Project overview

Marquis Residences Phase 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800051092. Marquis Residences Phase 2 is located at 1406/10. This is a New being developed by Embassy Enterprises.

Marquis Residences Phase 2 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 430 to 630 Sq.ft. Carpet. The Project has total 186 of which 167 are currently available for sale.

Marquis Residences Phase 2 is being developed on a total land area of 38707 Sq.ft. Marquis Residences Phase 2 has 2 Wings / Towers Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Marquis Residences Phase 2
  • Location:
  • 1406/10
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    Embassy Enterprises
  • Phone:
  • Address:
  • Marquis Residences
Project RERA Details
MAHA REARA No: P51800051092
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank CENTRAL BANK OF INDIA
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 May 2025
Last Retrived 26 Jul 2025
Marquis Residences Phase 2 QR Code
Marquis Residences Phase 2
MahaRERA - P51800051092
Apartment Details & Configuration
TypeArea
1 BHK39.98 Sq.mts. ( 430 Sq.ft. )
1 BHK41.29 Sq.mts. ( 444 Sq.ft. )
2 BHK57.27 Sq.mts. ( 616 Sq.ft. )
2 BHK58.51 Sq.mts. ( 630 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Marquis Residences Phase 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Yet Started
Energy management
Not Yet Started
Fire Protection And Fire Safety Requirements
Not Yet Started
Landscaping & Tree Planting
Not Yet Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Started
Solid Waste Management And Disposal
Not Yet Started
Storm Water Drains
Not Yet Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Not Yet Started
Water Conservation, Rain water Harvesting
Not Yet Started
Water Supply
Not Yet Started
Buildings / Wings in Marquis Residences Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Marquis Residences Phase 2 by Embassy Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

38707 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

186 apartments in total
Total
186
Booked
19
Available
167

Saleable Area Statistics (Sq. ft.)

102783 Total
Total
102783
Booked
11568
Available
91215
Total 186 apartments in project. 19 apartments booked. 10% apartments booked.
Total 102783 Sq.ft. saleable area. 11568 saleable area booked.
11% area booked.

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 2028191113094
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.98 Sq.mts. ( 430 Sq.ft. )18
None Booked0% Booked
0% Booked
1 BHK41.29 Sq.mts. ( 444 Sq.ft. )18
2 BHK57.27 Sq.mts. ( 616 Sq.ft. )19
2 BHK58.51 Sq.mts. ( 630 Sq.ft. )38
93 total apartments / 8 apartments booked. 8% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress52% done
52% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 2028191113093
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.98 Sq.mts. ( 430 Sq.ft. )18
1 BHK41.29 Sq.mts. ( 444 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK57.27 Sq.mts. ( 616 Sq.ft. )19
None Booked0% Booked
0% Booked
2 BHK58.51 Sq.mts. ( 630 Sq.ft. )38
10 Booked26% Booked
26% Booked
93 total apartments / 11 apartments booked. 11% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress42% done
42% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
work-in-progress95% done
95% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Embassy Enterprises
for Project
Marquis Residences Phase 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation