Project overview

Midtown Twin Towers is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700031951. Midtown Twin Towers is located at S. No. 12, H. No. 3. This is a New being developed by Shirdi Sai Sheltors Llp.

Midtown Twin Towers has 1 BHK & 2 BHK Apartments with carpet areas ranging from 583 to 865 Sq.ft. Carpet. The Project has total 226 of which 209 are currently available for sale.

Midtown Twin Towers is being developed on a total land area of 65660 Sq.ft. Midtown Twin Towers has 2 Wings / Towers Midtown Twin Towers T-1,Midtown Twin Towers T-2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Midtown Twin Towers
  • Location:
  • S. No. 12, H. No. 3
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Shirdi Sai Sheltors Llp
  • Phone:
  • Address:
  • Royal Marbles
Project RERA Details
MAHA REARA No: P51700031951
Project Type Residential / Group Housing
RERA Project Status New
Architect Vitan Consultants
Funding Bank SARASWAT COOPERATIVE BANK LIMITED
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 Feb 2024
Last Retrived 26 Jul 2025
Midtown Twin Towers QR Code
Midtown Twin Towers
MahaRERA - P51700031951
Apartment Details & Configuration
TypeArea
1 BHK45.8 Sq.mts. ( 493 Sq.ft. )
1 BHK47.33 Sq.mts. ( 509 Sq.ft. )
2 BHK69.99 Sq.mts. ( 753 Sq.ft. )
1 BHK54.16 Sq.mts. ( 583 Sq.ft. )
1 BHK54.71 Sq.mts. ( 589 Sq.ft. )
2 BHK74.48 Sq.mts. ( 802 Sq.ft. )
2 BHK80.33 Sq.mts. ( 865 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Midtown Twin Towerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Shall Be Done Prior To Oc
Energy management
Shall Be Done Prior To Oc
Fire Protection And Fire Safety Requirements
Shall Be Done Prior To Oc
Landscaping & Tree Planting
Shall Be Done Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Stp
Solid Waste Management And Disposal
Shall Be Done Prior To Oc
Storm Water Drains
Shall Be Done Prior To Oc
Street Lighting
Shall Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water
Shall Be Done Prior To Oc
Water Conservation, Rain water Harvesting
Shall Be Done Prior To Oc
Water Supply
Shall Be Done Prior To Oc
Buildings / Wings in Midtown Twin Towers
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Midtown Twin Towers by Shirdi Sai Sheltors Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

65660 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

226 apartments in total
Total
226
Booked
17
Available
209

Saleable Area Statistics (Sq. ft.)

136025 Total
Total
136025
Booked
11378
Available
124647
Total 226 apartments in project. 17 apartments booked. 7% apartments booked.
Total 136025 Sq.ft. saleable area. 11378 saleable area booked.
8% area booked.

Midtown Twin Towers T-1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Midtown Twin Towers T-1Dec 202531111001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.8 Sq.mts. ( 493 Sq.ft. )60
1 BHK47.33 Sq.mts. ( 509 Sq.ft. )60
2 BHK69.99 Sq.mts. ( 753 Sq.ft. )30
None Booked0% Booked
0% Booked
150 total apartments / 4 apartments booked. 2% apartments booked.
Work Description in Building Midtown Twin Towers T-1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress59% done
59% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked

Midtown Twin Towers T-2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Midtown Twin Towers T-2Dec 202520111001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK54.16 Sq.mts. ( 583 Sq.ft. )33
1 BHK54.71 Sq.mts. ( 589 Sq.ft. )5
2 Booked40% Booked
40% Booked
2 BHK74.48 Sq.mts. ( 802 Sq.ft. )28
2 BHK80.33 Sq.mts. ( 865 Sq.ft. )10
4 Booked40% Booked
40% Booked
76 total apartments / 13 apartments booked. 17% apartments booked.
Work Description in Building Midtown Twin Towers T-2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shirdi Sai Sheltors Llp
for Project
Midtown Twin Towers
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation