Project overview

ProjectDeveloperLocationPossession
Project Details
  • Project:
  • Location:
  • Const. Stage:
  • Possession:
Developer Details

  • Developer:
  • Phone:
  • Address:
Project RERA Details
MAHA REARA No:
Project Type
RERA Project Status
Architect
Funding Bank
Proposed Possession
Revised Possession
Extended Possession
Litigations
Last Modified
Last Retrived
Apartment Details & Configuration
TypeArea
1 BHK35.99 Sq.mts. ( 387 Sq.ft. )
1 BHK36.95 Sq.mts. ( 398 Sq.ft. )
1 BHK37.11 Sq.mts. ( 399 Sq.ft. )
1 BHK39.33 Sq.mts. ( 423 Sq.ft. )
SHOP9.49 Sq.mts. ( 102 Sq.ft. )
SHOP10.4 Sq.mts. ( 112 Sq.ft. )
SHOP13.04 Sq.mts. ( 140 Sq.ft. )
SHOP18.19 Sq.mts. ( 196 Sq.ft. )
SHOP19.56 Sq.mts. ( 211 Sq.ft. )
SHOP31.47 Sq.mts. ( 339 Sq.ft. )
1 BHK35.83 Sq.mts. ( 386 Sq.ft. )
1 BHK37.31 Sq.mts. ( 402 Sq.ft. )
1 BHK40.03 Sq.mts. ( 431 Sq.ft. )
2 BHK44.63 Sq.mts. ( 480 Sq.ft. )
2 BHK48.14 Sq.mts. ( 518 Sq.ft. )
SHOP14.35 Sq.mts. ( 154 Sq.ft. )
SHOP15.55 Sq.mts. ( 167 Sq.ft. )
SHOP16.07 Sq.mts. ( 173 Sq.ft. )
SHOP16.72 Sq.mts. ( 180 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room Provided Work Yet Not Started
Energy management
Solar Panel In Bldg.No. 4 Work Yet Not Started
Fire Protection And Fire Safety Requirements
Bldg. No.4 Work Yet Not Started
Landscaping & Tree Planting
Tree Planting Work Yet Not Started
Open Parking
Asper Plan Work Yet Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Sewerage Lines Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Yet Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Waterharvesting Work Yet Not Started
Water Supply
Drinking Water Provided By Mjpwn After O.C.
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on as per information obtained from MARA RERA.

Project Area

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

55 apartments in total
Total
55
Booked
29
Available
26

Saleable Area Statistics (Sq. ft.)

18601 Total
Total
18601
Booked
8035
Available
10566
Total 55 apartments in project. 29 apartments booked. 52% apartments booked.
Total 18601 Sq.ft. saleable area. 8035 saleable area booked.
43% area booked.

Malhari Ghorpade Archade Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Malhari Ghorpade Archade Building No 4Dec 20197100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.99 Sq.mts. ( 387 Sq.ft. )6
3 Booked50% Booked
50% Booked
1 BHK36.95 Sq.mts. ( 398 Sq.ft. )11
3 Booked27% Booked
27% Booked
1 BHK37.11 Sq.mts. ( 399 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK39.33 Sq.mts. ( 423 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.49 Sq.mts. ( 102 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10.4 Sq.mts. ( 112 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP13.04 Sq.mts. ( 140 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.19 Sq.mts. ( 196 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.56 Sq.mts. ( 211 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP31.47 Sq.mts. ( 339 Sq.ft. )1
1 Booked100% Booked
100% Booked
31 total apartments / 18 apartments booked. 58% apartments booked.
Work Description in Building Malhari Ghorpade Archade Building No 4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress55% done
55% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Malhari Ghorpade Archade Building No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Malhari Ghorpade Archade Building No 5Dec 20195100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.83 Sq.mts. ( 386 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK36.95 Sq.mts. ( 398 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK37.31 Sq.mts. ( 402 Sq.ft. )3
1 Booked33% Booked
33% Booked
1 BHK40.03 Sq.mts. ( 431 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.63 Sq.mts. ( 480 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK48.14 Sq.mts. ( 518 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.49 Sq.mts. ( 102 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP10.4 Sq.mts. ( 112 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP13.04 Sq.mts. ( 140 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.35 Sq.mts. ( 154 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP15.55 Sq.mts. ( 167 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.07 Sq.mts. ( 173 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.72 Sq.mts. ( 180 Sq.ft. )1
1 Booked100% Booked
100% Booked
24 total apartments / 11 apartments booked. 45% apartments booked.
Work Description in Building Malhari Ghorpade Archade Building No 5Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress35% done
35% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress54% done
54% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress35% done
35% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked