Project overview

Mannat Tower is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700032615. Mannat Tower is located at Cts No.24320. This is a New being developed by Ranas Enterprises.

Mannat Tower has 2 BHK Apartments with carpet areas ranging from 604 to 616 Sq.ft. Carpet. The Project has total 28 of which 24 are currently available for sale.

Mannat Tower is being developed on a total land area of 6291 Sq.ft. Mannat Tower has 1 Wings / Towers Mannat Tower Wing A And B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Mannat Tower
  • Location:
  • Cts No.24320
  • Const. Stage:
    New
  • Possession:
    31 Oct 2024
Developer Details

  • Developer:
    Ranas Enterprises
  • Phone:
  • Address:
  • Murli Manohar Plaza
Project RERA Details
MAHA REARA No: P51700032615
Project Type Residential / Group Housing
RERA Project Status New
Architect Sharad Joglekar
Funding Bank AXIS BANK
Proposed Possession 31 Oct 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Jan 2022
Last Retrived 26 Jul 2025
Mannat Tower QR Code
Mannat Tower
MahaRERA - P51700032615
Apartment Details & Configuration
TypeArea
2 BHK56.07 Sq.mts. ( 604 Sq.ft. )
2 BHK57.27 Sq.mts. ( 616 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mannat Towerlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Layout
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking100% completed
95% Complete
As Per Layout
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Connection To Municipal Sewerage Line
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Borewell
Buildings / Wings in Mannat Tower
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mannat Tower by Ranas Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6291 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

28 apartments in total
Total
28
Booked
4
Available
24

Saleable Area Statistics (Sq. ft.)

17080 Total
Total
17080
Booked
2453
Available
14627
Total 28 apartments in project. 4 apartments booked. 14% apartments booked.
Total 17080 Sq.ft. saleable area. 2453 saleable area booked.
14% area booked.

Mannat Tower Wing A And B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mannat Tower Wing A And BOct 2024810001018
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK56.07 Sq.mts. ( 604 Sq.ft. )14
2 BHK57.27 Sq.mts. ( 616 Sq.ft. )14
3 Booked21% Booked
21% Booked
28 total apartments / 4 apartments booked. 14% apartments booked.
Work Description in Building Mannat Tower Wing A And BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ranas Enterprises
for Project
Mannat Tower
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation