Project overview

Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000034708. Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27 is located at Sno195h1p 195H2p 213P 214P 215P 216P 224H1p 224H2p. This is a New being developed by Mayfair Housing.

Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27 has 1 BHK & Shop Apartments with carpet areas ranging from 151 to 389 Sq.ft. Carpet. The Project has total 901 of which 683 are currently available for sale.

Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27 is being developed on a total land area of 149211 Sq.ft. out of which 8331 Sq.ft. i.e 6% is reserved for recreational purposes. Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27 has 6 Wings / Towers Building No 17,Building No 18,Building No 19,Building No 23A,Building No 26,Building No 27

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27
  • Location:
  • Sno195h1p 195H2p 213P 214P 215P 216P 224H1p 224H2p
  • Const. Stage:
    New
  • Possession:
    31 Mar 2027
Developer Details

  • Developer:
    Mayfair Housing
  • Phone:
  • Address:
  • Mayfair Meridian
Project RERA Details
MAHA REARA No: P99000034708
Project Type Residential / Group Housing
RERA Project Status New
Architect Jai
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Mar 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Jun 2025
Last Retrived 28 Jul 2025
Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27 QR Code
Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27
MahaRERA - P99000034708
Apartment Details & Configuration
TypeArea
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )
2 BHK48.55 Sq.mts. ( 523 Sq.ft. )
Shop15.91 Sq.mts. ( 171 Sq.ft. )
Shop16.22 Sq.mts. ( 175 Sq.ft. )
Shop16.44 Sq.mts. ( 177 Sq.ft. )
Shop20.32 Sq.mts. ( 219 Sq.ft. )
Shop20.62 Sq.mts. ( 222 Sq.ft. )
Shop20.83 Sq.mts. ( 224 Sq.ft. )
Shop20.84 Sq.mts. ( 224 Sq.ft. )
2 BHK47.15 Sq.mts. ( 508 Sq.ft. )
Shop11.6 Sq.mts. ( 125 Sq.ft. )
Shop14.3 Sq.mts. ( 154 Sq.ft. )
Shop25 Sq.mts. ( 269 Sq.ft. )
Shop18.85 Sq.mts. ( 203 Sq.ft. )
Shop21.7 Sq.mts. ( 234 Sq.ft. )
Shop22.9 Sq.mts. ( 246 Sq.ft. )
Shop29.24 Sq.mts. ( 315 Sq.ft. )
Shop14 Sq.mts. ( 151 Sq.ft. )
Shop22 Sq.mts. ( 237 Sq.ft. )
Shop25.3 Sq.mts. ( 272 Sq.ft. )
Shop29.9 Sq.mts. ( 322 Sq.ft. )
Shop31.6 Sq.mts. ( 340 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Proposed For Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Proposed
Energy management
Proposed
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Proposed For Layout
Non Tower Area Podium70% completed
70% Complete
Non Tower Area Podium
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Proposed For Layout
Solid Waste Management And Disposal
Proposed For Layout
Storm Water Drains100% completed
95% Complete
Proposed For Layout
Street Lighting
Proposed
Treatment And Disposal Of Sewage And Sullage Water
Proposed For Layout
Water Conservation, Rain water Harvesting100% completed
95% Complete
Proposed
Water Supply10% completed
10% Complete
Supply By Vvcmc After Oc
Buildings / Wings in Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27 by Mayfair Housinglast updated on 28 Jul 2025 as per information obtained from MARA RERA.

149211 Sq. ft.

Project Area

8331 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

901 apartments in total
Total
901
Booked
218
Available
683

Saleable Area Statistics (Sq. ft.)

366054 Total
Total
366054
Booked
90332
Available
275722
Total 901 apartments in project. 218 apartments booked. 24% apartments booked.
Total 366054 Sq.ft. saleable area. 90332 saleable area booked.
25% area booked.

Building No 17

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 17Mar 202722100200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )39
None Booked0% Booked
0% Booked
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )84
None Booked0% Booked
0% Booked
2 BHK48.55 Sq.mts. ( 523 Sq.ft. )42
None Booked0% Booked
0% Booked
Shop15.91 Sq.mts. ( 171 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop16.22 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.44 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.32 Sq.mts. ( 219 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop20.62 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.83 Sq.mts. ( 224 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop20.84 Sq.mts. ( 224 Sq.ft. )1
None Booked0% Booked
0% Booked
177 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 17Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 18

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 18Mar 202722100200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )39
None Booked0% Booked
0% Booked
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )84
None Booked0% Booked
0% Booked
2 BHK48.55 Sq.mts. ( 523 Sq.ft. )42
None Booked0% Booked
0% Booked
Shop15.91 Sq.mts. ( 171 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop16.22 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.44 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.32 Sq.mts. ( 219 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop20.62 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.83 Sq.mts. ( 224 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop20.84 Sq.mts. ( 224 Sq.ft. )1
None Booked0% Booked
0% Booked
177 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 18Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 19

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 19Mar 202722100200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )39
None Booked0% Booked
0% Booked
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )84
None Booked0% Booked
0% Booked
2 BHK48.55 Sq.mts. ( 523 Sq.ft. )42
None Booked0% Booked
0% Booked
Shop15.91 Sq.mts. ( 171 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop16.22 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.44 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.32 Sq.mts. ( 219 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop20.62 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.83 Sq.mts. ( 224 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop20.84 Sq.mts. ( 224 Sq.ft. )1
None Booked0% Booked
0% Booked
177 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 19Completion
Basement (if any)
work-in-progress55% done
55% Booked
Excavation
work-in-progress25% done
25% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress55% done
55% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress53% done
53% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 23A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 23AMar 202722100200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )84
None Booked0% Booked
0% Booked
2 BHK47.15 Sq.mts. ( 508 Sq.ft. )21
None Booked0% Booked
0% Booked
Shop11.6 Sq.mts. ( 125 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.3 Sq.mts. ( 154 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25 Sq.mts. ( 269 Sq.ft. )1
None Booked0% Booked
0% Booked
108 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 23ACompletion
Basement (if any)
work-in-progress95% done
95% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress95% done
95% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress60% done
60% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 26

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 26Mar 202722100200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.9 Sq.mts. ( 386 Sq.ft. )39
32 Booked82% Booked
82% Booked
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )84
62 Booked73% Booked
73% Booked
2 BHK48.55 Sq.mts. ( 523 Sq.ft. )42
42 Booked100% Booked
100% Booked
Shop18.85 Sq.mts. ( 203 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop21.7 Sq.mts. ( 234 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop22.9 Sq.mts. ( 246 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop29.24 Sq.mts. ( 315 Sq.ft. )2
None Booked0% Booked
0% Booked
173 total apartments / 136 apartments booked. 78% apartments booked.
Work Description in Building Building No 26Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress65% done
65% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 27

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 27Mar 202722100200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.14 Sq.mts. ( 389 Sq.ft. )84
82 Booked97% Booked
97% Booked
Shop14 Sq.mts. ( 151 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22 Sq.mts. ( 237 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.3 Sq.mts. ( 272 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.9 Sq.mts. ( 322 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop31.6 Sq.mts. ( 340 Sq.ft. )1
None Booked0% Booked
0% Booked
89 total apartments / 82 apartments booked. 92% apartments booked.
Work Description in Building Building No 27Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mayfair Housing
for Project
Mayfair Virar Gardens Building No 17, 18, 19, 23A, 26, 27
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation