Project overview

Manthan Acropolis is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800015626. Manthan Acropolis is located at 38/B. This is a New being developed by Manthan Development Corporation.

Manthan Acropolis has 1 BHK & 1RK Apartments with carpet areas ranging from 219 to 457 Sq.ft. Carpet. The Project has total 34 of which 34 are currently available for sale.

Manthan Acropolis is being developed on a total land area of 11189 Sq.ft. out of which 1811 Sq.ft. i.e 16% is reserved for recreational purposes. Manthan Acropolis has 1 Wings / Towers Manthan Acropolis

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Manthan Acropolis
  • Location:
  • 38/B
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Manthan Development Corporation
  • Phone:
  • Address:
  • Zaitoon Apartment
Project RERA Details
MAHA REARA No: P51800015626
Project Type Mixed
RERA Project Status New
Architect Ram Aglave And Associates
Funding Bank KARNATAKA BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Nov 2024
Last Retrived 26 Jul 2025
Manthan Acropolis QR Code
Manthan Acropolis
MahaRERA - P51800015626
Apartment Details & Configuration
TypeArea
1 BHK40.52 Sq.mts. ( 436 Sq.ft. )
1 BHK42.46 Sq.mts. ( 457 Sq.ft. )
1 BHK42.5 Sq.mts. ( 457 Sq.ft. )
1RK20.37 Sq.mts. ( 219 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Manthan Acropolislast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Started On Site
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Started On Site
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Started On Site
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Started On Site
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Started On Site
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Started On Site
Water Supply
Only Labour Drinking Water Connection Installed
Buildings / Wings in Manthan Acropolis
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Manthan Acropolis by Manthan Development Corporationlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

11189 Sq. ft.

Project Area

1811 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

34 apartments in total
Total
34
Booked
0
Available
34

Saleable Area Statistics (Sq. ft.)

13606 Total
Total
13606
Booked
0
Available
13606
Total 34 apartments in project. 0 apartments booked. 0% apartments booked.
Total 13606 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Manthan Acropolis

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Manthan AcropolisDec 202192000400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.52 Sq.mts. ( 436 Sq.ft. )13
None Booked0% Booked
0% Booked
1 BHK42.46 Sq.mts. ( 457 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK42.5 Sq.mts. ( 457 Sq.ft. )7
None Booked0% Booked
0% Booked
1RK20.37 Sq.mts. ( 219 Sq.ft. )7
None Booked0% Booked
0% Booked
34 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Manthan AcropolisCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked
Channel Partners
Channel Partners Registered by Developer
Manthan Development Corporation
for Project
Manthan Acropolis
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation