Project overview

Mangeshi Tulip is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700047949. Mangeshi Tulip is located at Thane. This is a New Project being developed by Mangesh Gaikar.

Mangeshi Tulip has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 115 to 95 Sq.ft. Carpet. The Project has total 184 of which 108 are currently available for sale.

Mangeshi Tulip is being developed on a total land area of 38027 Sq.ft. Mangeshi Tulip has 3 Wings / Towers A1,A2,A3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Mangeshi Tulip
  • Location:
  • Thane
  • Const. Stage:
    New Project
  • Possession:
    30 Jul 2026
Developer Details

  • Developer:
    Mangesh Gaikar
  • Phone:
  • Address:
  • 001, 002 Ground Floor, A/5, Mangeshi Sahara, Chikanghar, Mangeshi Sahara, Near Chatribunglow, 421301
Project RERA Details
MAHA REARA No: P51700047949
Project Type Residential
RERA Project Status New Project
Architect Vitan Consultant
Funding Bank DCB Bank Ltd
Proposed Possession 30 Jul 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Aug 2023
Last Retrived 28 Jul 2025
Mangeshi Tulip QR Code
Mangeshi Tulip
MahaRERA - P51700047949
Apartment Details & Configuration
TypeArea
2 BHK47.53 Sq.mts. ( 512 Sq.ft. )
Shop8.16 Sq.mts. ( 88 Sq.ft. )
Shop10.86 Sq.mts. ( 117 Sq.ft. )
Shop13.35 Sq.mts. ( 144 Sq.ft. )
Shop13.8 Sq.mts. ( 149 Sq.ft. )
2 BHK48.3 Sq.mts. ( 520 Sq.ft. )
1 BHK37.1 Sq.mts. ( 399 Sq.ft. )
1 BHK39.55 Sq.mts. ( 426 Sq.ft. )
2 BHK48.45 Sq.mts. ( 522 Sq.ft. )
2 BHK48.5 Sq.mts. ( 522 Sq.ft. )
2 BHK48.9 Sq.mts. ( 526 Sq.ft. )
2 BHK8.09 Sq.mts. ( 87 Sq.ft. )
Shop8.62 Sq.mts. ( 93 Sq.ft. )
Shop8.84 Sq.mts. ( 95 Sq.ft. )
Shop10.73 Sq.mts. ( 115 Sq.ft. )
Shop12.33 Sq.mts. ( 133 Sq.ft. )
Shop13.42 Sq.mts. ( 144 Sq.ft. )
Shop14.49 Sq.mts. ( 156 Sq.ft. )
Shop14.99 Sq.mts. ( 161 Sq.ft. )
Shop16.01 Sq.mts. ( 172 Sq.ft. )
Shop5.99 Sq.mts. ( 64 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mangeshi Tuliplast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Complete Before Oc
Energy management
Will Complete Before Oc
Fire Protection And Fire Safety Requirements
Will Complete Before Oc
Landscaping & Tree Planting
Will Complete Before Oc
Open Parking
Will Complete Before Oc
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Complete Before Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Complete Before Oc
Street Lighting
Will Complete Before Oc
Treatment And Disposal Of Sewage And Sullage Water
Will Complete Before Oc
Water Conservation, Rain water Harvesting
Will Complete Before Oc
Water Supply
Will Complete Before Oc
Buildings / Wings in Mangeshi Tulip
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mangeshi Tulip by Mangesh Gaikarlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

38027 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

184 apartments in total
Total
184
Booked
76
Available
108

Saleable Area Statistics (Sq. ft.)

83515 Total
Total
83515
Booked
32475
Available
51040
Total 184 apartments in project. 76 apartments booked. 41% apartments booked.
Total 83515 Sq.ft. saleable area. 32475 saleable area booked.
39% area booked.

A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A1Jul 2026171000370
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.53 Sq.mts. ( 512 Sq.ft. )60
13 Booked21% Booked
21% Booked
Shop8.16 Sq.mts. ( 88 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop10.86 Sq.mts. ( 117 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.35 Sq.mts. ( 144 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop13.8 Sq.mts. ( 149 Sq.ft. )2
2 Booked100% Booked
100% Booked
68 total apartments / 17 apartments booked. 25% apartments booked.
Work Description in Building A1Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

A2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A2Jul 20263100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK48.3 Sq.mts. ( 520 Sq.ft. )6
5 Booked83% Booked
83% Booked
6 total apartments / 5 apartments booked. 83% apartments booked.
Work Description in Building A2Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

A3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A3Jul 202620100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.1 Sq.mts. ( 399 Sq.ft. )3
1 Booked33% Booked
33% Booked
1 BHK39.55 Sq.mts. ( 426 Sq.ft. )38
19 Booked50% Booked
50% Booked
2 BHK48.45 Sq.mts. ( 522 Sq.ft. )20
7 Booked35% Booked
35% Booked
2 BHK48.5 Sq.mts. ( 522 Sq.ft. )20
8 Booked40% Booked
40% Booked
2 BHK48.9 Sq.mts. ( 526 Sq.ft. )17
10 Booked58% Booked
58% Booked
2 BHK8.09 Sq.mts. ( 87 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop8.62 Sq.mts. ( 93 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop8.84 Sq.mts. ( 95 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop10.73 Sq.mts. ( 115 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.33 Sq.mts. ( 133 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop13.42 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.49 Sq.mts. ( 156 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop14.99 Sq.mts. ( 161 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.01 Sq.mts. ( 172 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop5.99 Sq.mts. ( 64 Sq.ft. )1
1 Booked100% Booked
100% Booked
110 total apartments / 54 apartments booked. 49% apartments booked.
Work Description in Building A3Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Mangesh Gaikar
for Project
Mangeshi Tulip
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation