Project overview

Metro Grande Tower C And D is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900004149. Metro Grande Tower C And D is located at Cs No 2 Part And 421 Part Tikka No 2 To 5. This is a Ongoing being developed by West Pioneer Properties India Pvt Ltd.

Metro Grande Tower C And D has 1 BHK L E, 1 BHK L O, 2 BHK L E, 2 BHK L O, 2 BHK M E, 2 BHK M O, 2 BHK S E, 2 BHK S O, 2.5 BHK L E, 2.5 BHK L O, 2.5 BHK M E, 2.5 BHK M O, 2.5 BHK S E, 2.5 BHK S O, 3 BHK PALATIAL E, 3 BHK PALATIAL O & Shop Apartments with carpet areas ranging from 1462 to 1044 Sq.ft. Carpet. The Project has total 414 of which 158 are currently available for sale.

Metro Grande Tower C And D is being developed on a total land area of 96198 Sq.ft. Metro Grande Tower C And D has 2 Wings / Towers Tower C,Tower D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Metro Grande Tower C And D
  • Location:
  • Cs No 2 Part And 421 Part Tikka No 2 To 5
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    West Pioneer Properties India Pvt Ltd
  • Phone:
  • Address:
  • Ashiana
Project RERA Details
MAHA REARA No: P51900004149
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Nirmaan Architects
Funding Bank RBL Bank Limited
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession 30 Jun 2025
Litigations No Litigations
Last Modified 20 Aug 2024
Last Retrived 26 Jul 2025
Metro Grande Tower C And D QR Code
Metro Grande Tower C And D
MahaRERA - P51900004149
Apartment Details & Configuration
TypeArea
1 BHK L E36.25 Sq.mts. ( 390 Sq.ft. )
2 BHK L E70 Sq.mts. ( 753 Sq.ft. )
2 BHK M E66.75 Sq.mts. ( 718 Sq.ft. )
2 BHK S E66.5 Sq.mts. ( 716 Sq.ft. )
2.5 BHK L E83.5 Sq.mts. ( 899 Sq.ft. )
2.5 BHK M E83 Sq.mts. ( 893 Sq.ft. )
2.5 BHK S E79.25 Sq.mts. ( 853 Sq.ft. )
3 BHK PALATIAL E97 Sq.mts. ( 1044 Sq.ft. )
Shop135.79 Sq.mts. ( 1462 Sq.ft. )
Shop175.71 Sq.mts. ( 1891 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Metro Grande Tower C And Dlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
7084 Sq Mt Common Rg For Layout
Club House100% completed
95% Complete
Common For Metro Grande &Amp; Residency
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Common Switching Station For Layout
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc
Landscaping & Tree Planting90% completed
90% Complete
Will Be Done Before Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Common Stp Structure For Metro Grande &Amp; Residency
Solid Waste Management And Disposal
Common Owc For Metro Grande &Amp; Residency
Storm Water Drains100% completed
95% Complete
Will Be Done Before Oc
Street Lighting85% completed
85% Complete
Common For Layout
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Wip
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Done Before Oc
Water Supply80% completed
80% Complete
After Obtaining Oc From Kdmc
Buildings / Wings in Metro Grande Tower C And D
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Metro Grande Tower C And D by West Pioneer Properties India Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

96198 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

414 apartments in total
Total
414
Booked
256
Available
158

Saleable Area Statistics (Sq. ft.)

333549 Total
Total
333549
Booked
199842
Available
133708
Total 414 apartments in project. 256 apartments booked. 61% apartments booked.
Total 333549 Sq.ft. saleable area. 199842 saleable area booked.
60% area booked.

Tower C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower CDec 20232810130193
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK L E36.25 Sq.mts. ( 390 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK L O36.25 Sq.mts. ( 390 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK L E70 Sq.mts. ( 753 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK L O70 Sq.mts. ( 753 Sq.ft. )4
1 Booked25% Booked
25% Booked
2 BHK M E66.75 Sq.mts. ( 718 Sq.ft. )28
23 Booked82% Booked
82% Booked
2 BHK M O66.75 Sq.mts. ( 718 Sq.ft. )28
21 Booked75% Booked
75% Booked
2 BHK S E66.5 Sq.mts. ( 716 Sq.ft. )12
9 Booked75% Booked
75% Booked
2 BHK S O66.75 Sq.mts. ( 718 Sq.ft. )12
8 Booked66% Booked
66% Booked
2.5 BHK L E83.5 Sq.mts. ( 899 Sq.ft. )14
12 Booked85% Booked
85% Booked
2.5 BHK L O83.5 Sq.mts. ( 899 Sq.ft. )14
10 Booked71% Booked
71% Booked
2.5 BHK M E83 Sq.mts. ( 893 Sq.ft. )12
10 Booked83% Booked
83% Booked
2.5 BHK M O83 Sq.mts. ( 893 Sq.ft. )11
4 Booked36% Booked
36% Booked
2.5 BHK S E79.25 Sq.mts. ( 853 Sq.ft. )12
8 Booked66% Booked
66% Booked
2.5 BHK S O79.25 Sq.mts. ( 853 Sq.ft. )12
3 BHK PALATIAL E97 Sq.mts. ( 1044 Sq.ft. )14
13 Booked92% Booked
92% Booked
3 BHK PALATIAL O97 Sq.mts. ( 1044 Sq.ft. )14
11 Booked78% Booked
78% Booked
206 total apartments / 144 apartments booked. 69% apartments booked.
Work Description in Building Tower CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower DDec 20232810130194
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK L E36.25 Sq.mts. ( 390 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK L O36.25 Sq.mts. ( 390 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK L E70 Sq.mts. ( 753 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK L O70 Sq.mts. ( 753 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK M E66.75 Sq.mts. ( 718 Sq.ft. )28
24 Booked85% Booked
85% Booked
2 BHK M O66.75 Sq.mts. ( 718 Sq.ft. )28
17 Booked60% Booked
60% Booked
2 BHK S E66.5 Sq.mts. ( 716 Sq.ft. )12
6 Booked50% Booked
50% Booked
2 BHK S O66.5 Sq.mts. ( 716 Sq.ft. )12
6 Booked50% Booked
50% Booked
2.5 BHK L E83.5 Sq.mts. ( 899 Sq.ft. )14
10 Booked71% Booked
71% Booked
2.5 BHK L O83.5 Sq.mts. ( 899 Sq.ft. )14
6 Booked42% Booked
42% Booked
2.5 BHK M E83 Sq.mts. ( 893 Sq.ft. )12
2.5 BHK M O83 Sq.mts. ( 893 Sq.ft. )11
2.5 BHK S E79.25 Sq.mts. ( 853 Sq.ft. )12
10 Booked83% Booked
83% Booked
2.5 BHK S O79.25 Sq.mts. ( 853 Sq.ft. )12
4 Booked33% Booked
33% Booked
3 BHK PALATIAL E97 Sq.mts. ( 1044 Sq.ft. )14
11 Booked78% Booked
78% Booked
3 BHK PALATIAL O97 Sq.mts. ( 1044 Sq.ft. )14
Shop135.79 Sq.mts. ( 1462 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop175.71 Sq.mts. ( 1891 Sq.ft. )1
None Booked0% Booked
0% Booked
208 total apartments / 112 apartments booked. 53% apartments booked.
Work Description in Building Tower DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress74% done
74% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
West Pioneer Properties India Pvt Ltd
for Project
Metro Grande Tower C And D
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation