs LtdQabuheoe+Mqss0p/Zfpy/Q==31-12-2027 00:00:00
Varella MansionDean Home Llp2Prm01d6zzvl19chrqigp7fbfpjesbesvfgizeau/V8=31-10-2027 00:00:00
Unicorn HeightsTeoama Infrastructure Private LimitedGglw2u/3Pcwcznlspaomnhlcxcqw/Uflnnlwz8z3nle=30-06-2025 00:00:00
Kaveri HeritageKaveri Shine Builders And Developers LlpI2ci4eieaijqqbzwpzx+Jg==31-03-2025 00:00:00
Borivali New Roma Sadan ChslSumukh InfraprojectJptqfcg0uvxkt5+Qgqxbzq==30-06-2023 00:00:00
Nishchay - Wing EShreeraj Developer LlpRqey4x9ui6rbj3kh1o4vmg==30-12-2024 00:00:00
Nishchay Wing DShreeraj Developer LlpNructmdx/Qwjwpgvblmjfg==30-12-2024 00:00:00
Proposed Redevelopment Of Prakashkunj ChslYash Realtors & Developers7Xipfhvqbs+Wwukevke5w70kojvlbyvqgrj1etls4tq=30-12-2023 00:00:00
Jay Shrinath ChslK Mehta And CompanyHguulqifjlu2iaqcb758nq==30-06-2025 00:00:00
Mary VillaH&D Projects5Rib3y/Gfb127cgowsyuyw==31-12-2023 00:00:00
Rite FortisRite Housing DevelopersEhprseqdcqo4oh6xocwc+A==31-03-2023 00:00:00
Arkade CrownArkade Developers Private LimitedPrvor++El1fudpo1y6md/Q==31-12-2025 00:00:00
Rishabraj ChambersRishabraj Estate Developers Pvt LtdQv6rbotjo5ykz5nuidmmmo/5H58um5xtv1liqckuuiu=31-12-2025 00:00:00
Crescent HeightsHarshmaan Spaces LlpWw+Gwmxeb5ph0nrzbqrp+Ca+9D5hltkk+7Uqkzfxnnc=31-03-2025 00:00:00
Govind Nagar Sra Chs Ltd.Drishti Developers IiR/2Lv+Rjiw4/Tbafbgspiqm2v4pnbbvpent1b6lbkiemuqoxutam0hwi8do65hte01-09-2022 00:00:00
MadonnaMichael Rodrigues8Smururjovg+3V6y1pwekq==15-12-2019 00:00:00
Shri Hari BuildingShri Neelkanth Developers3Zg6ixbnssbbn613yaak0w==31-01-2019 00:00:00
Parag - Reserve Co-Op Hsg SocSadguru Buildspacespvt. Ltd.3Hnhjahsx9++Vxwv1sgthq==30-12-2020 00:00:00
Maa EnrichDhanish Jitendra ShahA/Xsd5ynqsaqjazt0y+Yjg==31-05-2018 00:00:00
Golden GatewayD.N DevelopersMpwow3uysasdjgec0eqtnq==31-12-2029 00:00:00
KASHI BHUVANBHARAT V KENNY1011/A31-12-2024 00:00:00
Blue Star Crystal ChslParadigm Blue Star Llp5Ptzy29q9kenhntcso9kuw==12-07-2027 00:00:00
Apurva Vaishali ChslDiravya Developers Llp3Nllyyapenlahdku9pkjya==30-09-2025 00:00:00
103 WestM/S. Relcon Zp Je Construction LlpFmq6rurkazksxgo+Alsysa==31-03-2029 00:00:00
Borivali Sai Hill ChsThe Green Venturez RealtorsZfptieagfr+Yel9oqtgseg==31-12-2026 00:00:00
Shreeji LeelaK Mehta And CompanyJ4hhwt+Trjpx5pg2fcrnxr5ocrnskvdqmyzffqfzcts=30-06-2028 00:00:00
Pratham - By ShraddhaShraddha Prime Projects Limited0Dhooynxpjsglqxlkpi+2Ooiiko+4Hxi5j2vdedjvsi=31-12-2029 00:00:00
State Sector Bank Employees Chs Ltd Kailas BuildingKonark Structural Engineers Private LimitedNlvxg3uxzrzqudvziiqaww==31-03-2025 00:00:00
Bhavik Darshan Chs Ltd And Gajmukh Chs LtdKonark Structural Engineers Private LimitedDddho45evol0zxr4eg1mrjtll1g1r3ckleohhmws/Ighhuti2pkwl1v7azlv8jncvcgfn8jnzczzlzo5avvsm+Xn3jtpscytqpmxfv2tanq=31-12-2027 00:00:00
Adinath HeightsShri Neelkanth DevelopersGx8jresglohl4kq2t6/O0g==31-03-2026 00:00:00
GagansagarHum Developers Private LimitedL5cun8pqwkdmfj1bzztvda==31-12-2026 00:00:00
Rishabraj EmeraldH Rishabraj UniversalWglijtqx0e7mfsq+Nfhx7a==31-12-2026 00:00:00
66 Aventus AvenueAventus Infrastructure LlpYump8ulrxlsb5qvgcpr67ha6k8iaqqc3yovfje3c78a=31-12-2029 00:00:00
Shiv Guru TowerRajlaxmi DevelopersHccj4hqz12x65owbz6kokw==31-12-2027 00:00:00
Hariko BrahmaShree ParashnathAgkihnkce4thpeib3jb+2Qrupab/Y1wq+Pxzev5dufm2uziifdlcqugpcc9baufdidjsuksu/Xrc+Kdcg1eu1fhnj0zlmrzq48gnix4xznxtosdkwvzmpkbl7qrgsxmmyyjdywylimwvhbqjnkaodjgnfc6p57tumgyngfnxxv5fxfhol9jxdaefbsoewvhdaubwltkxygrh5dngyziakq==31-12-2029 00:00:00
Shiv ParbatV3 PartnersFo2virvki0wqjlt0kvglqa==15-03-2027 00:00:00
Garden ViewSmlife Shreeji Developers LlpOi19z2eonrb20x5rp5o9xa==30-05-2025 00:00:00
Chaitanya Om Shivam - Om Shivam Premises CslChaitanya Enterprises84Mnczrpwpqx3l35tlkciq==31-05-2024 00:00:00
Suresh SadanJaverben Nenshi ChhadvaMdwjkl/Boww91dldjonbjruk1qwdjmikznmpbzmyjicdnpf2eg44ophso+4Ild6k7webobjwaqj+Q3jpv7wxx9ibkfzrjcvjpxukpzxklkg=31-12-2018 00:00:00
Redevelopment Of Pushpawadi ChslPranav Constructions LimitedQxo1njydyf0c1wl4lccuia==30-12-2023 00:00:00
Sbi Ragvihar ChsTuvin Consultancy Llp/Pnegt/5Coplf0ogc2d4za==10-12-2020 00:00:00
Aakasha ChslTrivenidevelopersUq5bj6szn8+Fp7aswv0twa==31-12-2017 00:00:00
Jalaram SquareShree Jalaram Developers30-09-2027 00:00:00
Romell ShraddhaShraddha Shivshakti DevelopersLtap1cgpq0i5beh8guodygimwlns7iad3drxwrpdpee=31-12-2018 00:00:00
Parmarth Niketan - Redevelopment Of Mani BhuvanJ V Constructions & DevelopersJ6dguqag5bty4najjzysdvptuaexypzy5bloetwwd80=31-12-2019 00:00:00
Parimal HeritageDvnm Realty Private Limited2Thueykpl152fza9lpeuopa4ohmjuj+7J0v+9Rtfvla=31-03-2027 00:00:00
Avvirahi PlatinumAvvirahi Infra Llp25-12-2030 00:00:00
Shree Hari Om NagarRising Pioneers Infra LlpBao7qcbctijrofixgzavsq==31-12-2027 00:00:00
ShivalayaParadigm Friends Realtors Llp 02-01-2029 00:00:00
Concepta ChslHirani Realty17-12-2027 00:00:00
Jaykant BlissChitalia BuildersGlloqtuc2vtuung1wgdetw==17-12-2026 00:00:00
Avyukta JayeshShivoham Infrahomes Llp31-03-2029 00:00:00
Girnar Apartment Co-Operative Housing Society LimitedKonark Structural Engineers Private Limited31-12-2029 00:00:00
Parekh EminenceParekh Spaces Llp31-12-2028 00:00:00
Harshail Iris ApartmentHarshmaan Spaces Llp30-09-2029 00:00:00
Ami OneAmi Wiseowlzz Realty31-12-2027 00:00:00
Redevelopment Of Sbi Emp Navjeevan ChslPranav Constructions Limited21-07-2028 00:00:00
Rajhans VandanaRajhans Constructions31-12-2027 00:00:00
Gorai Samadhan Cooperative Housing Society LimitedGorai Samadhan Cooperative Housing Society Limited30-06-2027 00:00:00
Rijin PrideSurbhi Construction30-09-2028 00:00:00
25 RbcRander Bandhu Corporation Llp31-03-2029 00:00:00
Empire EternityEmpire Land Developers Llp31-07-2028 00:00:00
Poonam ChslDigam Lifespaces LlpYcmaqebhjo/Zl+Nti/Kcqd0zysokl16vrzn26cxe7b3squdenapxncxml2ursljl31-10-2027 00:00:00
Manglam RajanigandhaManglam & Karnani Ventures LlpRmfgecjt2huzyguipndxuw==30-06-2027 00:00:00
Rohom RadianceRohom Realty01-09-2029 00:00:00
Project Details
  • Project:
    Modispaces Tashkent
  • Location:
  • Yfbt2v2+Zw8ldlb1mtgkb1htavo5xztnycqkrxnxeyowsfgsabv4xktjdqtkapfl
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Modispaces Real Estate Pvt Ltd
  • Phone:
  • Address:
  • Prem Sagar
Project RERA Details
MAHA REARA No: P51800003762
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Chogle & Associates
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 21 Mar 2018
Last Retrived 13 Feb 2026
Modispaces Tashkent QR Code
Modispaces Tashkent
MahaRERA - P51800003762
Apartment Details & Configuration
TypeArea
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )
2 BHK Big71.26 Sq.mts. ( 767 Sq.ft. )
2 BHK Medium68.28 Sq.mts. ( 735 Sq.ft. )
3 BHK72 Sq.mts. ( 775 Sq.ft. )
Office Unit Big63.55 Sq.mts. ( 684 Sq.ft. )
Office Unit Small34 Sq.mts. ( 366 Sq.ft. )
1 BHK Big47.2 Sq.mts. ( 508 Sq.ft. )
1 BHK Small41.8 Sq.mts. ( 450 Sq.ft. )
2 BHK71.25 Sq.mts. ( 767 Sq.ft. )
3 BHK77.38 Sq.mts. ( 833 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Modispaces Tashkentlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Mechanical Parking100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Modispaces Tashkent
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Modispaces Tashkent by Modispaces Real Estate Pvt Ltdlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

17405 Sq. ft.

Project Area

2429 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

34 apartments in total
Total
34
Booked
28
Available
6

Saleable Area Statistics (Sq. ft.)

21213 Total
Total
21213
Booked
17930
Available
3283
Total 34 apartments in project. 28 apartments booked. 82% apartments booked.
Total 21213 Sq.ft. saleable area. 17930 saleable area booked.
85% area booked.

Tashkent Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tashkent Phase 1Dec 2018151110057
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK Big71.26 Sq.mts. ( 767 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK Medium68.28 Sq.mts. ( 735 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK72 Sq.mts. ( 775 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office Unit Big63.55 Sq.mts. ( 684 Sq.ft. )1
None Booked0% Booked
0% Booked
Office Unit Small34 Sq.mts. ( 366 Sq.ft. )1
None Booked0% Booked
0% Booked
22 total apartments / 20 apartments booked. 90% apartments booked.
Work Description in Building Tashkent Phase 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tashkent Phase 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tashkent Phase 2Dec 20183000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Big47.2 Sq.mts. ( 508 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK Small41.8 Sq.mts. ( 450 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK with Terrace47.2 Sq.mts. ( 508 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK71.25 Sq.mts. ( 767 Sq.ft. )3
2 Booked66% Booked
66% Booked
3 BHK77.38 Sq.mts. ( 833 Sq.ft. )3
3 Booked100% Booked
100% Booked
12 total apartments / 8 apartments booked. 66% apartments booked.
Work Description in Building Tashkent Phase 2Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Modispaces Real Estate Pvt Ltd
for Project
Modispaces Tashkent
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation