Project overview

Matruchhaya Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000016587. Matruchhaya Heights is located at 401501. This is a New Project being developed by Matruchhaya Developers.

Matruchhaya Heights has RESIDENTIAL & SHOP Apartments with carpet areas ranging from 180 to 440 Sq.ft. Carpet. The Project has total 142 of which 126 are currently available for sale.

Matruchhaya Heights is being developed on a total land area of 70082 Sq.ft. Matruchhaya Heights has 7 Wings / Towers A Wing,B Wing,C Wing,D Wing,E Wing,F Wing,G Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Matruchhaya Heights
  • Location:
  • 401501
  • Const. Stage:
    New Project
  • Possession:
    30 May 2023
Developer Details

  • Developer:
    Matruchhaya Developers
  • Phone:
  • Address:
  • Office No 1,2,3 And 4, Building No 14, Pamtembhi, Boisar, Next To Midc Navapur Road, 401501
Project RERA Details
MAHA REARA No: P99000016587
Project Type Others
RERA Project Status New Project
Funding Bank GREATER BANK
Proposed Possession 30 May 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 May 2023
Last Retrived 28 Jul 2025
Matruchhaya Heights QR Code
Matruchhaya Heights
MahaRERA - P99000016587
Apartment Details & Configuration
TypeArea
RESIDENTIAL28.03 Sq.mts. ( 302 Sq.ft. )
RESIDENTIAL28.04 Sq.mts. ( 302 Sq.ft. )
RESIDENTIAL35.75 Sq.mts. ( 385 Sq.ft. )
SHOP7.02 Sq.mts. ( 76 Sq.ft. )
SHOP8.31 Sq.mts. ( 89 Sq.ft. )
SHOP10.6 Sq.mts. ( 114 Sq.ft. )
SHOP16.07 Sq.mts. ( 173 Sq.ft. )
RESIDENTIAL28.01 Sq.mts. ( 301 Sq.ft. )
RESIDENTIAL32.06 Sq.mts. ( 345 Sq.ft. )
RESIDENTIAL32.08 Sq.mts. ( 345 Sq.ft. )
RESIDENTIAL40.86 Sq.mts. ( 440 Sq.ft. )
SHOP9.56 Sq.mts. ( 103 Sq.ft. )
SHOP10.98 Sq.mts. ( 118 Sq.ft. )
SHOP12.22 Sq.mts. ( 132 Sq.ft. )
SHOP13.63 Sq.mts. ( 147 Sq.ft. )
SHOP14.04 Sq.mts. ( 151 Sq.ft. )
SHOP24.25 Sq.mts. ( 261 Sq.ft. )
RESIDENTIAL39.8 Sq.mts. ( 428 Sq.ft. )
RESIDENTIAL46.94 Sq.mts. ( 505 Sq.ft. )
SHOP40.16 Sq.mts. ( 432 Sq.ft. )
SHOP16.75 Sq.mts. ( 180 Sq.ft. )
SHOP18.16 Sq.mts. ( 195 Sq.ft. )
SHOP21.45 Sq.mts. ( 231 Sq.ft. )
SHOP22.87 Sq.mts. ( 246 Sq.ft. )
SHOP23.28 Sq.mts. ( 251 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Matruchhaya Heightslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Be Provided
Energy management
Yet To Be Provided
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Sewerage To Be Provided
Solid Waste Management And Disposal
Yet To Be Provided
Storm Water Drains
Storm Water Drains To Be Provided
Street Lighting10% completed
10% Complete
Work In Process
Treatment And Disposal Of Sewage And Sullage Water
Yet To Be Provided
Water Conservation, Rain water Harvesting
Rain Water Harvesting To Be Provided
Water Supply100% completed
95% Complete
Borewell Has Been Provided
Buildings / Wings in Matruchhaya Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Matruchhaya Heights by Matruchhaya Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

70082 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

142 apartments in total
Total
142
Booked
16
Available
126

Saleable Area Statistics (Sq. ft.)

41991 Total
Total
41991
Booked
5244
Available
36747
Total 142 apartments in project. 16 apartments booked. 11% apartments booked.
Total 41991 Sq.ft. saleable area. 5244 saleable area booked.
12% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMay 20204100024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL28.03 Sq.mts. ( 302 Sq.ft. )3
2 Booked66% Booked
66% Booked
RESIDENTIAL28.04 Sq.mts. ( 302 Sq.ft. )6
RESIDENTIAL35.75 Sq.mts. ( 385 Sq.ft. )3
2 Booked66% Booked
66% Booked
SHOP7.02 Sq.mts. ( 76 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP8.31 Sq.mts. ( 89 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP10.6 Sq.mts. ( 114 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP16.07 Sq.mts. ( 173 Sq.ft. )2
None Booked0% Booked
0% Booked
19 total apartments / 5 apartments booked. 26% apartments booked.
Work Description in Building A WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMay 20204100042
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL28.03 Sq.mts. ( 302 Sq.ft. )3
2 Booked66% Booked
66% Booked
RESIDENTIAL28.04 Sq.mts. ( 302 Sq.ft. )6
5 Booked83% Booked
83% Booked
RESIDENTIAL35.75 Sq.mts. ( 385 Sq.ft. )3
2 Booked66% Booked
66% Booked
SHOP7.02 Sq.mts. ( 76 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP8.31 Sq.mts. ( 89 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP10.6 Sq.mts. ( 114 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP16.07 Sq.mts. ( 173 Sq.ft. )2
None Booked0% Booked
0% Booked
19 total apartments / 9 apartments booked. 47% apartments booked.
Work Description in Building B WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMay 20224100024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL28.01 Sq.mts. ( 301 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL28.03 Sq.mts. ( 302 Sq.ft. )12
None Booked0% Booked
0% Booked
RESIDENTIAL32.06 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL32.08 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL40.86 Sq.mts. ( 440 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP9.56 Sq.mts. ( 103 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.98 Sq.mts. ( 118 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.22 Sq.mts. ( 132 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.63 Sq.mts. ( 147 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.04 Sq.mts. ( 151 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP24.25 Sq.mts. ( 261 Sq.ft. )1
None Booked0% Booked
0% Booked
27 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMay 20224100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL28.03 Sq.mts. ( 302 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL28.04 Sq.mts. ( 302 Sq.ft. )6
None Booked0% Booked
0% Booked
RESIDENTIAL32.08 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL35.75 Sq.mts. ( 385 Sq.ft. )3
1 Booked33% Booked
33% Booked
RESIDENTIAL39.8 Sq.mts. ( 428 Sq.ft. )1
None Booked0% Booked
0% Booked
14 total apartments / 1 apartments booked. 7% apartments booked.
Work Description in Building D WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingMay 20224100024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL28.01 Sq.mts. ( 301 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL28.03 Sq.mts. ( 302 Sq.ft. )12
None Booked0% Booked
0% Booked
RESIDENTIAL32.06 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL32.08 Sq.mts. ( 345 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL40.86 Sq.mts. ( 440 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL46.94 Sq.mts. ( 505 Sq.ft. )1
None Booked0% Booked
0% Booked
22 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingMay 20224100024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL28.03 Sq.mts. ( 302 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL28.04 Sq.mts. ( 302 Sq.ft. )6
None Booked0% Booked
0% Booked
RESIDENTIAL32.08 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL35.75 Sq.mts. ( 385 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL39.8 Sq.mts. ( 428 Sq.ft. )1
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G WingMay 20224100024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL28.01 Sq.mts. ( 301 Sq.ft. )3
None Booked0% Booked
0% Booked
RESIDENTIAL28.03 Sq.mts. ( 302 Sq.ft. )12
RESIDENTIAL32.06 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL32.08 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL40.86 Sq.mts. ( 440 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP40.16 Sq.mts. ( 432 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.75 Sq.mts. ( 180 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.16 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP21.45 Sq.mts. ( 231 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.87 Sq.mts. ( 246 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP23.28 Sq.mts. ( 251 Sq.ft. )2
None Booked0% Booked
0% Booked
27 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building G WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress75% done
75% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked
Channel Partners
Channel Partners Registered by Developer
Matruchhaya Developers
for Project
Matruchhaya Heights
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation