Project overview
Maple Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700054381. Maple Enclave is located at Thane. This is a New Project being developed by Mandar Construction And Developers.
Maple Enclave has 1 BHK, 2 BHK, 3 BHK & Shop Apartments with carpet areas ranging from 116 to 96 Sq.ft. Carpet. The Project has total 96 of which 96 are currently available for sale.
Maple Enclave is being developed on a total land area of 23788 Sq.ft. Maple Enclave has 1 Wings / Towers Maple Enclave
| Project | Developer | Location | Possession |
-
Project:
Maple Enclave
-
Location:
-
Thane
-
Const. Stage:
New Project
-
Possession:
31 Mar 2026
-
Developer:
Mandar Construction And Developers
-
Phone:
-
Address:
-
Ground Floor, Jagruti, Old Mumbai Pune Road, Kalwa, Kalwa, 400605
| MAHA REARA No: |
P51700054381 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Architect |
Joshi Deshaware &Amp; Associates |
| Funding Bank |
TJSB SAHKARI BANK LTD |
| Proposed Possession |
31 Mar 2026 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
11 Jan 2024 |
| Last Retrived |
28 Jul 2025 |
Maple Enclave QR Code
Maple Enclave
MahaRERA - P51700054381
| Type | Area |
| 1 BHK | 31.35 Sq.mts. ( 337 Sq.ft. ) |
| 1 BHK | 31.65 Sq.mts. ( 341 Sq.ft. ) |
| 2 BHK | 50 Sq.mts. ( 538 Sq.ft. ) |
| 2 BHK | 50.63 Sq.mts. ( 545 Sq.ft. ) |
| Shop | 6.09 Sq.mts. ( 66 Sq.ft. ) |
| Shop | 7.38 Sq.mts. ( 79 Sq.ft. ) |
| Shop | 8.92 Sq.mts. ( 96 Sq.ft. ) |
| Shop | 10.81 Sq.mts. ( 116 Sq.ft. ) |
| Shop | 12.32 Sq.mts. ( 133 Sq.ft. ) |
| Shop | 13.35 Sq.mts. ( 144 Sq.ft. ) |
| Shop | 13.44 Sq.mts. ( 145 Sq.ft. ) |
| Shop | 14.93 Sq.mts. ( 161 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Maple Enclavelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Vl Be Completed Before Oc |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Vl Be Completed Before Oc |
Landscaping & Tree Planting
|
|
Na |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Vl Be Completed Before Oc |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Vl Be Completed Before Oc |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Vl Be Completed Before Oc |
|
|
|
Vl Be Completed Before Oc |
Buildings / Wings in Maple Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Maple Enclave by Mandar Construction And Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
96
apartments in total
Saleable Area Statistics (Sq. ft.)
35799
Total
Total 96 apartments in project. 0 apartments booked. 0% apartments booked.
Total 35799 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Maple Enclave | Mar 2026 | 23 | 1 | 0 | 1 | 1 | 52 | 56 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31.35 Sq.mts. ( 337 Sq.ft. ) | 23 | |
| 1 BHK | 31.65 Sq.mts. ( 341 Sq.ft. ) | 38 | |
| 2 BHK | 50 Sq.mts. ( 538 Sq.ft. ) | 22 | |
| 2 BHK | 50.63 Sq.mts. ( 545 Sq.ft. ) | 3 | |
| 3 BHK | 50.63 Sq.mts. ( 545 Sq.ft. ) | 1 | |
| Shop | 6.09 Sq.mts. ( 66 Sq.ft. ) | 1 | |
| Shop | 7.38 Sq.mts. ( 79 Sq.ft. ) | 1 | |
| Shop | 8.92 Sq.mts. ( 96 Sq.ft. ) | 1 | |
| Shop | 10.81 Sq.mts. ( 116 Sq.ft. ) | 1 | |
| Shop | 12.32 Sq.mts. ( 133 Sq.ft. ) | 2 | |
| Shop | 13.35 Sq.mts. ( 144 Sq.ft. ) | 1 | |
| Shop | 13.44 Sq.mts. ( 145 Sq.ft. ) | 1 | |
| Shop | 14.93 Sq.mts. ( 161 Sq.ft. ) | 1 | |
96 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Maple Enclave | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Mandar Construction And Developers
for Project
Maple Enclave
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |