Project overview

Marina is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900011605. Marina is located at F1257a F1258 F1261 F1262 F1263 F1264 F1265 F1266 F1267. This is a Ongoing being developed by Keyhomes Realtors Private Limited.

Marina has 1RK Apartments with carpet areas ranging from 222 to 233 Sq.ft. Carpet. The Project has total 62 of which 2 are currently available for sale.

Marina is being developed on a total land area of 15247 Sq.ft. out of which 2128 Sq.ft. i.e 14% is reserved for recreational purposes. Marina has 2 Wings / Towers Marina Wing A,Marina Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Marina
  • Location:
  • F1257a F1258 F1261 F1262 F1263 F1264 F1265 F1266 F1267
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Keyhomes Realtors Private Limited
  • Phone:
  • Address:
  • Laiba Court
Project RERA Details
MAHA REARA No: P51900011605
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank UNION BANK OF INDIA
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession 29 Dec 2024
Litigations No Litigations
Last Modified 29 Sep 2022
Last Retrived 26 Jul 2025
Marina QR Code
Marina
MahaRERA - P51900011605
Apartment Details & Configuration
TypeArea
1 BHK31.87 Sq.mts. ( 343 Sq.ft. )
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )
1 BHK33.76 Sq.mts. ( 363 Sq.ft. )
1 BHK35.1 Sq.mts. ( 378 Sq.ft. )
1 BHK35.16 Sq.mts. ( 378 Sq.ft. )
1 BHK35.3 Sq.mts. ( 380 Sq.ft. )
1RK24.9 Sq.mts. ( 268 Sq.ft. )
2 BHK41.54 Sq.mts. ( 447 Sq.ft. )
2 BHK45.98 Sq.mts. ( 495 Sq.ft. )
2 BHK48.54 Sq.mts. ( 522 Sq.ft. )
2 BHK51.46 Sq.mts. ( 554 Sq.ft. )
2 BHK56.5 Sq.mts. ( 608 Sq.ft. )
2 BHK59.88 Sq.mts. ( 645 Sq.ft. )
3 BHK60.35 Sq.mts. ( 650 Sq.ft. )
3 BHK62.78 Sq.mts. ( 676 Sq.ft. )
3 BHK67.39 Sq.mts. ( 725 Sq.ft. )
3 BHK67.97 Sq.mts. ( 732 Sq.ft. )
3 BHK68.82 Sq.mts. ( 741 Sq.ft. )
3 BHK70.33 Sq.mts. ( 757 Sq.ft. )
3 BHK71.13 Sq.mts. ( 766 Sq.ft. )
3 BHK71.19 Sq.mts. ( 766 Sq.ft. )
3 BHK77.55 Sq.mts. ( 835 Sq.ft. )
1RK20.64 Sq.mts. ( 222 Sq.ft. )
1RK21.61 Sq.mts. ( 233 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Marinalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Paved R.G. Of Area 197.71 Sq. Mtrs
Community Buildings100% completed
95% Complete
Completed
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements75% completed
75% Complete
Completion Of B Wing To Be Obtained From Authority
Landscaping & Tree Planting
Na
Open Parking
3 X 4 Levels Stack Parking On Open Spaces
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal80% completed
80% Complete
As Per Approved Plan
Storm Water Drains80% completed
80% Complete
Work In Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting80% completed
80% Complete
As Per Approved Plan
Water Supply90% completed
90% Complete
As Per Approved Plan
Buildings / Wings in Marina
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Marina by Keyhomes Realtors Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

15247 Sq. ft.

Project Area

2128 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

62 apartments in total
Total
62
Booked
60
Available
2

Saleable Area Statistics (Sq. ft.)

33814 Total
Total
33814
Booked
33203
Available
611
Total 62 apartments in project. 60 apartments booked. 96% apartments booked.
Total 33814 Sq.ft. saleable area. 33203 saleable area booked.
98% area booked.

Marina Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Marina Wing AJun 2023201010034
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.87 Sq.mts. ( 343 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK33.76 Sq.mts. ( 363 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK35.1 Sq.mts. ( 378 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK35.16 Sq.mts. ( 378 Sq.ft. )9
8 Booked88% Booked
88% Booked
1 BHK35.3 Sq.mts. ( 380 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK24.9 Sq.mts. ( 268 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK41.54 Sq.mts. ( 447 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK45.98 Sq.mts. ( 495 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK48.54 Sq.mts. ( 522 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.46 Sq.mts. ( 554 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK56.5 Sq.mts. ( 608 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK59.88 Sq.mts. ( 645 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK60.35 Sq.mts. ( 650 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK62.78 Sq.mts. ( 676 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK67.39 Sq.mts. ( 725 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK67.97 Sq.mts. ( 732 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK68.82 Sq.mts. ( 741 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK70.33 Sq.mts. ( 757 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK71.13 Sq.mts. ( 766 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK71.19 Sq.mts. ( 766 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK77.55 Sq.mts. ( 835 Sq.ft. )13
13 Booked100% Booked
100% Booked
51 total apartments / 50 apartments booked. 98% apartments booked.
Work Description in Building Marina Wing ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Marina Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Marina Wing BJun 202310101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK20.64 Sq.mts. ( 222 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK21.61 Sq.mts. ( 233 Sq.ft. )7
6 Booked85% Booked
85% Booked
11 total apartments / 10 apartments booked. 90% apartments booked.
Work Description in Building Marina Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress85% done
85% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Keyhomes Realtors Private Limited
for Project
Marina
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation