Project overview

Maximus is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700045811. Maximus is located at C.T.S.No 1826,2278. This is a New being developed by Guruvidha Enterprises.

Maximus has 1 BHK Apartments with carpet areas ranging from 331 to 490 Sq.ft. Carpet. The Project has total 18 of which 18 are currently available for sale.

Maximus is being developed on a total land area of 6157 Sq.ft. Maximus has 1 Wings / Towers Maximus A And B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Maximus
  • Location:
  • C.T.S.No 1826,2278
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Guruvidha Enterprises
  • Phone:
  • Address:
  • Durga Residency
Project RERA Details
MAHA REARA No: P51700045811
Project Type Residential / Group Housing
RERA Project Status New
Architect Apex Consultancy
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Jun 2022
Last Retrived 26 Jul 2025
Maximus QR Code
Maximus
MahaRERA - P51700045811
Apartment Details & Configuration
TypeArea
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )
1 BHK35.41 Sq.mts. ( 381 Sq.ft. )
1 BHK35.49 Sq.mts. ( 382 Sq.ft. )
1 BHK37.96 Sq.mts. ( 409 Sq.ft. )
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )
1 BHK45.53 Sq.mts. ( 490 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Maximuslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Wip
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Maximus
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Maximus by Guruvidha Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6157 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

18 apartments in total
Total
18
Booked
0
Available
18

Saleable Area Statistics (Sq. ft.)

7753 Total
Total
7753
Booked
0
Available
7753
Total 18 apartments in project. 0 apartments booked. 0% apartments booked.
Total 7753 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Maximus A And B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Maximus A And B WingDec 202551110151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.78 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35.41 Sq.mts. ( 381 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.49 Sq.mts. ( 382 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK37.96 Sq.mts. ( 409 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK45.53 Sq.mts. ( 490 Sq.ft. )4
None Booked0% Booked
0% Booked
18 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Maximus A And B WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Guruvidha Enterprises
for Project
Maximus
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation