Project overview
Mangeshi Tulip is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700047949. Mangeshi Tulip is located at Thane. This is a New Project being developed by Mangesh Gaikar.
Mangeshi Tulip has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 115 to 95 Sq.ft. Carpet. The Project has total 184 of which 108 are currently available for sale.
Mangeshi Tulip is being developed on a total land area of 38027 Sq.ft. Mangeshi Tulip has 3 Wings / Towers A1,A2,A3
| Project | Developer | Location | Possession |
-
Project:
Mangeshi Tulip
-
Location:
-
Thane
-
Const. Stage:
New Project
-
Possession:
30 Jul 2026
-
Developer:
Mangesh Gaikar
-
Phone:
-
Address:
-
001, 002 Ground Floor, A/5, Mangeshi Sahara, Chikanghar, Mangeshi Sahara, Near Chatribunglow, 421301
| MAHA REARA No: |
P51700047949 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Architect |
Vitan Consultant |
| Funding Bank |
DCB Bank Ltd |
| Proposed Possession |
30 Jul 2026 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
21 Aug 2023 |
| Last Retrived |
28 Jul 2025 |
Mangeshi Tulip QR Code
Mangeshi Tulip
MahaRERA - P51700047949
| Type | Area |
| 2 BHK | 47.53 Sq.mts. ( 512 Sq.ft. ) |
| Shop | 8.16 Sq.mts. ( 88 Sq.ft. ) |
| Shop | 10.86 Sq.mts. ( 117 Sq.ft. ) |
| Shop | 13.35 Sq.mts. ( 144 Sq.ft. ) |
| Shop | 13.8 Sq.mts. ( 149 Sq.ft. ) |
| 2 BHK | 48.3 Sq.mts. ( 520 Sq.ft. ) |
| 1 BHK | 37.1 Sq.mts. ( 399 Sq.ft. ) |
| 1 BHK | 39.55 Sq.mts. ( 426 Sq.ft. ) |
| 2 BHK | 48.45 Sq.mts. ( 522 Sq.ft. ) |
| 2 BHK | 48.5 Sq.mts. ( 522 Sq.ft. ) |
| 2 BHK | 48.9 Sq.mts. ( 526 Sq.ft. ) |
| 2 BHK | 8.09 Sq.mts. ( 87 Sq.ft. ) |
| Shop | 8.62 Sq.mts. ( 93 Sq.ft. ) |
| Shop | 8.84 Sq.mts. ( 95 Sq.ft. ) |
| Shop | 10.73 Sq.mts. ( 115 Sq.ft. ) |
| Shop | 12.33 Sq.mts. ( 133 Sq.ft. ) |
| Shop | 13.42 Sq.mts. ( 144 Sq.ft. ) |
| Shop | 14.49 Sq.mts. ( 156 Sq.ft. ) |
| Shop | 14.99 Sq.mts. ( 161 Sq.ft. ) |
| Shop | 16.01 Sq.mts. ( 172 Sq.ft. ) |
| Shop | 5.99 Sq.mts. ( 64 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Mangeshi Tuliplast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Will Complete Before Oc |
|
|
|
Will Complete Before Oc |
Fire Protection And Fire Safety
Requirements
|
|
Will Complete Before Oc |
Landscaping & Tree Planting
|
|
Will Complete Before Oc |
|
|
|
Will Complete Before Oc |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Will Complete Before Oc |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Will Complete Before Oc |
|
|
|
Will Complete Before Oc |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Will Complete Before Oc |
Water Conservation, Rain water Harvesting
|
|
Will Complete Before Oc |
|
|
|
Will Complete Before Oc |
Buildings / Wings in Mangeshi Tulip
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mangeshi Tulip by Mangesh Gaikarlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
184
apartments in total
Saleable Area Statistics (Sq. ft.)
83515
Total
Total 184 apartments in project. 76 apartments booked. 41% apartments booked.
Total 83515 Sq.ft. saleable area. 32475 saleable area booked.
39% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A1 | Jul 2026 | 17 | 1 | 0 | 0 | 0 | 37 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 47.53 Sq.mts. ( 512 Sq.ft. ) | 60 | |
| Shop | 8.16 Sq.mts. ( 88 Sq.ft. ) | 2 | |
| Shop | 10.86 Sq.mts. ( 117 Sq.ft. ) | 2 | |
| Shop | 13.35 Sq.mts. ( 144 Sq.ft. ) | 2 | |
| Shop | 13.8 Sq.mts. ( 149 Sq.ft. ) | 2 | |
68 total apartments / 17 apartments booked. 25% apartments booked. |
| Work Description in Building A1 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A2 | Jul 2026 | 3 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 48.3 Sq.mts. ( 520 Sq.ft. ) | 6 | |
6 total apartments / 5 apartments booked. 83% apartments booked. |
| Work Description in Building A2 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A3 | Jul 2026 | 20 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 37.1 Sq.mts. ( 399 Sq.ft. ) | 3 | |
| 1 BHK | 39.55 Sq.mts. ( 426 Sq.ft. ) | 38 | |
| 2 BHK | 48.45 Sq.mts. ( 522 Sq.ft. ) | 20 | |
| 2 BHK | 48.5 Sq.mts. ( 522 Sq.ft. ) | 20 | |
| 2 BHK | 48.9 Sq.mts. ( 526 Sq.ft. ) | 17 | |
| 2 BHK | 8.09 Sq.mts. ( 87 Sq.ft. ) | 1 | |
| Shop | 8.62 Sq.mts. ( 93 Sq.ft. ) | 1 | |
| Shop | 8.84 Sq.mts. ( 95 Sq.ft. ) | 1 | |
| Shop | 10.73 Sq.mts. ( 115 Sq.ft. ) | 1 | |
| Shop | 12.33 Sq.mts. ( 133 Sq.ft. ) | 2 | |
| Shop | 13.42 Sq.mts. ( 144 Sq.ft. ) | 1 | |
| Shop | 14.49 Sq.mts. ( 156 Sq.ft. ) | 2 | |
| Shop | 14.99 Sq.mts. ( 161 Sq.ft. ) | 1 | |
| Shop | 16.01 Sq.mts. ( 172 Sq.ft. ) | 1 | |
| Shop | 5.99 Sq.mts. ( 64 Sq.ft. ) | 1 | |
110 total apartments / 54 apartments booked. 49% apartments booked. |
| Work Description in Building A3 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Mangesh Gaikar
for Project
Mangeshi Tulip
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |