Project overview

Maple City Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700009222. Maple City Phase I is located at S No 141 S No143 H No 4A S No 144 H No 1A And 2. This is a Ongoing being developed by Shree Chintamani Enterprises.

Maple City Phase I has 1 BHK Apartments with carpet areas ranging from 303 to 353 Sq.ft. Carpet. The Project has total 403 of which 107 are currently available for sale.

Maple City Phase I is being developed on a total land area of 183419 Sq.ft. out of which 15907 Sq.ft. i.e 9% is reserved for recreational purposes. Maple City Phase I has 6 Wings / Towers Maple City Building 2,Maple City Building 3,Maple City Building 4,Maple City Building 5,Maple City Building 6,Maple City Building 7

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
Samarth VatikaShree Samarth Associates122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
Tulsi AahanRaj GroupS. No.39 , H No. 1,2,331-12-2019 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersSurvey No. 173 Hissa No. 331-12-2019 00:00:00
Shubh VatikaShubh Enterprises7A, H No 230-11-2018 00:00:00
BhagatiniwasShri Sadguru ConstructionSurvey No 42 P30-12-2018 00:00:00
Ravindranath Tagore NiketanSai City DevelopersSurvey No 45 Hissa No 4 Plot No 630-12-2020 00:00:00
Jadhav MarketS J Construction CoS No 48 Hissa No 11P And Hissa No 14 And Hissa No 15P20-12-2021 00:00:00
Aruna UlhasGaondevi Developers49/10/3,431-08-2018 00:00:00
ShulpaniShree Balaji Builders & DevelopersS No 53 H No 1531-08-2018 00:00:00
Swanand Treo Building No 3 -Swami GannayakSwanand HeightsSurvey No 13, Hissa No 231-12-2017 00:00:00
Ekdanta ApartmemtEashanya Builder And Developers421503, Thane31-12-2019 00:00:00
Sai Aangan - C WingShree Sai Chatra DevelopersS No 87 H No 5 P No 1 S No 87 H No 12 And 1331-12-2018 00:00:00
Apte HomesShree Siddhi DevelopersSurvey No-44, Hissa No-1/A/331-12-2018 00:00:00
Pranjee Garden City Phase -IiPranjee Properties Pvt. LtdPlot No 330-11-2018 00:00:00
Sonal Co-Op Housing SocietySoham Developers4918231-01-2019 00:00:00
Sai ShrutiPinnacle ConstructionsSurveyno 331-03-2018 00:00:00
Rubyana Residency Phase 1Sudhir Damodar GhatnekarSurvey No. 8930-06-2018 00:00:00
Vedant Imperial Abc Phase 1Mohan Hardasmal TharwaniS No 56/3 57/1P 57/330-11-2019 00:00:00
Ekdant SmaranPrashant Tukaram BaeetSurvey No. 41, H.No. 1, Plot No. 116-03-2021 00:00:00
Shivam GreensM.K.DevelopersGut No 5 Hissa No 6, 11 And 1330-12-2023 00:00:00
Madhumalti Apartment B WingShree Datta EnterprisesS No 105A, H No 4/2,3,431-03-2018 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Trident Tower Type DShri Krishna HomesS No 15 H No 1 Plot No C31-03-2025 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Thanekar ParadiseAjay Madhukar Thanekar81/1A30-12-2019 00:00:00
Motiram PuramNayan Dilip DalalSurvey No 183 H.No 9 Survey No 184 Hissa No 2A30-05-2022 00:00:00
Evergreen Residency C WingBalaji ConstructionS No 25 Hissa No 5 And 6 And S No 24 Hissa No 130-12-2022 00:00:00
Avantika ResidencySanchita Construction28A/2/1P27-08-2018 00:00:00
Murlidhar PlazaSaipoojan EnterprisesGut No 40 Hissa No 1619-12-2021 00:00:00
ParshvadharaParshvanath Developers38 Hissa No 630-04-2019 00:00:00
Satvik E WingJigar EnterprisesS No 39 H No 6 Pt Plot No 1 And 1201-12-2019 00:00:00
Sai AanganPinnacle RealtorsSurvey No 181/2/3/4A30-01-2023 00:00:00
Khatri NxAashiyana ConstructionsGut No 111 Hissa No 3, 41, 4231-12-2019 00:00:00
Aditi PlazaChintamani Construction53/13P30-06-2018 00:00:00
Shree Sai PoojaM/S Mahalaxmi Construction Co.15/331-12-2019 00:00:00
Blue Diamond ResidencyKimaya ConstructionSurvey No 61 Hissa No 331-12-2019 00:00:00
Krishna HillsShree Omsai ConstructionThane, 40053131-07-2017 00:00:00
Ganesh HeightsShiv Builders And DevelopersGut No 53/1 And 53/2 Plot No. 11 And 1431-12-2019 00:00:00
Sai DarshanUnity Infratech17030-12-2020 00:00:00
Vinayak Kondilkar ArcadeVinayak Builders & Developers83/Part 131-12-2017 00:00:00
Swaroop OrchidSwaroop ConstructionS No 87 Hissa No 1130-06-2018 00:00:00
Shubh AanganShubh EnterprisesSurvey No 52 H No 3131-12-2019 00:00:00
Sky HillSeven Hill Buildcon100/5A30-04-2019 00:00:00
LeelaanganPravin Kashinath Haware135/230-12-2022 00:00:00
Swami HighlandsShree Swami Samarth AssociatesSurvey No 10A Hissa No 5P,Plot No 10, 9A31-12-2019 00:00:00
Spring Wood ParkSkyline Developers421503, Thane30-06-2018 00:00:00
The Address Ph-1 Wing ASadguru Associate421503, Thane, Badlapur31-08-2020 00:00:00
Parijat Plaza Type BM/S Parijat ConstructionsS No 49 H No 20 P No 10 S No 50 H No 731-05-2018 00:00:00
Shree Ganesh Vyapari SankulRajdeep Builders And DevelopersS No48 Hissa No 831-03-2019 00:00:00
Trinity Galaxy R1 And R4Trinity DevelopersSurvey No 172 Hissa 13 14 1530-06-2018 00:00:00
Vedant Imperial D Phase 3Mohan Hardasmal TharwaniS No 56/3 57/1P 57/330-06-2023 00:00:00
Vastu Swapnapurty ResidencyVastu Builders And Developers3831-07-2023 00:00:00
Maitri HillsEshwar EnterprisesSurvey No 7 A H No 4 P Plo No 9 And 1030-06-2019 00:00:00
Sai HighlandShree Saikrupa DevelopersGat No 91 Hissa No 330-03-2022 00:00:00
Patil Hill ViewEkdant DevelopersS No 42 Hissa No 5 S No 57 Hissa 330-06-2018 00:00:00
Neelkanth DeepKeshav RealtySno-7A, H No-1/2 Plot-2 Moje Belavali30-06-2019 00:00:00
Bhakti Park B WingBhakti CorporationSurvey No 83 Hissa No 12A31-03-2018 00:00:00
Nirmala ParadisePokhriyal And AssociatesS No 12730-09-2024 00:00:00
Bingo Dham Co-Op Hsg Soc LtdSai ConstructionsThane, 421503, Badlapur31-12-2022 00:00:00
Daksh PalaceThakur DevelopersManjarli30-09-2024 00:00:00
Shree Datta Narhari ApartmentOmkar EnterprisesSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Shree Ashtavinayak Vastu PrakalpaBalkrishna Kashinath Bhoir5730-11-2019 00:00:00
Tulsi AnandAnand HomesSr No 72 H 231-12-2019 00:00:00
Sai Prasad PlazaSainath Shete421503, Thane31-12-2019 00:00:00
Entilla By DevDev Konark CorporationSurvey No 98 Hissa No 4A30-09-2018 00:00:00
Bahinai BhuvanManoj Vasudev VaidyaCts No 22230-12-2020 00:00:00
NilgiriShivam DeveloperSurvey No 46 Hissa No 6A 19 Plot No 3230-05-2018 00:00:00
AlankapuriAshish Waman GoleS.No 17/H.No 1 & H.No 8/Plot No. 101-05-2027 00:00:00
Shrihari Chandan ApartmentAbhishek Shelters LimitedCts No 1269, 127031-03-2028 00:00:00
Shivshakti PrimeShivshakti BuildconSurvey No-53 Hissa No- 4/130-09-2027 00:00:00
Samarth ParadiseS P DevelopersS No 21 H No 1331-12-2026 00:00:00
Nav Avani ChsMangalya InfraS. No. 51, H. No. 3/A/30, Plot No. 3031-01-2025 00:00:00
Mangalam ArcadeMangalam EnterprisesSurvey No 7 Hissa No 1(P) Plot No 4224-04-2024 00:00:00
Dbr ClassicDbr Constructions Pvt Ltd330-12-2021 00:00:00
Vedant Nakshatra M Phase 2Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B30-12-2025 00:00:00
Wing B-6 SwanandM K Patil DevelopersGut No 8 P31-12-2018 00:00:00
Shreshtha Swapna Co-Op Housing Society LtdOm Shree Sai Builders And DevelopersTaluka Ambarnath31-12-2024 00:00:00
Uma Kunj Cooperative Housing Society LimitedPravin Arvind ApteSurvey No 50, H No.2B, S No. 51 H No.4/A/36 Plot No 35B15-12-2025 00:00:00
Siddhivinayak ResidencySairaj DevelopersS No 48 H No 2 P No 831-12-2024 00:00:00
Shubh HillsVardhman Enterprises1273C31-07-2018 00:00:00
Nirmal DharaSiddhivinayak EnterprisesS No. 4831-12-2019 00:00:00
Krishna ResidencyKrishna EnterprisesSurvey No 23, Hissa No 7/1,7/230-11-2018 00:00:00
Olive - Phase Iii - Pranjee Garden CityPranjee Properties Pvt. LtdPlot No. 5 Part30-06-2024 00:00:00
Prapti HeritageTridev Enterprises1/730-06-2025 00:00:00
Laxmi Shankar ComplexAditi Buildwell175 P30-06-2028 00:00:00
Mahalaxmi ResidenceShree Mahalaxmi DevelopersCs No 1263 C.No. 19 Cs No 1264 C.No. 3931-12-2024 00:00:00
Vitthai Anant PlazaSharad GaikwadBadlapur31-12-2026 00:00:00
Shree Datta Samartha ChslShree Sai Swami EnterprisesS No-40 H No-6 P No-630-06-2023 00:00:00
Viraj IconicBonzer OrbitGut No.53/5, Plot No.1, Gut No.53/6,Plot No.2, Gut No.53/731-12-2026 00:00:00
Project Details
  • Project:
    Maple City Phase I
  • Location:
  • S No 141 S No143 H No 4A S No 144 H No 1A And 2
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Shree Chintamani Enterprises
  • Phone:
  • Address:
  • Maple City
Project RERA Details
MAHA REARA No: P51700009222
Project Type Others
RERA Project Status Ongoing
Architect Satish Oak
Funding Bank STATE BANK OF INDIA
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 22 Aug 2017
Last Retrived 26 Jul 2025
Maple City Phase I QR Code
Maple City Phase I
MahaRERA - P51700009222
Apartment Details & Configuration
TypeArea
1 BHK26.33 Sq.mts. ( 283 Sq.ft. )
1 BHK26.62 Sq.mts. ( 287 Sq.ft. )
1 BHK26.65 Sq.mts. ( 287 Sq.ft. )
1 BHK26.81 Sq.mts. ( 289 Sq.ft. )
1 BHK26.84 Sq.mts. ( 289 Sq.ft. )
1 BHK30.2 Sq.mts. ( 325 Sq.ft. )
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )
1 BHK31.6 Sq.mts. ( 340 Sq.ft. )
1 BHK32.02 Sq.mts. ( 345 Sq.ft. )
1 BHK32.19 Sq.mts. ( 346 Sq.ft. )
1 BHK39.79 Sq.mts. ( 428 Sq.ft. )
2 BHK40.68 Sq.mts. ( 438 Sq.ft. )
2 BHK41.17 Sq.mts. ( 443 Sq.ft. )
1 BHK28.18 Sq.mts. ( 303 Sq.ft. )
1 BHK28.48 Sq.mts. ( 307 Sq.ft. )
1 BHK29.34 Sq.mts. ( 316 Sq.ft. )
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )
1 BHK30.29 Sq.mts. ( 326 Sq.ft. )
1 BHK31.39 Sq.mts. ( 338 Sq.ft. )
2 BHK41.18 Sq.mts. ( 443 Sq.ft. )
SHOP8.55 Sq.mts. ( 92 Sq.ft. )
SHOP8.85 Sq.mts. ( 95 Sq.ft. )
SHOP9.94 Sq.mts. ( 107 Sq.ft. )
SHOP10.6 Sq.mts. ( 114 Sq.ft. )
SHOP11.97 Sq.mts. ( 129 Sq.ft. )
1 BHK27.29 Sq.mts. ( 294 Sq.ft. )
1 BHK27.78 Sq.mts. ( 299 Sq.ft. )
1 BHK27.79 Sq.mts. ( 299 Sq.ft. )
1 BHK28.1 Sq.mts. ( 302 Sq.ft. )
1 BHK28.11 Sq.mts. ( 303 Sq.ft. )
1 BHK31.06 Sq.mts. ( 334 Sq.ft. )
1 BHK31.38 Sq.mts. ( 338 Sq.ft. )
1 BHK31.46 Sq.mts. ( 339 Sq.ft. )
1 BHK32.98 Sq.mts. ( 355 Sq.ft. )
SHOP5.89 Sq.mts. ( 63 Sq.ft. )
SHOP8.57 Sq.mts. ( 92 Sq.ft. )
SHOP8.77 Sq.mts. ( 94 Sq.ft. )
SHOP11.59 Sq.mts. ( 125 Sq.ft. )
SHOP11.64 Sq.mts. ( 125 Sq.ft. )
SHOP12.55 Sq.mts. ( 135 Sq.ft. )
SHOP13.5 Sq.mts. ( 145 Sq.ft. )
SHOP14.28 Sq.mts. ( 154 Sq.ft. )
SHOP16.13 Sq.mts. ( 174 Sq.ft. )
SHOP17.2 Sq.mts. ( 185 Sq.ft. )
1 BHK27.67 Sq.mts. ( 298 Sq.ft. )
1 BHK27.98 Sq.mts. ( 301 Sq.ft. )
SHOP9.8 Sq.mts. ( 105 Sq.ft. )
SHOP14.45 Sq.mts. ( 156 Sq.ft. )
SHOP21.08 Sq.mts. ( 227 Sq.ft. )
1 BHK27.4 Sq.mts. ( 295 Sq.ft. )
1 BHK28.14 Sq.mts. ( 303 Sq.ft. )
1 BHK28.16 Sq.mts. ( 303 Sq.ft. )
1 BHK31.76 Sq.mts. ( 342 Sq.ft. )
1 BHK31.88 Sq.mts. ( 343 Sq.ft. )
1 BHK32 Sq.mts. ( 344 Sq.ft. )
1 BHK32.67 Sq.mts. ( 352 Sq.ft. )
1 BHK32.87 Sq.mts. ( 354 Sq.ft. )
1 BHK33.04 Sq.mts. ( 356 Sq.ft. )
SHOP8.99 Sq.mts. ( 97 Sq.ft. )
SHOP9.73 Sq.mts. ( 105 Sq.ft. )
SHOP9.75 Sq.mts. ( 105 Sq.ft. )
SHOP10.52 Sq.mts. ( 113 Sq.ft. )
SHOP10.96 Sq.mts. ( 118 Sq.ft. )
SHOP12.13 Sq.mts. ( 131 Sq.ft. )
1 BHK28.17 Sq.mts. ( 303 Sq.ft. )
1 BHK28.47 Sq.mts. ( 306 Sq.ft. )
1 BHK28.62 Sq.mts. ( 308 Sq.ft. )
1 BHK28.9 Sq.mts. ( 311 Sq.ft. )
1 BHK29.9 Sq.mts. ( 322 Sq.ft. )
1 BHK31.75 Sq.mts. ( 342 Sq.ft. )
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )
1 BHK32.75 Sq.mts. ( 353 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Maple City Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Water Pipe Line
Water Conservation, Rain water Harvesting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Municipal Drainage Systems
Street Lighting
Wip
Storm Water Drains
Wip
Solid Waste Management And Disposal
Disposal Through Municipal Systems
Sewerage (Chamber, Lines, Septic Tank , STP)
Partial Recycling Of Water
Open Parking
Na
Landscaping & Tree Planting
Wip
Fire Protection And Fire Safety Requirements
Wip
Energy management
Wip
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Community Buildings
Wip
Aggregate area of recreational Open Space
Na
Buildings / Wings in Maple City Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Maple City Phase I by Shree Chintamani Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

183419 Sq. ft.

Project Area

15907 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

403 apartments in total
Total
403
Booked
296
Available
107

Saleable Area Statistics (Sq. ft.)

127974 Total
Total
127974
Booked
91155
Available
36818
Total 403 apartments in project. 296 apartments booked. 73% apartments booked.
Total 127974 Sq.ft. saleable area. 91155 saleable area booked.
71% area booked.

Maple City Building 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Maple City Building 2Dec 20209100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.33 Sq.mts. ( 283 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK26.62 Sq.mts. ( 287 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK26.65 Sq.mts. ( 287 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK26.81 Sq.mts. ( 289 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 BHK26.84 Sq.mts. ( 289 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK30.2 Sq.mts. ( 325 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.41 Sq.mts. ( 327 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )8
5 Booked62% Booked
62% Booked
1 BHK31.6 Sq.mts. ( 340 Sq.ft. )8
3 Booked37% Booked
37% Booked
1 BHK32.02 Sq.mts. ( 345 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 BHK32.19 Sq.mts. ( 346 Sq.ft. )8
5 Booked62% Booked
62% Booked
1 BHK39.79 Sq.mts. ( 428 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK40.68 Sq.mts. ( 438 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK41.17 Sq.mts. ( 443 Sq.ft. )16
7 Booked43% Booked
43% Booked
69 total apartments / 35 apartments booked. 50% apartments booked.
Work Description in Building Maple City Building 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Maple City Building 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Maple City Building 3Dec 20209101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.18 Sq.mts. ( 303 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK28.48 Sq.mts. ( 307 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK29.34 Sq.mts. ( 316 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )8
2 Booked25% Booked
25% Booked
1 BHK30.29 Sq.mts. ( 326 Sq.ft. )8
3 Booked37% Booked
37% Booked
1 BHK31.39 Sq.mts. ( 338 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.02 Sq.mts. ( 345 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK32.19 Sq.mts. ( 346 Sq.ft. )8
2 BHK40.68 Sq.mts. ( 438 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK41.18 Sq.mts. ( 443 Sq.ft. )16
9 Booked56% Booked
56% Booked
SHOP8.55 Sq.mts. ( 92 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.85 Sq.mts. ( 95 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.94 Sq.mts. ( 107 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10.6 Sq.mts. ( 114 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.97 Sq.mts. ( 129 Sq.ft. )2
1 Booked50% Booked
50% Booked
72 total apartments / 33 apartments booked. 45% apartments booked.
Work Description in Building Maple City Building 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Maple City Building 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Maple City Building 4Dec 20208101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.29 Sq.mts. ( 294 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK27.78 Sq.mts. ( 299 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK27.79 Sq.mts. ( 299 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK28.1 Sq.mts. ( 302 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK28.11 Sq.mts. ( 303 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK31.06 Sq.mts. ( 334 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.38 Sq.mts. ( 338 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK31.46 Sq.mts. ( 339 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK32.98 Sq.mts. ( 355 Sq.ft. )14
14 Booked100% Booked
100% Booked
SHOP5.89 Sq.mts. ( 63 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.57 Sq.mts. ( 92 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP8.77 Sq.mts. ( 94 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP11.59 Sq.mts. ( 125 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.64 Sq.mts. ( 125 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP12.55 Sq.mts. ( 135 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.5 Sq.mts. ( 145 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.28 Sq.mts. ( 154 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.13 Sq.mts. ( 174 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.2 Sq.mts. ( 185 Sq.ft. )1
1 Booked100% Booked
100% Booked
69 total apartments / 69 apartments booked. 100% apartments booked.
Work Description in Building Maple City Building 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Maple City Building 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Maple City Building 5Dec 20208101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.29 Sq.mts. ( 294 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK27.67 Sq.mts. ( 298 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK27.79 Sq.mts. ( 299 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK27.98 Sq.mts. ( 301 Sq.ft. )6
5 Booked83% Booked
83% Booked
1 BHK28.11 Sq.mts. ( 303 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK31.06 Sq.mts. ( 334 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.38 Sq.mts. ( 338 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK31.46 Sq.mts. ( 339 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK32.98 Sq.mts. ( 355 Sq.ft. )14
14 Booked100% Booked
100% Booked
SHOP5.89 Sq.mts. ( 63 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.57 Sq.mts. ( 92 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP8.77 Sq.mts. ( 94 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP9.8 Sq.mts. ( 105 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.59 Sq.mts. ( 125 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.64 Sq.mts. ( 125 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP12.55 Sq.mts. ( 135 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.5 Sq.mts. ( 145 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.45 Sq.mts. ( 156 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.13 Sq.mts. ( 174 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.2 Sq.mts. ( 185 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP21.08 Sq.mts. ( 227 Sq.ft. )1
1 Booked100% Booked
100% Booked
71 total apartments / 69 apartments booked. 97% apartments booked.
Work Description in Building Maple City Building 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress78% done
78% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Maple City Building 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Maple City Building 6Dec 20209101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.62 Sq.mts. ( 287 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK26.65 Sq.mts. ( 287 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK27.4 Sq.mts. ( 295 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK28.14 Sq.mts. ( 303 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK28.16 Sq.mts. ( 303 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.6 Sq.mts. ( 340 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.76 Sq.mts. ( 342 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.88 Sq.mts. ( 343 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK32 Sq.mts. ( 344 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK32.02 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.67 Sq.mts. ( 352 Sq.ft. )7
6 Booked85% Booked
85% Booked
1 BHK32.87 Sq.mts. ( 354 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK33.04 Sq.mts. ( 356 Sq.ft. )7
7 Booked100% Booked
100% Booked
SHOP8.99 Sq.mts. ( 97 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.73 Sq.mts. ( 105 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.75 Sq.mts. ( 105 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10.52 Sq.mts. ( 113 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10.96 Sq.mts. ( 118 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP12.13 Sq.mts. ( 131 Sq.ft. )1
1 Booked100% Booked
100% Booked
55 total apartments / 46 apartments booked. 83% apartments booked.
Work Description in Building Maple City Building 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress52% done
52% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Maple City Building 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Maple City Building 7Dec 20209101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.17 Sq.mts. ( 303 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK28.47 Sq.mts. ( 306 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK28.62 Sq.mts. ( 308 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 BHK28.9 Sq.mts. ( 311 Sq.ft. )14
12 Booked85% Booked
85% Booked
1 BHK29.9 Sq.mts. ( 322 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.75 Sq.mts. ( 342 Sq.ft. )16
12 Booked75% Booked
75% Booked
1 BHK31.88 Sq.mts. ( 343 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.07 Sq.mts. ( 345 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK32.75 Sq.mts. ( 353 Sq.ft. )16
9 Booked56% Booked
56% Booked
67 total apartments / 44 apartments booked. 65% apartments booked.
Work Description in Building Maple City Building 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress49% done
49% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Chintamani Enterprises
for Project
Maple City Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation