Project overview

Metropolis - Aquaris Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700022959. Metropolis - Aquaris Phase 2 is located at 2/23. This is a New being developed by Anant Square.

Metropolis - Aquaris Phase 2 has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 166 to 564 Sq.ft. Carpet. The Project has total 93 of which 1 are currently available for sale.

Metropolis - Aquaris Phase 2 is being developed on a total land area of 5571 Sq.ft. Metropolis - Aquaris Phase 2 has 1 Wings / Towers A

ProjectDeveloperLocationPossession
Pushpanjali Residency Phase IiiShriraam Pioneer Developers Private Limited99/2, 99/4B, 101/3, 97/1, 58/1, 98/1A, 98/1B, 99/6 59/1A 99/4A, 59/230-12-2022 00:00:00
Ace Square Phase 1Anant SquareSurvey 2-28, 2-19, 2-3331-12-2017 00:00:00
Tropical Lagoon - 5 - Di VitaSoham Estates240/2 Pt, 240/3, 240/6, 240/7, 240/9, 240/10 Pt31-07-2022 00:00:00
Satgurus SolitaireBuildwell Land Developers Private Limited91, Owale, Thane31-12-2017 00:00:00
Project Details
  • Project:
    Metropolis - Aquaris Phase 2
  • Location:
  • 2/23
  • Const. Stage:
    New
  • Possession:
    30 Sep 2025
Developer Details

  • Developer:
    Anant Square
  • Phone:
  • Address:
  • Green Square
Project RERA Details
MAHA REARA No: P51700022959
Project Type Others
RERA Project Status New
Architect Ten Folds Architects & Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Sep 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 06 Nov 2019
Last Retrived 26 Jul 2025
Metropolis - Aquaris Phase 2 QR Code
Metropolis - Aquaris Phase 2
MahaRERA - P51700022959
Apartment Details & Configuration
TypeArea
1 BHK35.26 Sq.mts. ( 380 Sq.ft. )
1 BHK35.42 Sq.mts. ( 381 Sq.ft. )
1 BHK35.53 Sq.mts. ( 382 Sq.ft. )
2 BHK44.43 Sq.mts. ( 478 Sq.ft. )
2 BHK45.67 Sq.mts. ( 492 Sq.ft. )
2 BHK52.43 Sq.mts. ( 564 Sq.ft. )
Shop37 Sq.mts. ( 398 Sq.ft. )
Shop15.42 Sq.mts. ( 166 Sq.ft. )
Shop18.06 Sq.mts. ( 194 Sq.ft. )
Shop23.91 Sq.mts. ( 257 Sq.ft. )
Shop25.38 Sq.mts. ( 273 Sq.ft. )
Shop26.81 Sq.mts. ( 289 Sq.ft. )
Shop32.56 Sq.mts. ( 350 Sq.ft. )
Shop34.06 Sq.mts. ( 367 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Metropolis - Aquaris Phase 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
570.79 Sqmts Ground Rg+ 232.13 Sqmts Elevated Rg
CCTV in Entrance Lobby100% completed
95% Complete
Will Be Done Before Oc
Community Buildings
Na
DG backup for Common areas100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 1
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Will Be Done Before Oc
Energy management100% completed
95% Complete
Solar Water Heating Will Be Done Before Oc
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Will Be Done Before Oc As Per Cfo Noc
Fitness Center100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 1
Indoor games100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 1
Kids Play Area100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 1
Landscaping & Tree Planting100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 1
Open Parking
Na
Puzzle Parking Shared with Phase 1100% completed
95% Complete
64 Nos Mechanical/Puzzleparkingwith Elevated Rg
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 1
Solid Waste Management And Disposal
Na
Stack parkings in stilt100% completed
95% Complete
Total 63 No. Stack Parking Shared With Phase 1
Storm Water Drains100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 1
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 1
Water Supply100% completed
95% Complete
Will Be Supplied By Tmc After Oc
Buildings / Wings in Metropolis - Aquaris Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Metropolis - Aquaris Phase 2 by Anant Squarelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5571 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

93 apartments in total
Total
93
Booked
92
Available
1

Saleable Area Statistics (Sq. ft.)

37256 Total
Total
37256
Booked
36905
Available
350
Total 93 apartments in project. 92 apartments booked. 98% apartments booked.
Total 37256 Sq.ft. saleable area. 36905 saleable area booked.
99% area booked.

A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ASep 202417101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.26 Sq.mts. ( 380 Sq.ft. )13
13 Booked100% Booked
100% Booked
1 BHK35.42 Sq.mts. ( 381 Sq.ft. )35
35 Booked100% Booked
100% Booked
1 BHK35.53 Sq.mts. ( 382 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHK44.43 Sq.mts. ( 478 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK45.67 Sq.mts. ( 492 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK52.43 Sq.mts. ( 564 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop37 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.42 Sq.mts. ( 166 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.06 Sq.mts. ( 194 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.91 Sq.mts. ( 257 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.38 Sq.mts. ( 273 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop26.81 Sq.mts. ( 289 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop32.56 Sq.mts. ( 350 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop34.06 Sq.mts. ( 367 Sq.ft. )1
1 Booked100% Booked
100% Booked
93 total apartments / 92 apartments booked. 98% apartments booked.
Work Description in Building ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Anant Square
for Project
Metropolis - Aquaris Phase 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation