Project overview

METRO HIGHLAND PHASE I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700005374. METRO HIGHLAND PHASE I is located at S No 128/1/B/1. This is a Ongoing being developed by METRO DEVELOPERS.

METRO HIGHLAND PHASE I has 1 BHK, 2 BHK & SHOP Apartments with carpet areas ranging from 108 to 106 Sq.ft. Carpet. The Project has total 84 of which 34 are currently available for sale.

METRO HIGHLAND PHASE I is being developed on a total land area of 64584 Sq.ft. out of which 5640 Sq.ft. i.e 9% is reserved for recreational purposes. METRO HIGHLAND PHASE I has 2 Wings / Towers R4,R5

ProjectDeveloperLocationPossession
Project Details
  • Project:
    METRO HIGHLAND PHASE I
  • Location:
  • S No 128/1/B/1
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2018
Developer Details

  • Developer:
    METRO DEVELOPERS
  • Phone:
  • Address:
  • Geet Gopal Building
Project RERA Details
MAHA REARA No: P51700005374
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Pramod Patil
Funding Bank ABHYUDAYA COOPERATIVE BANK LIMITED
Proposed Possession 30 Jun 2018
Revised Possession 30 Jun 2018
Extended Possession 30 Jun 2019
Litigations No Litigations
Last Modified 15 Feb 2019
Last Retrived 13 Feb 2026
METRO HIGHLAND PHASE I QR Code
METRO HIGHLAND PHASE I
MahaRERA - P51700005374
Apartment Details & Configuration
TypeArea
1 BHK24.38 Sq.mts. ( 262 Sq.ft. )
1RK17.44 Sq.mts. ( 188 Sq.ft. )
2 BHK35.01 Sq.mts. ( 377 Sq.ft. )
2 BHK35.46 Sq.mts. ( 382 Sq.ft. )
2 BHK35.49 Sq.mts. ( 382 Sq.ft. )
2 BHK35.63 Sq.mts. ( 384 Sq.ft. )
1 BHK25.97 Sq.mts. ( 280 Sq.ft. )
1 BHK26.45 Sq.mts. ( 285 Sq.ft. )
1 BHK26.95 Sq.mts. ( 290 Sq.ft. )
1 BHK27.75 Sq.mts. ( 299 Sq.ft. )
1 BHK27.82 Sq.mts. ( 299 Sq.ft. )
2 BHK30.09 Sq.mts. ( 324 Sq.ft. )
2 BHK30.18 Sq.mts. ( 325 Sq.ft. )
SHOP8.03 Sq.mts. ( 86 Sq.ft. )
SHOP8.8 Sq.mts. ( 95 Sq.ft. )
SHOP9.81 Sq.mts. ( 106 Sq.ft. )
SHOP10.04 Sq.mts. ( 108 Sq.ft. )
SHOP10.18 Sq.mts. ( 110 Sq.ft. )
SHOP13.06 Sq.mts. ( 141 Sq.ft. )
SHOP13.2 Sq.mts. ( 142 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of METRO HIGHLAND PHASE Ilast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
In Progress
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room To Be Constructed
Energy management
Solar Energy To Be Provided For Staircase Area
Fire Protection And Fire Safety Requirements
In Progress
Landscaping & Tree Planting
In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Drainage
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
In Progress
Water Supply
At Time Of Completion
Buildings / Wings in METRO HIGHLAND PHASE I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of METRO HIGHLAND PHASE I by METRO DEVELOPERSlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

64584 Sq. ft.

Project Area

5640 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

84 apartments in total
Total
84
Booked
50
Available
34

Saleable Area Statistics (Sq. ft.)

24322 Total
Total
24322
Booked
14847
Available
9475
Total 84 apartments in project. 50 apartments booked. 59% apartments booked.
Total 24322 Sq.ft. saleable area. 14847 saleable area booked.
61% area booked.

R4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R4Jun 20188101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.38 Sq.mts. ( 262 Sq.ft. )15
7 Booked46% Booked
46% Booked
1RK17.44 Sq.mts. ( 188 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK35.01 Sq.mts. ( 377 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK35.46 Sq.mts. ( 382 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK35.49 Sq.mts. ( 382 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK35.63 Sq.mts. ( 384 Sq.ft. )8
3 Booked37% Booked
37% Booked
32 total apartments / 17 apartments booked. 53% apartments booked.
Work Description in Building R4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

R5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R5Jun 20188100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.97 Sq.mts. ( 280 Sq.ft. )14
9 Booked64% Booked
64% Booked
1 BHK26.45 Sq.mts. ( 285 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK26.95 Sq.mts. ( 290 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK27.75 Sq.mts. ( 299 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK27.82 Sq.mts. ( 299 Sq.ft. )14
8 Booked57% Booked
57% Booked
2 BHK30.09 Sq.mts. ( 324 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK30.18 Sq.mts. ( 325 Sq.ft. )7
6 Booked85% Booked
85% Booked
SHOP8.03 Sq.mts. ( 86 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.8 Sq.mts. ( 95 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP9.81 Sq.mts. ( 106 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.04 Sq.mts. ( 108 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.18 Sq.mts. ( 110 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.06 Sq.mts. ( 141 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.2 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
52 total apartments / 33 apartments booked. 63% apartments booked.
Work Description in Building R5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
METRO DEVELOPERS
for Project
METRO HIGHLAND PHASE I
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation