Project overview

Metropolis - Aquaris Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700022961. Metropolis - Aquaris Phase 1 is located at 2/23. This is a New being developed by Anant Square.

Metropolis - Aquaris Phase 1 has 1 BHK Apartments with carpet areas ranging from 385 to 385 Sq.ft. Carpet. The Project has total 84 of which 0 are currently available for sale.

Metropolis - Aquaris Phase 1 is being developed on a total land area of 5849 Sq.ft. Metropolis - Aquaris Phase 1 has 3 Wings / Towers B1,B2,C

ProjectDeveloperLocationPossession
Pushpanjali Residency Phase IiiShriraam Pioneer Developers Private Limited99/2, 99/4B, 101/3, 97/1, 58/1, 98/1A, 98/1B, 99/6 59/1A 99/4A, 59/230-12-2022 00:00:00
Ace Square Phase 1Anant SquareSurvey 2-28, 2-19, 2-3331-12-2017 00:00:00
Tropical Lagoon - 5 - Di VitaSoham Estates240/2 Pt, 240/3, 240/6, 240/7, 240/9, 240/10 Pt31-07-2022 00:00:00
Satgurus SolitaireBuildwell Land Developers Private Limited91, Owale, Thane31-12-2017 00:00:00
Unnathi Woods Phase Vii AUnnathi Estates246 247/1 247/230-12-2025 00:00:00
Tokyo Bay Phase - 2APuranik Tokyo Bay Private Limited21/9-Pt 22/1-Pt 22/5-Pt 21/11A Pt 23/4 Pt30-12-2024 00:00:00
Platinum TowerHaware's Housing Development Finance Corporation Ltd.19/28 19/29 19/30 20/05 21/16 20/0630-09-2022 00:00:00
Tokyo Bay Phase - 1Puranik Tokyo Bay Private Limited20/1-Pt, 20/2B-Pt 30-10-2023 00:00:00
Rumahbali Phase 2Puranik Builders LimitedNew S No 100-15B, 17 Pt 18 Pt 19Pt And 23Pt, Old S No -197-15B 17 Pt 18 Pt 19Pt And 23Pt30-12-2023 00:00:00
Raunak HeightsUnnathi Associates67/8B 67/8A 66/5B30-12-2025 00:00:00
Ashok Smruti DefgM/S Keytech27/631-12-2019 00:00:00
Puranik City Reserva Phase 1Puranik Builders Limited67/1Pt 67/1Pt 1/12-7Pt 1/11-5Pt 1/4-12Pt 55/1Apt 55/1Bpt 54/4Pt 54/3Pt 53/2Pt, 3Pt30-03-2029 00:00:00
Rosa Oasis Phase 2Uma EnterprisesS.No. 124/2/3, 125/2, 125/3/131-12-2018 00:00:00
Fiama ResidencyFiama Construction CompanyMogharpada S No 57/2B, 57/2C, 57/330-12-2021 00:00:00
Shree Savali Wing BUmesh Raosaheb Pawar Patil HufS No 63 Hissa No 231-07-2019 00:00:00
Puraniks CapitolPuranik Builders Limited35/2, 3,4 And 530-12-2036 00:00:00
Dedhia Elita C WingJaydeep CorporationSurvey No 89 Hissa No 2B And Survey No 9030-06-2018 00:00:00
Ace Square Phase 2Anant Square2-19, 2-28, 2-3330-06-2024 00:00:00
Aarambh - CM/S. Annapurna Lifespaces Llp21/11B Pt30-06-2026 00:00:00
Dahlia Bldg A D And EHaware Engineers And Builders Private Limited47/1 48/2 48/3 48/6Ap 48/6B30-04-2019 00:00:00
TaranganMaison Constructions Private LimitedSurvey No.6, Hissa No. 3A And 3B31-05-2018 00:00:00
SubodhNew Homes Corporation17430-09-2020 00:00:00
PelicanM/S Ace Constructions27-2 27-3 27-830-06-2018 00:00:00
Horizon Classique-ISachin EnterprisesTika No-3 Chalta No- 13030-06-2018 00:00:00
Ace EnclaveAce Signature Homes Llp70/6, 53/631-12-2026 00:00:00
Metropolis BaysideAnant SquareGhodbunder Road31-05-2026 00:00:00
Rumah Bali Phase 4Puranik Builders LimitedS. No. Old 197 New 100 H. No. 11/1(P), 11/2(P), 12(P), 14(P), 15(P), 17(P), 18(P), 19(P), 19(P), 20(P), 21(P)31-12-2028 00:00:00
Olive ResidencyGoodwill PropertiesOld S.No. 55 New S.No. 66 H.No. 1/230-12-2021 00:00:00
Sai PalaceSai DeveopersChalta No 71,7231-03-2018 00:00:00
Mukund NiwasNew Vegas DevelopersChalta No 1930-09-2020 00:00:00
Sukur Enclave Phase 1Rajaram ConstructionSrno 7-22 7-23 7-25 7-26 Srno 11-7 Vadavli Srno 114-4 Owale Srno 242-1-1C Kavesar31-12-2018 00:00:00
Bhakti Pearl - CBhakti Corporation532, 53331-12-2017 00:00:00
Puranik Home Town - EPuranik Builders LimitedOld 75/Pt New 89/3C Pt And Old 76/5A Pt New 88/5A Pt30-12-2026 00:00:00
AnthuriumAarti EstatesPart Of - 7/15, 8/2/2, 8/4, 8/5, 8/630-10-2023 00:00:00
Shree SankalpShree ConstructionsS No 95/531-07-2019 00:00:00
Horizon Heights DShreenath EnterprisesS No 4330-07-2018 00:00:00
Kavya ParkShree Construction CompanyS No 29 At Boriwade, Ghodbunder Road, Thane West30-06-2021 00:00:00
Pehla Ghar - Shubh Sanket ComplexLaabh RealtorsThane31-12-2020 00:00:00
Guru AshishShree Gurukrupa Ventures Llp126 Sector 1531-12-2018 00:00:00
Trimity AshwaTrimity Constructions60/531-12-2017 00:00:00
PurushottamnayanGaurav EnterprisesS.No.2330-12-2022 00:00:00
Cosmos Enclave - ChestnutMonarch Developers10 H No 1A30-12-2023 00:00:00
Psk SkylarGururaj Developers118, 113/1630-12-2023 00:00:00
Ace HomesAarti Estates2/22 3/530-12-2022 00:00:00
FalconM/S Ace Constructions27-2, 27-3, 27-830-06-2018 00:00:00
Pristine TowerIdeal DevelopersThane, 40061531-12-2017 00:00:00
Tropical Lagoon - 4 -JacarandaSoham Estates240/2 Pt, 240/3, 240/6, 240/7, 240/9, 240/10 Pt31-05-2018 00:00:00
Mahavir Estella - Wing A And BCityscape Construction CoNew S No 52, Hissa No 131-12-2018 00:00:00
Joy SquareAnant Square2-19, 2-28, 2-3331-12-2019 00:00:00
White HouseLaabh Samruddhi Enterprises9/1 And 9/430-12-2025 00:00:00
ShantaiJanardhan Sakharam BhoirS.No.42 H.No.5A31-12-2019 00:00:00
Trinity HeightsAnil Thakurdas KursijaS No 23/4,23/5,23/730-05-2023 00:00:00
Shivsharda Chs Ltd Phase IiShivshankar Singh &Amp; OthersSanman Singh Marg30-12-2023 00:00:00
Cascade Avenue BellagioAarsh Construction53/6, 54/5 Village Mogharpada & 70/6(Pt) Village Vadavali31-12-2026 00:00:00
Ace CourtyardAce Signature Homes Llp54/231-03-2024 00:00:00
Pine WoodRdc Ventures11/831-12-2017 00:00:00
Mahavir Estella - Wing EM/S. Cityscape Construction CompanyOld S No 40/1,40/2,40/3,40/4,39/5 And New S No 52/1,52/231-01-2021 00:00:00
Kipl MoryaKhade Infrastructre Pvt. Ltd.S.No. 21/12,13,1430-06-2021 00:00:00
Spee Skytower Wing A And BSpee RealtorParel30-03-2024 00:00:00
6 CrystalCrystalstar Housing Developers Private Limited3/29130-12-2025 00:00:00
Sumati HeightsTangent Enterprises489/1030-12-2023 00:00:00
Vardhman Flora Phase -Ii - Vardhman HabitatVardhman Developers LtdGhodapdeo30-06-2024 00:00:00
ShubhadaSugee Twelve Developers LlpF. P. No. 648, C.S.No.3A/33730-09-2024 00:00:00
UnioneSara RealtyPlot No 527 Cts144530-06-2025 00:00:00
Ace ParksideAarti Estates7/5/1, 7/5/2, 7/631-12-2029 00:00:00
Intelligentia Segment By Haware PropertiesSuresh Kashinath HawareSurvey No 47/231-12-2027 00:00:00
Project Details
  • Project:
    Metropolis - Aquaris Phase 1
  • Location:
  • 2/23
  • Const. Stage:
    New
  • Possession:
    30 Sep 2024
Developer Details

  • Developer:
    Anant Square
  • Phone:
  • Address:
  • Green Square
Project RERA Details
MAHA REARA No: P51700022961
Project Type Residential / Group Housing
RERA Project Status New
Architect Ten Folds Architects & Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Sep 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 Sep 2021
Last Retrived 26 Jul 2025
Metropolis - Aquaris Phase 1 QR Code
Metropolis - Aquaris Phase 1
MahaRERA - P51700022961
Apartment Details & Configuration
TypeArea
1 BHK35.67 Sq.mts. ( 384 Sq.ft. )
1 BHK35.75 Sq.mts. ( 385 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Metropolis - Aquaris Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
570.79 Sqmts Ground Rg+232.13 Sqmts Elevated Rg
CCTV in Entrance Lobby100% completed
95% Complete
Will Be Done Before Oc
Community Buildings
Na
DG Back up for Common areas100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 2
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work Will Be Done Before Oc
Energy management100% completed
95% Complete
Solar Water Heating Will Be Done Before Oc
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Will Be Done Before Oc As Per Cfo Noc
Fitness center100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 2
Indoor games100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 2
Kids Play Area100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 2
Landscaping & Tree Planting100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 2
Open Parking
Na
Puzzle Parking Shared with Phase 2100% completed
95% Complete
64 Nos. Mechanical/Puzzle Parking With Elevated Rg
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 2
Solid Waste Management And Disposal
Na
Stack Parkings in Stilt Shared with Phase 2100% completed
95% Complete
Total 63 Nos. Stack Parking. Shared With Phase 2
Storm Water Drains100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 2
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Done Before Oc &Amp; Shared With Phase 2
Water Supply100% completed
95% Complete
Will Be Supplied By Tmc After Oc
Buildings / Wings in Metropolis - Aquaris Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Metropolis - Aquaris Phase 1 by Anant Squarelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5849 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

84 apartments in total
Total
84
Booked
84
Available
0

Saleable Area Statistics (Sq. ft.)

32276 Total
Total
32276
Booked
32276
Available
0
Total 84 apartments in project. 84 apartments booked. 100% apartments booked.
Total 32276 Sq.ft. saleable area. 32276 saleable area booked.
100% area booked.

B1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B1Sep 20238101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.67 Sq.mts. ( 384 Sq.ft. )28
28 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building B1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B2Sep 20238101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.67 Sq.mts. ( 384 Sq.ft. )28
28 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building B2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
CSep 20238101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.75 Sq.mts. ( 385 Sq.ft. )28
28 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Anant Square
for Project
Metropolis - Aquaris Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.