Project overview

Mangeshi Sohan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700029848. Mangeshi Sohan is located at S No 56 Hissa A5, A6 S No 57 Hissa 221,2226. This is a New being developed by Mangeshi And Deveshwar Developers.

Mangeshi Sohan has 1 BHK Apartments with carpet areas ranging from 411 to 411 Sq.ft. Carpet. The Project has total 242 of which 60 are currently available for sale.

Mangeshi Sohan is being developed on a total land area of 41624 Sq.ft. Mangeshi Sohan has 3 Wings / Towers Building 1,Building 2,Building 3

ProjectDeveloperLocationPossession
Mangeshi City IiiMangesh Dashrath Gaikar9/2-A, 9/2-B, 9/2-C30-05-2022 00:00:00
Atrinandan HeightsHeramb ConstructionS.No- 40, Plot No-1230-12-2022 00:00:00
Project Details
  • Project:
    Mangeshi Sohan
  • Location:
  • S No 56 Hissa A5, A6 S No 57 Hissa 221,2226
  • Const. Stage:
    New
  • Possession:
    09 Mar 2026
Developer Details

  • Developer:
    Mangeshi And Deveshwar Developers
  • Phone:
  • Address:
  • Ambika Apartment
Project RERA Details
MAHA REARA No: P51700029848
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 09 Mar 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Jul 2021
Last Retrived 26 Jul 2025
Mangeshi Sohan QR Code
Mangeshi Sohan
MahaRERA - P51700029848
Apartment Details & Configuration
TypeArea
1 BHK37.16 Sq.mts. ( 400 Sq.ft. )
1 BHK37.26 Sq.mts. ( 401 Sq.ft. )
1 BHK38.13 Sq.mts. ( 410 Sq.ft. )
1 BHK41.85 Sq.mts. ( 450 Sq.ft. )
1 BHK42.73 Sq.mts. ( 460 Sq.ft. )
1 BHK43.72 Sq.mts. ( 471 Sq.ft. )
1 BHK45.5 Sq.mts. ( 490 Sq.ft. )
2 BHK50.62 Sq.mts. ( 545 Sq.ft. )
2 BHK50.85 Sq.mts. ( 547 Sq.ft. )
2 BHK51.96 Sq.mts. ( 559 Sq.ft. )
2 BHK52.61 Sq.mts. ( 566 Sq.ft. )
2 BHK52.71 Sq.mts. ( 567 Sq.ft. )
Shop7.98 Sq.mts. ( 86 Sq.ft. )
Shop8.5 Sq.mts. ( 91 Sq.ft. )
Shop9.65 Sq.mts. ( 104 Sq.ft. )
Shop11.78 Sq.mts. ( 127 Sq.ft. )
Shop11.91 Sq.mts. ( 128 Sq.ft. )
Shop12.09 Sq.mts. ( 130 Sq.ft. )
Shop12.92 Sq.mts. ( 139 Sq.ft. )
Shop13.78 Sq.mts. ( 148 Sq.ft. )
Shop13.92 Sq.mts. ( 150 Sq.ft. )
Shop14.12 Sq.mts. ( 152 Sq.ft. )
Shop14.16 Sq.mts. ( 152 Sq.ft. )
Shop14.4 Sq.mts. ( 155 Sq.ft. )
Shop15.81 Sq.mts. ( 170 Sq.ft. )
Shop18.33 Sq.mts. ( 197 Sq.ft. )
Shop18.52 Sq.mts. ( 199 Sq.ft. )
Shop18.64 Sq.mts. ( 201 Sq.ft. )
1 BHK38.18 Sq.mts. ( 411 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mangeshi Sohanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Mangeshi Sohan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mangeshi Sohan by Mangeshi And Deveshwar Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

41624 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

242 apartments in total
Total
242
Booked
182
Available
60

Saleable Area Statistics (Sq. ft.)

104879 Total
Total
104879
Booked
78266
Available
26612
Total 242 apartments in project. 182 apartments booked. 75% apartments booked.
Total 104879 Sq.ft. saleable area. 78266 saleable area booked.
75% area booked.

Building 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1Sep 202619101022106
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.16 Sq.mts. ( 400 Sq.ft. )16
14 Booked87% Booked
87% Booked
1 BHK37.26 Sq.mts. ( 401 Sq.ft. )87
61 Booked70% Booked
70% Booked
1 BHK38.13 Sq.mts. ( 410 Sq.ft. )19
7 Booked36% Booked
36% Booked
1 BHK41.85 Sq.mts. ( 450 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK42.73 Sq.mts. ( 460 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK43.72 Sq.mts. ( 471 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK45.5 Sq.mts. ( 490 Sq.ft. )14
5 Booked35% Booked
35% Booked
2 BHK50.62 Sq.mts. ( 545 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK50.85 Sq.mts. ( 547 Sq.ft. )19
16 Booked84% Booked
84% Booked
2 BHK51.96 Sq.mts. ( 559 Sq.ft. )10
9 Booked90% Booked
90% Booked
2 BHK52.61 Sq.mts. ( 566 Sq.ft. )19
15 Booked78% Booked
78% Booked
2 BHK52.71 Sq.mts. ( 567 Sq.ft. )19
17 Booked89% Booked
89% Booked
Shop7.98 Sq.mts. ( 86 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop8.5 Sq.mts. ( 91 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop9.65 Sq.mts. ( 104 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.78 Sq.mts. ( 127 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop11.91 Sq.mts. ( 128 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop12.09 Sq.mts. ( 130 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.92 Sq.mts. ( 139 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.78 Sq.mts. ( 148 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.92 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.12 Sq.mts. ( 152 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop14.16 Sq.mts. ( 152 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.4 Sq.mts. ( 155 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.81 Sq.mts. ( 170 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.33 Sq.mts. ( 197 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop18.52 Sq.mts. ( 199 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop18.64 Sq.mts. ( 201 Sq.ft. )1
1 Booked100% Booked
100% Booked
236 total apartments / 176 apartments booked. 74% apartments booked.
Work Description in Building Building 1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 2Sep 20263101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.18 Sq.mts. ( 411 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 total apartments / 2 apartments booked. 100% apartments booked.
Work Description in Building Building 2Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 3Sep 20265101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.18 Sq.mts. ( 411 Sq.ft. )4
4 Booked100% Booked
100% Booked
4 total apartments / 4 apartments booked. 100% apartments booked.
Work Description in Building Building 3Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Mangeshi And Deveshwar Developers
for Project
Mangeshi Sohan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation