Project overview

Manohar Vikas Shreeji Paraiso Phase - 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700024942. Manohar Vikas Shreeji Paraiso Phase - 2 is located at S. No. 60, H.No.5 Pt,6 Pt, S. No.61,H. No.1 Part,S. No. 91. This is a New being developed by Deeplaxmi Developers.

Manohar Vikas Shreeji Paraiso Phase - 2 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 450 to 582 Sq.ft. Carpet. The Project has total 578 of which 495 are currently available for sale.

Manohar Vikas Shreeji Paraiso Phase - 2 is being developed on a total land area of 115881 Sq.ft. out of which 11588 Sq.ft. i.e 10% is reserved for recreational purposes. Manohar Vikas Shreeji Paraiso Phase - 2 has 7 Wings / Towers B Wing,C Wing,E Wing,F Wing,G Wing,H Wing,I Wing

ProjectDeveloperLocationPossession
Manohar Vikas Shreeji Paraiso Phase - 2Deeplaxmi DevelopersS. No. 60, H.No.5 Pt,6 Pt, S. No.61,H. No.1 Part,S. No. 9130-03-2029 00:00:00
Olive - Phase Iii - Pranjee Garden CityPranjee Properties Pvt. LtdPlot No. 5 Part30-06-2024 00:00:00
Riddhi SiddhiShreeji & Innovative DevelopersPlot No 6 And 9, Survey No 105 - A, Hissa No 131-12-2018 00:00:00
Panvelkar Utsav Phase ISai Swarg EnterprisesGut No 1, Hissa No,130-12-2021 00:00:00
Shubh NisargVardhaman And Vastu AssociatesS No 9 H No 5 6 720-12-2021 00:00:00
Sai ArcadeSai DevelopersSurvey No 5 Hissa No 22 Plot No 431-12-2017 00:00:00
Sai Raj ResidencyShriram Developers19 H .No.47, P No.731-12-2018 00:00:00
Nandraj Nagari Type ESwaraj DevelopersS No 58 Hissa No 2P S No 60Pplot 16 And 1431-05-2018 00:00:00
Siddharth ApartmentRohan Gruh NirmanS No 40 And H No 331-03-2018 00:00:00
Om Shrinivas ApartmentShriniwas DevelopersSurvey No 9 Hissa No 4A Plot No 531-03-2018 00:00:00
Maruti AsthaMaruti HomesSurvey No 97B,Hissa No. 7, Plot No. 531-12-2017 00:00:00
Rachana HeightsReshma Vikas Bambulkar482109-06-2019 00:00:00
Maruti MeadowsVasani EnterprisesNa, Thane, 42150330-12-2020 00:00:00
Vedant EnclaveSara EnterprisesS.No.51 H.No.2A/7 Plot No 1730-11-2020 00:00:00
Deep EnclaveDattaguru EnterprisesSurvey No. 42, Plot No. C-11 And C-11A30-06-2019 00:00:00
Sanveg Residency - Phase IOm Vastu HomesSurvey No 180 Hissa No 230-06-2021 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Pranjee Garden City Phase -IiPranjee Properties Pvt. LtdPlot No 330-11-2018 00:00:00
Eternal AvenueMagnum Life SpacesS No 90 Hissa No 2 And 331-03-2018 00:00:00
Satvik E WingJigar EnterprisesS No 39 H No 6 Pt Plot No 1 And 1201-12-2019 00:00:00
Chintamani HeightsYash EnterprisesPlot No 4 Plot No 731-12-2019 00:00:00
Aawas DeepShree Krishna BuildconSurvey No. 16630-12-2022 00:00:00
Thanekar ParklandAjay Madhukar Thanekar58/231-12-2019 00:00:00
Vishwajeet ManorAbhijeet RealtyGut No 574 Pt 574231-12-2019 00:00:00
Manohar Vikas Shreeji Paraiso Phase 1Deeplaxmi DevelopersS No 60/5, 60/6, 61/130-05-2022 00:00:00
Sai Kishan ApartmentSai Kishan ConstructionsSurvey No.17, Hissa No.14, Plot No. 231-07-2019 00:00:00
Sai VillaBuilt Tech Builders & Developers Pvt. Ltd.Survey No 174 Hissa No 5P30-12-2022 00:00:00
Shreeji HeightsShubh BuildconSurvey No 83 1 84 1 2 3 630-06-2022 00:00:00
Metro ImperialMetro Balaji DevelopersS No 2030-06-2021 00:00:00
Rathadia Co-Operative Housing Society LtdJ Square InfraSurvey No 90 H No 331-03-2019 00:00:00
Navjeevan Co-Op. Housing Society LtdAvishkar GroupSurvey No. 4231-12-2019 00:00:00
Hira Panna ResidencyHaro Om Sai Builders And Developers10A/5/431-12-2019 00:00:00
Shree PalacePushlata Subhash GhuleSurvey No 273 Hissa No 130-12-2021 00:00:00
Precious Harmony Phase IiM/S Soham ConstructionS No 50 H No 2, 4, 530-12-2022 00:00:00
Royal Wood ParkPrabhavati ConstructionsS.No.23, H.No.1 Pt30-06-2021 00:00:00
Shubh AshishShubh BuildersS No 82 Hissa No 14-231-12-2019 00:00:00
Alok GalaxyJuhi Developers30 Mtr Road13-10-2021 00:00:00
Omkar ApartmentsPinnacle LifespacesS No 1,H No 17 E, 5A30-03-2022 00:00:00
Krishna C And D WingNina BuildersGut.No.90/1, 91/1A30-12-2021 00:00:00
Sai Krupa ResidencySairaj DevelopersS.No.78 Plot No.1 H.No.2 P31-12-2019 00:00:00
Shubh Nirman Phase IGuru DevelopersBelavali, Thane, 42150330-12-2022 00:00:00
Badlapur ArcadeMahalaxmi Builders & DevelopersSurvey No 44 1 A 130-12-2023 00:00:00
Mansvi ApartmentRuhi EnterprisesS No 45 H No 17 Plot No 7 Belavali West Badlapur30-03-2023 00:00:00
Sairaj Avenue Wing BVirendra Atmaram SalunkheS No 97B, Hissa No 5/3, Plot No 4431-05-2024 00:00:00
Samarth ParadiseS P DevelopersS No 21 H No 1331-12-2026 00:00:00
Shreeji MilestoneDeep Laxmi AssociatesSurvey No. 48, Plot No. 0130-06-2029 00:00:00
Sara HeightsShete's ConstructionG No 47, Hissa No. 19 And 2030-12-2022 00:00:00
Radha ResidencyAkshay DevelopersSurvey No 20 Plot No 230-06-2019 00:00:00
Manohar Shreeji Nirvana Phase 4Deeplaxmi DevelopersS No 43 H No 1A, S No 43 H No 1B30-10-2022 00:00:00
Krishna KunjRaj Manohar WadhwaSurvey No 63 / Hissa No 2 Plot No A231-03-2018 00:00:00
Precious HarmonyM/S Soham ConstructionSurvey No 51 Hissa No 2 New Belavali Badlapur 42150331-03-2018 00:00:00
Kalp CityKasata Home Tech65/631-03-2018 00:00:00
Amber ArcadeMaitri DevelopersSurvey No 51 Hissa No 3P31-12-2018 00:00:00
Kool Breeze Phase IiAbhishek Shelters LtdS No 127 H No 32 S No 13 H No 1231-05-2018 00:00:00
Krishna KunjKrishna Associates97/B, H.No.- P ,Plot No.-1231-03-2018 00:00:00
Paradise Park - Phase 1M/S Vakratund Enterprises421503, Thane, Belavli30-03-2024 00:00:00
SundaramM/S. Purab AssociatesPart Portion Of S No 45 H No 2Pt Plot No 1 2 3 And Part Portion Of S No 45 H No 2 Pt Plot No 431-01-2020 00:00:00
Soham NeelM/S Neel Siddhi Enterprises27/1/11 , Plot No. 831-03-2027 00:00:00
Dreams EnclaveDreamland DevelopersS No97b/1/5, S No97b/3/431-12-2026 00:00:00
Shivam HeritageM K EnterprisesSurvey No.58, 59, 66 Plot No. 2130-04-2025 00:00:00
Project Details
  • Project:
    Manohar Vikas Shreeji Paraiso Phase - 2
  • Location:
  • S. No. 60, H.No.5 Pt,6 Pt, S. No.61,H. No.1 Part,S. No. 91
  • Const. Stage:
    New
  • Possession:
    30 Mar 2029
Developer Details

  • Developer:
    Deeplaxmi Developers
  • Phone:
  • Address:
  • Manohar Vikas Shreeji Paraiso
Project RERA Details
MAHA REARA No: P51700024942
Project Type Residential / Group Housing
RERA Project Status New
Architect Urban Vastu Designer
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Mar 2029
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Jun 2021
Last Retrived 26 Jul 2025
Manohar Vikas Shreeji Paraiso Phase - 2 QR Code
Manohar Vikas Shreeji Paraiso Phase - 2
MahaRERA - P51700024942
Apartment Details & Configuration
TypeArea
2 BHK59.35 Sq.mts. ( 639 Sq.ft. )
2 BHK61.53 Sq.mts. ( 662 Sq.ft. )
2 BHK61.58 Sq.mts. ( 663 Sq.ft. )
3 BHK71.44 Sq.mts. ( 769 Sq.ft. )
3 BHK71.85 Sq.mts. ( 773 Sq.ft. )
3 BHK76.02 Sq.mts. ( 818 Sq.ft. )
3 BHK76.42 Sq.mts. ( 823 Sq.ft. )
Shop15.65 Sq.mts. ( 168 Sq.ft. )
Shop18.05 Sq.mts. ( 194 Sq.ft. )
Shop18.16 Sq.mts. ( 195 Sq.ft. )
Shop18.72 Sq.mts. ( 202 Sq.ft. )
Shop20.63 Sq.mts. ( 222 Sq.ft. )
Shop21.95 Sq.mts. ( 236 Sq.ft. )
Shop24.7 Sq.mts. ( 266 Sq.ft. )
Shop26.87 Sq.mts. ( 289 Sq.ft. )
Shop28.46 Sq.mts. ( 306 Sq.ft. )
Shop36.99 Sq.mts. ( 398 Sq.ft. )
2 BHK56.03 Sq.mts. ( 603 Sq.ft. )
2 BHK56.63 Sq.mts. ( 610 Sq.ft. )
2 BHK56.74 Sq.mts. ( 611 Sq.ft. )
2 BHK56.97 Sq.mts. ( 613 Sq.ft. )
2 BHK57.14 Sq.mts. ( 615 Sq.ft. )
2 BHK57.34 Sq.mts. ( 617 Sq.ft. )
2 BHK57.39 Sq.mts. ( 618 Sq.ft. )
2 BHK57.47 Sq.mts. ( 619 Sq.ft. )
2 BHK57.63 Sq.mts. ( 620 Sq.ft. )
3 BHK73.59 Sq.mts. ( 792 Sq.ft. )
4 BHK106.26 Sq.mts. ( 1144 Sq.ft. )
4 BHK107.22 Sq.mts. ( 1154 Sq.ft. )
Shop13.36 Sq.mts. ( 144 Sq.ft. )
Shop21.96 Sq.mts. ( 236 Sq.ft. )
Shop22.78 Sq.mts. ( 245 Sq.ft. )
Shop27.77 Sq.mts. ( 299 Sq.ft. )
Shop28.78 Sq.mts. ( 310 Sq.ft. )
Shop28.81 Sq.mts. ( 310 Sq.ft. )
Shop32.33 Sq.mts. ( 348 Sq.ft. )
Shop36.01 Sq.mts. ( 388 Sq.ft. )
Shop38.42 Sq.mts. ( 414 Sq.ft. )
2 BHK43.24 Sq.mts. ( 465 Sq.ft. )
2 BHK49.28 Sq.mts. ( 530 Sq.ft. )
2 BHK52.44 Sq.mts. ( 564 Sq.ft. )
2 BHK52.64 Sq.mts. ( 567 Sq.ft. )
2 BHK53.06 Sq.mts. ( 571 Sq.ft. )
2 BHK53.22 Sq.mts. ( 573 Sq.ft. )
2 BHK53.35 Sq.mts. ( 574 Sq.ft. )
2 BHK53.96 Sq.mts. ( 581 Sq.ft. )
2 BHK54.54 Sq.mts. ( 587 Sq.ft. )
2 BHK54.66 Sq.mts. ( 588 Sq.ft. )
2 BHK54.71 Sq.mts. ( 589 Sq.ft. )
2 BHK57.89 Sq.mts. ( 623 Sq.ft. )
2 BHK58.08 Sq.mts. ( 625 Sq.ft. )
2 BHK52.02 Sq.mts. ( 560 Sq.ft. )
2 BHK52.74 Sq.mts. ( 568 Sq.ft. )
2 BHK53.04 Sq.mts. ( 571 Sq.ft. )
2 BHK53.36 Sq.mts. ( 574 Sq.ft. )
2 BHK54.1 Sq.mts. ( 582 Sq.ft. )
2 BHK54.62 Sq.mts. ( 588 Sq.ft. )
3 BHK61.86 Sq.mts. ( 666 Sq.ft. )
1 BHK41.92 Sq.mts. ( 451 Sq.ft. )
2 BHK48.67 Sq.mts. ( 524 Sq.ft. )
2 BHK52.08 Sq.mts. ( 561 Sq.ft. )
3 BHK90.18 Sq.mts. ( 971 Sq.ft. )
2 BHK53.03 Sq.mts. ( 571 Sq.ft. )
2 BHK56.92 Sq.mts. ( 613 Sq.ft. )
3 BHK68.58 Sq.mts. ( 738 Sq.ft. )
3 BHK76.45 Sq.mts. ( 823 Sq.ft. )
1 BHK41.76 Sq.mts. ( 450 Sq.ft. )
2 BHK52.43 Sq.mts. ( 564 Sq.ft. )
2 BHK53.37 Sq.mts. ( 574 Sq.ft. )
2 BHK53.42 Sq.mts. ( 575 Sq.ft. )
2 BHK53.45 Sq.mts. ( 575 Sq.ft. )
2 BHK53.54 Sq.mts. ( 576 Sq.ft. )
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )
2 BHK53.77 Sq.mts. ( 579 Sq.ft. )
2 BHK53.79 Sq.mts. ( 579 Sq.ft. )
2 BHK53.8 Sq.mts. ( 579 Sq.ft. )
2 BHK53.97 Sq.mts. ( 581 Sq.ft. )
2 BHK54.08 Sq.mts. ( 582 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Manohar Vikas Shreeji Paraiso Phase - 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
To Be Provided
Community Buildings
Club House
Electrical Meter Room, Sub-Station, Receiving Station
To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
To Be Provided
Landscaping & Tree Planting
To Be Provided
Open Parking
To Be Provided
Sewerage (Chamber, Lines, Septic Tank , STP)
To Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
To Be Provided
Water Conservation, Rain water Harvesting
To Be Provided
Water Supply
To Be Provided
Buildings / Wings in Manohar Vikas Shreeji Paraiso Phase - 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Manohar Vikas Shreeji Paraiso Phase - 2 by Deeplaxmi Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

115881 Sq. ft.

Project Area

11588 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

578 apartments in total
Total
578
Booked
83
Available
495

Saleable Area Statistics (Sq. ft.)

352693 Total
Total
352693
Booked
52285
Available
300408
Total 578 apartments in project. 83 apartments booked. 14% apartments booked.
Total 352693 Sq.ft. saleable area. 52285 saleable area booked.
15% area booked.

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMar 2028131110033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.35 Sq.mts. ( 639 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK61.53 Sq.mts. ( 662 Sq.ft. )12
5 Booked41% Booked
41% Booked
2 BHK61.58 Sq.mts. ( 663 Sq.ft. )12
8 Booked66% Booked
66% Booked
3 BHK71.44 Sq.mts. ( 769 Sq.ft. )6
3 Booked50% Booked
50% Booked
3 BHK71.85 Sq.mts. ( 773 Sq.ft. )6
5 Booked83% Booked
83% Booked
3 BHK76.02 Sq.mts. ( 818 Sq.ft. )5
3 Booked60% Booked
60% Booked
3 BHK76.42 Sq.mts. ( 823 Sq.ft. )6
2 Booked33% Booked
33% Booked
Shop15.65 Sq.mts. ( 168 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.05 Sq.mts. ( 194 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.16 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.72 Sq.mts. ( 202 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.63 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.95 Sq.mts. ( 236 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.7 Sq.mts. ( 266 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.87 Sq.mts. ( 289 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.46 Sq.mts. ( 306 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop36.99 Sq.mts. ( 398 Sq.ft. )1
None Booked0% Booked
0% Booked
58 total apartments / 27 apartments booked. 46% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 2028131110050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.03 Sq.mts. ( 603 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK56.63 Sq.mts. ( 610 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK56.74 Sq.mts. ( 611 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK56.97 Sq.mts. ( 613 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK57.14 Sq.mts. ( 615 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK57.34 Sq.mts. ( 617 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK57.39 Sq.mts. ( 618 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK57.47 Sq.mts. ( 619 Sq.ft. )11
2 BHK57.63 Sq.mts. ( 620 Sq.ft. )12
3 BHK73.59 Sq.mts. ( 792 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK106.26 Sq.mts. ( 1144 Sq.ft. )6
None Booked0% Booked
0% Booked
4 BHK107.22 Sq.mts. ( 1154 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop13.36 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.96 Sq.mts. ( 236 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop22.78 Sq.mts. ( 245 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.77 Sq.mts. ( 299 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop28.78 Sq.mts. ( 310 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.81 Sq.mts. ( 310 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop32.33 Sq.mts. ( 348 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop36.01 Sq.mts. ( 388 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.42 Sq.mts. ( 414 Sq.ft. )1
None Booked0% Booked
0% Booked
113 total apartments / 2 apartments booked. 1% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress76% done
76% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingMar 2028141110035
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK43.24 Sq.mts. ( 465 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK49.28 Sq.mts. ( 530 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK52.44 Sq.mts. ( 564 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK52.64 Sq.mts. ( 567 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK53.06 Sq.mts. ( 571 Sq.ft. )6
2 Booked33% Booked
33% Booked
2 BHK53.22 Sq.mts. ( 573 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK53.35 Sq.mts. ( 574 Sq.ft. )13
4 Booked30% Booked
30% Booked
2 BHK53.96 Sq.mts. ( 581 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK54.54 Sq.mts. ( 587 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK54.66 Sq.mts. ( 588 Sq.ft. )6
2 BHK54.71 Sq.mts. ( 589 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK57.89 Sq.mts. ( 623 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK58.08 Sq.mts. ( 625 Sq.ft. )7
4 Booked57% Booked
57% Booked
78 total apartments / 17 apartments booked. 21% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress93% done
93% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingMar 2028141110045
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK52.02 Sq.mts. ( 560 Sq.ft. )26
None Booked0% Booked
0% Booked
2 BHK52.74 Sq.mts. ( 568 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK53.04 Sq.mts. ( 571 Sq.ft. )22
None Booked0% Booked
0% Booked
2 BHK53.36 Sq.mts. ( 574 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK54.1 Sq.mts. ( 582 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK54.62 Sq.mts. ( 588 Sq.ft. )13
None Booked0% Booked
0% Booked
3 BHK61.86 Sq.mts. ( 666 Sq.ft. )2
None Booked0% Booked
0% Booked
102 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress48% done
48% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G WingMar 2028131010035
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.92 Sq.mts. ( 451 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK48.67 Sq.mts. ( 524 Sq.ft. )24
None Booked0% Booked
0% Booked
2 BHK52.08 Sq.mts. ( 561 Sq.ft. )23
None Booked0% Booked
0% Booked
3 BHK90.18 Sq.mts. ( 971 Sq.ft. )24
None Booked0% Booked
0% Booked
72 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building G WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H WingMar 2028131010022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.03 Sq.mts. ( 571 Sq.ft. )34
None Booked0% Booked
0% Booked
2 BHK56.92 Sq.mts. ( 613 Sq.ft. )24
None Booked0% Booked
0% Booked
3 BHK68.58 Sq.mts. ( 738 Sq.ft. )12
3 BHK76.45 Sq.mts. ( 823 Sq.ft. )1
None Booked0% Booked
0% Booked
71 total apartments / 2 apartments booked. 2% apartments booked.
Work Description in Building H WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress55% done
55% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

I Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
I WingMar 202813101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.76 Sq.mts. ( 450 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK52.43 Sq.mts. ( 564 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK52.74 Sq.mts. ( 568 Sq.ft. )11
4 Booked36% Booked
36% Booked
2 BHK53.37 Sq.mts. ( 574 Sq.ft. )6
2 BHK53.42 Sq.mts. ( 575 Sq.ft. )6
3 Booked50% Booked
50% Booked
2 BHK53.45 Sq.mts. ( 575 Sq.ft. )12
2 BHK53.54 Sq.mts. ( 576 Sq.ft. )6
2 Booked33% Booked
33% Booked
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK53.77 Sq.mts. ( 579 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK53.79 Sq.mts. ( 579 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK53.8 Sq.mts. ( 579 Sq.ft. )6
2 Booked33% Booked
33% Booked
2 BHK53.97 Sq.mts. ( 581 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK54.08 Sq.mts. ( 582 Sq.ft. )6
6 Booked100% Booked
100% Booked
84 total apartments / 35 apartments booked. 41% apartments booked.
Work Description in Building I WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Deeplaxmi Developers
for Project
Manohar Vikas Shreeji Paraiso Phase - 2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation