Project overview

Maple Greens is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000013794. Maple Greens is located at Sur No 84, H No 03. This is a Ongoing being developed by The Silwant.

Maple Greens has 1 BHK & 1RK Apartments with carpet areas ranging from 177 to 281 Sq.ft. Carpet. The Project has total 191 of which 89 are currently available for sale.

Maple Greens is being developed on a total land area of 77339 Sq.ft. Maple Greens has 5 Wings / Towers Wing A,Wing B,Wing C,Wing O And P,Wing Q

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Maple Greens
  • Location:
  • Sur No 84, H No 03
  • Const. Stage:
    Ongoing
  • Possession:
    30 Mar 2021
Developer Details

  • Developer:
    The Silwant
  • Phone:
  • Address:
  • Maple Greens
Project RERA Details
MAHA REARA No: P52000013794
Project Type Others
RERA Project Status Ongoing
Architect Destination Architecture
Funding Bank UNION BANK OF INDIA
Proposed Possession 30 Mar 2021
Revised Possession 30 Mar 2021
Extended Possession 31 Oct 2023
Litigations No Litigations
Last Modified 24 Jul 2023
Last Retrived 28 Jul 2025
Maple Greens QR Code
Maple Greens
MahaRERA - P52000013794
Apartment Details & Configuration
TypeArea
1 BHK26.24 Sq.mts. ( 282 Sq.ft. )
1 BHK26.33 Sq.mts. ( 283 Sq.ft. )
1 BHK27.4 Sq.mts. ( 295 Sq.ft. )
1 BHK18.2 Sq.mts. ( 196 Sq.ft. )
2 BHK38.45 Sq.mts. ( 414 Sq.ft. )
SHOP18.48 Sq.mts. ( 199 Sq.ft. )
SHOP19.11 Sq.mts. ( 206 Sq.ft. )
SHOP20.9 Sq.mts. ( 225 Sq.ft. )
SHOP14.59 Sq.mts. ( 157 Sq.ft. )
SHOP15.96 Sq.mts. ( 172 Sq.ft. )
1 BHK25.98 Sq.mts. ( 280 Sq.ft. )
1 BHK26.19 Sq.mts. ( 282 Sq.ft. )
1 BHK27.55 Sq.mts. ( 297 Sq.ft. )
1 BHK28.04 Sq.mts. ( 302 Sq.ft. )
2 BHK35.84 Sq.mts. ( 386 Sq.ft. )
2 BHK36.75 Sq.mts. ( 396 Sq.ft. )
SHOP26.26 Sq.mts. ( 283 Sq.ft. )
SHOP26.71 Sq.mts. ( 288 Sq.ft. )
SHOP14.3 Sq.mts. ( 154 Sq.ft. )
SHOP14.8 Sq.mts. ( 159 Sq.ft. )
SHOP19.38 Sq.mts. ( 209 Sq.ft. )
SHOP21.5 Sq.mts. ( 231 Sq.ft. )
1 BHK23.81 Sq.mts. ( 256 Sq.ft. )
1 BHK24.71 Sq.mts. ( 266 Sq.ft. )
1 BHK26.52 Sq.mts. ( 285 Sq.ft. )
2 BHK33.82 Sq.mts. ( 364 Sq.ft. )
1 BHK23.69 Sq.mts. ( 255 Sq.ft. )
1 BHK25.8 Sq.mts. ( 278 Sq.ft. )
1 BHK26.25 Sq.mts. ( 283 Sq.ft. )
1RK25.87 Sq.mts. ( 278 Sq.ft. )
1RK16.45 Sq.mts. ( 177 Sq.ft. )
1RK17.62 Sq.mts. ( 190 Sq.ft. )
1RK17.68 Sq.mts. ( 190 Sq.ft. )
1RK18.03 Sq.mts. ( 194 Sq.ft. )
1RK18.04 Sq.mts. ( 194 Sq.ft. )
1RK18.13 Sq.mts. ( 195 Sq.ft. )
1RK18.85 Sq.mts. ( 203 Sq.ft. )
1RK19 Sq.mts. ( 205 Sq.ft. )
1RK19.39 Sq.mts. ( 209 Sq.ft. )
1RK19.71 Sq.mts. ( 212 Sq.ft. )
1RK20.64 Sq.mts. ( 222 Sq.ft. )
1RK20.79 Sq.mts. ( 224 Sq.ft. )
1RK21.86 Sq.mts. ( 235 Sq.ft. )
1 BHK23.42 Sq.mts. ( 252 Sq.ft. )
1 BHK23.68 Sq.mts. ( 255 Sq.ft. )
1RK26.11 Sq.mts. ( 281 Sq.ft. )
1RK17.91 Sq.mts. ( 193 Sq.ft. )
1RK19.03 Sq.mts. ( 205 Sq.ft. )
1RK19.13 Sq.mts. ( 206 Sq.ft. )
1RK19.58 Sq.mts. ( 211 Sq.ft. )
1RK20.03 Sq.mts. ( 216 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Maple Greenslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Will Be Provided By Panchayat
Water Conservation, Rain water Harvesting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Yet To Be Started
Storm Water Drains
Work Not Yet Started
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Open Parking
Will Provide
Landscaping & Tree Planting
Will Be Done In Future
Fire Protection And Fire Safety Requirements
Na
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Be Started
Community Buildings
Yet To Be Started
Aggregate area of recreational Open Space
Yet To Develop
Buildings / Wings in Maple Greens
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Maple Greens by The Silwantlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

77339 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

191 apartments in total
Total
191
Booked
102
Available
89

Saleable Area Statistics (Sq. ft.)

47474 Total
Total
47474
Booked
26180
Available
21294
Total 191 apartments in project. 102 apartments booked. 53% apartments booked.
Total 47474 Sq.ft. saleable area. 26180 saleable area booked.
55% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ASep 20205101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.24 Sq.mts. ( 282 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK26.33 Sq.mts. ( 283 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK27.4 Sq.mts. ( 295 Sq.ft. )8
5 Booked62% Booked
62% Booked
1 BHK18.2 Sq.mts. ( 196 Sq.ft. )8
5 Booked62% Booked
62% Booked
2 BHK38.45 Sq.mts. ( 414 Sq.ft. )8
6 Booked75% Booked
75% Booked
SHOP18.48 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.11 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.9 Sq.mts. ( 225 Sq.ft. )4
1 Booked25% Booked
25% Booked
SHOP14.59 Sq.mts. ( 157 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.96 Sq.mts. ( 172 Sq.ft. )1
1 Booked100% Booked
100% Booked
40 total apartments / 22 apartments booked. 55% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BSep 20205101021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.98 Sq.mts. ( 280 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.19 Sq.mts. ( 282 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK27.55 Sq.mts. ( 297 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK28.04 Sq.mts. ( 302 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK35.84 Sq.mts. ( 386 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK36.75 Sq.mts. ( 396 Sq.ft. )4
3 Booked75% Booked
75% Booked
SHOP26.26 Sq.mts. ( 283 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP26.71 Sq.mts. ( 288 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.3 Sq.mts. ( 154 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP14.8 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.96 Sq.mts. ( 172 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.38 Sq.mts. ( 209 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.9 Sq.mts. ( 225 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP21.5 Sq.mts. ( 231 Sq.ft. )1
None Booked0% Booked
0% Booked
34 total apartments / 16 apartments booked. 47% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CSep 20205101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.81 Sq.mts. ( 256 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK24.71 Sq.mts. ( 266 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK26.52 Sq.mts. ( 285 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK33.82 Sq.mts. ( 364 Sq.ft. )4
4 Booked100% Booked
100% Booked
16 total apartments / 11 apartments booked. 68% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing O And P

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing O And PSep 20205101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.69 Sq.mts. ( 255 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK25.8 Sq.mts. ( 278 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK26.25 Sq.mts. ( 283 Sq.ft. )4
1 Booked25% Booked
25% Booked
1RK25.87 Sq.mts. ( 278 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK16.45 Sq.mts. ( 177 Sq.ft. )4
2 Booked50% Booked
50% Booked
1RK17.62 Sq.mts. ( 190 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RK17.68 Sq.mts. ( 190 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK18.03 Sq.mts. ( 194 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RK18.04 Sq.mts. ( 194 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RK18.13 Sq.mts. ( 195 Sq.ft. )4
1 Booked25% Booked
25% Booked
1RK18.85 Sq.mts. ( 203 Sq.ft. )4
2 Booked50% Booked
50% Booked
1RK19 Sq.mts. ( 205 Sq.ft. )4
2 Booked50% Booked
50% Booked
1RK19.39 Sq.mts. ( 209 Sq.ft. )4
2 Booked50% Booked
50% Booked
1RK19.71 Sq.mts. ( 212 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK20.64 Sq.mts. ( 222 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK20.79 Sq.mts. ( 224 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK21.86 Sq.mts. ( 235 Sq.ft. )2
2 Booked100% Booked
100% Booked
56 total apartments / 28 apartments booked. 50% apartments booked.
Work Description in Building Wing O And PCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing Q

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing QSep 20205101071
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.42 Sq.mts. ( 252 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK23.68 Sq.mts. ( 255 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK26.11 Sq.mts. ( 281 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK16.45 Sq.mts. ( 177 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK17.91 Sq.mts. ( 193 Sq.ft. )8
6 Booked75% Booked
75% Booked
1RK18.04 Sq.mts. ( 194 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RK19.03 Sq.mts. ( 205 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK19.13 Sq.mts. ( 206 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK19.58 Sq.mts. ( 211 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK19.71 Sq.mts. ( 212 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK20.03 Sq.mts. ( 216 Sq.ft. )4
2 Booked50% Booked
50% Booked
1RK20.79 Sq.mts. ( 224 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK21.86 Sq.mts. ( 235 Sq.ft. )2
2 Booked100% Booked
100% Booked
45 total apartments / 25 apartments booked. 55% apartments booked.
Work Description in Building Wing QCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
The Silwant
for Project
Maple Greens
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation