Project overview

Mansi Apartmrnt is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000025054. Mansi Apartmrnt is located at 78/5. This is a New being developed by Anmol Developers.

Mansi Apartmrnt has 1 BHK & 2 BHK Apartments with carpet areas ranging from 396 to 582 Sq.ft. Carpet. The Project has total 12 of which 12 are currently available for sale.

Mansi Apartmrnt is being developed on a total land area of 10118 Sq.ft. out of which 10118 Sq.ft. i.e 100% is reserved for recreational purposes. Mansi Apartmrnt has 1 Wings / Towers Mansi Apartment

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Mansi Apartmrnt
  • Location:
  • 78/5
  • Const. Stage:
    New
  • Possession:
    28 Feb 2021
Developer Details

  • Developer:
    Anmol Developers
  • Phone:
  • Address:
  • Swastik Complex
Project RERA Details
MAHA REARA No: P99000025054
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 28 Feb 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Mar 2020
Last Retrived 28 Jul 2025
Mansi Apartmrnt QR Code
Mansi Apartmrnt
MahaRERA - P99000025054
Apartment Details & Configuration
TypeArea
1 BHK36.82 Sq.mts. ( 396 Sq.ft. )
2 BHK46.62 Sq.mts. ( 502 Sq.ft. )
2 BHK48.4 Sq.mts. ( 521 Sq.ft. )
2 BHK54.03 Sq.mts. ( 582 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mansi Apartmrntlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work Almost Complete.
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank &Amp; Plumbing Complete
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Water Storage Tanks Complete.
Buildings / Wings in Mansi Apartmrnt
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mansi Apartmrnt by Anmol Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

10118 Sq. ft.

Project Area

10118 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

12 apartments in total
Total
12
Booked
0
Available
12

Saleable Area Statistics (Sq. ft.)

6002 Total
Total
6002
Booked
0
Available
6002
Total 12 apartments in project. 0 apartments booked. 0% apartments booked.
Total 6002 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Mansi Apartment

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mansi ApartmentAug 20204101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.82 Sq.mts. ( 396 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK46.62 Sq.mts. ( 502 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK48.4 Sq.mts. ( 521 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK54.03 Sq.mts. ( 582 Sq.ft. )3
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Mansi ApartmentCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Anmol Developers
for Project
Mansi Apartmrnt
last updated on 28 Jul 2025 as per information obtained from MARA RERA.