Project overview

Manak is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700050044. Manak is located at Thane. This is a New Project being developed by Sunrise Developer.

Manak has 1 BHK & 2 BHK Apartments with carpet areas ranging from 426 to 614 Sq.ft. Carpet. The Project has total 26 of which 22 are currently available for sale.

Manak is being developed on a total land area of 5634 Sq.ft. Manak has 1 Wings / Towers Manak

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Manak
  • Location:
  • Thane
  • Const. Stage:
    New Project
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Sunrise Developer
  • Phone:
  • Address:
  • 101, Rambhuvan Residency, Rajaji Road, Opp Swaminarayan Mandir, Ramnagar, 421201
Project RERA Details
MAHA REARA No: P51700050044
Project Type Residential
RERA Project Status New Project
Funding Bank IDBI BANK
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 27 Nov 2023
Last Retrived 28 Jul 2025
Manak QR Code
Manak
MahaRERA - P51700050044
Apartment Details & Configuration
TypeArea
1 BHK39.59 Sq.mts. ( 426 Sq.ft. )
1 BHK41.5 Sq.mts. ( 447 Sq.ft. )
2 BHK52.99 Sq.mts. ( 570 Sq.ft. )
2 BHK57.04 Sq.mts. ( 614 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Manaklast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Solar Water
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
Na
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Manak
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Manak by Sunrise Developerlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

5634 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

26 apartments in total
Total
26
Booked
4
Available
22

Saleable Area Statistics (Sq. ft.)

13528 Total
Total
13528
Booked
2224
Available
11303
Total 26 apartments in project. 4 apartments booked. 15% apartments booked.
Total 13528 Sq.ft. saleable area. 2224 saleable area booked.
16% area booked.

Manak

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ManakDec 202571010271
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.59 Sq.mts. ( 426 Sq.ft. )6
1 BHK41.5 Sq.mts. ( 447 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK52.99 Sq.mts. ( 570 Sq.ft. )7
2 BHK57.04 Sq.mts. ( 614 Sq.ft. )7
2 Booked28% Booked
28% Booked
26 total apartments / 4 apartments booked. 15% apartments booked.
Work Description in Building ManakCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress41% done
41% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sunrise Developer
for Project
Manak
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation