Project overview
Mirador Prangan Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700013154. Mirador Prangan Phase 1 is located at Thane, 421601. This is a On-Going Project being developed by Mirador Dewellers Pvt Ltd.
Mirador Prangan Phase 1 has 1 BHK RESIDENTIAL, 1 BHK WITH TERRACE, 1 RK RESIDENTIAL & 1.5 BHK RESIDENTIAL Apartments with carpet areas ranging from 263 to 403 Sq.ft. Carpet. The Project has total 330 of which 330 are currently available for sale.
Mirador Prangan Phase 1 is being developed on a total land area of 138856 Sq.ft. out of which 13886 Sq.ft. i.e 10% is reserved for recreational purposes. Mirador Prangan Phase 1 has 4 Wings / Towers A1 A And B,A2 A And B,A3 A And B,B
| Project | Developer | Location | Possession |
-
Project:
Mirador Prangan Phase 1
-
Location:
-
Thane, 421601
-
Const. Stage:
On-Going Project
-
Possession:
31 Aug 2022
-
Developer:
Mirador Dewellers Pvt Ltd
-
Phone:
-
Address:
-
301, 302, 303, Damji Shamji Corporate Square, Laxmi Nagar, Behind Kanara Business Centre, Ghatkopar East, 400075
| MAHA REARA No: |
P51700013154 |
| Project Type |
Residential |
| RERA Project Status |
On-Going Project |
| Funding Bank |
HDFC |
| Proposed Possession |
31 Aug 2022 |
| Revised Possession |
28 Aug 2023 |
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
07 Sep 2017 |
| Last Retrived |
28 Jul 2025 |
Mirador Prangan Phase 1 QR Code
Mirador Prangan Phase 1
MahaRERA - P51700013154
| Type | Area |
| 1 BHK | 30.61 Sq.mts. ( 329 Sq.ft. ) |
| 1 RK | 25.11 Sq.mts. ( 270 Sq.ft. ) |
| 1.5 BHK RESIDENTIAL | 39.47 Sq.mts. ( 425 Sq.ft. ) |
| OFFICE 10 | 15.37 Sq.mts. ( 165 Sq.ft. ) |
| OFFICE NO 1 | 8.99 Sq.mts. ( 97 Sq.ft. ) |
| OFFICE NO 11 | 7.75 Sq.mts. ( 83 Sq.ft. ) |
| 1 BHK RESIDENTIAL | 28.61 Sq.mts. ( 308 Sq.ft. ) |
| 1 RK RESIDENTIAL | 24.45 Sq.mts. ( 263 Sq.ft. ) |
| 1.5 BHK RESIDENTIAL | 37.47 Sq.mts. ( 403 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Mirador Prangan Phase 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space15% completed
|
|
Will Be Done As Per Site Progress |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Will Be Done As Per Site Progress |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Will Be Done As Per Site Progress |
Landscaping & Tree Planting15% completed
|
|
Will Be Done As Per Site Progress |
Open Parking25% completed
|
|
Will Be Done As Per Site Progress |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Will Be Done As Per Site Progress |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Na |
Street Lighting10% completed
|
|
Lighting On Roads And Common Area |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting10% completed
|
|
Will Be Done As Per Site Progress |
Water Supply15% completed
|
|
Borewell / Grampanchyat Water Connection Progress |
Buildings / Wings in Mirador Prangan Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mirador Prangan Phase 1 by Mirador Dewellers Pvt Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
330
apartments in total
Saleable Area Statistics (Sq. ft.)
113068
Total
Total 330 apartments in project. 0 apartments booked. 0% apartments booked.
Total 113068 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A1 A And B | Jan 1900 | 8 | 1 | 0 | 0 | 0 | 4 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30.61 Sq.mts. ( 329 Sq.ft. ) | 8 | |
| 1 BHK WITH TERRACE | 30.61 Sq.mts. ( 329 Sq.ft. ) | 8 | |
| 1 RK | 25.11 Sq.mts. ( 270 Sq.ft. ) | 28 | |
| 1.5 BHK RESIDENTIAL | 39.47 Sq.mts. ( 425 Sq.ft. ) | 44 | |
| OFFICE 10 | 15.37 Sq.mts. ( 165 Sq.ft. ) | 1 | |
| OFFICE NO 1 | 8.99 Sq.mts. ( 97 Sq.ft. ) | 1 | |
| OFFICE NO 11 | 7.75 Sq.mts. ( 83 Sq.ft. ) | 1 | |
| OFFICE NO 12 | 8.99 Sq.mts. ( 97 Sq.ft. ) | 1 | |
| OFFICE NO 2 | 7.75 Sq.mts. ( 83 Sq.ft. ) | 1 | |
| OFFICE NO 3 | 15.37 Sq.mts. ( 165 Sq.ft. ) | 1 | |
| OFFICE NO 4 | 15.37 Sq.mts. ( 165 Sq.ft. ) | 1 | |
| OFFICE NO 5 | 7.75 Sq.mts. ( 83 Sq.ft. ) | 1 | |
| OFFICE NO 6 | 8.99 Sq.mts. ( 97 Sq.ft. ) | 1 | |
| OFFICE NO 7 | 8.99 Sq.mts. ( 97 Sq.ft. ) | 1 | |
| OFFICE NO 8 | 7.75 Sq.mts. ( 83 Sq.ft. ) | 1 | |
| OFFICE NO 9 | 15.37 Sq.mts. ( 165 Sq.ft. ) | 1 | |
100 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A1 A And B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A2 A And B | Jan 1900 | 8 | 8 | 0 | 0 | 0 | 4 | 4 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK RESIDENTIAL | 30.61 Sq.mts. ( 329 Sq.ft. ) | 8 | |
| 1 BHK WITH TERRACE | 30.61 Sq.mts. ( 329 Sq.ft. ) | 8 | |
| 1 RK RESIDENTIAL | 25.11 Sq.mts. ( 270 Sq.ft. ) | 28 | |
| 1.5 BHK RESIDENTIAL | 39.47 Sq.mts. ( 425 Sq.ft. ) | 48 | |
92 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A2 A And B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A3 A And B | Jan 1900 | 8 | 1 | 0 | 0 | 0 | 4 | 4 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK RESIDENTIAL | 30.61 Sq.mts. ( 329 Sq.ft. ) | 8 | |
| 1 BHK WITH TERRACE | 30.61 Sq.mts. ( 329 Sq.ft. ) | 8 | |
| 1 RK RESIDENTIAL | 25.11 Sq.mts. ( 270 Sq.ft. ) | 28 | |
| 1.5 BHK RESIDENTIAL | 39.47 Sq.mts. ( 425 Sq.ft. ) | 48 | |
92 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A3 A And B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B | Jan 1900 | 8 | 1 | 0 | 0 | 0 | 4 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK RESIDENTIAL | 28.61 Sq.mts. ( 308 Sq.ft. ) | 2 | |
| 1 BHK WITH TERRACE | 28.61 Sq.mts. ( 308 Sq.ft. ) | 2 | |
| 1 RK RESIDENTIAL | 24.45 Sq.mts. ( 263 Sq.ft. ) | 32 | |
| 1.5 BHK RESIDENTIAL | 37.47 Sq.mts. ( 403 Sq.ft. ) | 10 | |
46 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Mirador Dewellers Pvt Ltd
for Project
Mirador Prangan Phase 1
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |