Project overview

Malad Shitalnath Chsl is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800034499. Malad Shitalnath Chsl is located at , S. V. Road. This is a New Project being developed by K. Talsania Constructions.

Malad Shitalnath Chsl has 1 BHK & 2 BHK Apartments with carpet areas ranging from 362 to 668 Sq.ft. Carpet. The Project has total 128 of which 4 are currently available for sale.

Malad Shitalnath Chsl is being developed on a total land area of 22486 Sq.ft. Malad Shitalnath Chsl has 1 Wings / Towers Malad Shitalnath Chsl

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Malad Shitalnath Chsl
  • Location:
  • , S. V. Road
  • Const. Stage:
    New Project
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    K. Talsania Constructions
  • Phone:
  • Address:
  • 132/A,, Bombay Talkies Compound, Himanshu Rai Road, Bombay Talkies, Malad West, 400064
Project RERA Details
MAHA REARA No: P51800034499
Project Type Residential
RERA Project Status New Project
Funding Bank KOTAK MAHINDRA BANK LTD
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 02 Jan 2024
Last Retrived 28 Jul 2025
Malad Shitalnath Chsl QR Code
Malad Shitalnath Chsl
MahaRERA - P51800034499
Apartment Details & Configuration
TypeArea
1 BHK54.63 Sq.mts. ( 588 Sq.ft. )
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )
1 BHK37.63 Sq.mts. ( 405 Sq.ft. )
2 BHK41.34 Sq.mts. ( 445 Sq.ft. )
2 BHK45.52 Sq.mts. ( 490 Sq.ft. )
2 BHK52.12 Sq.mts. ( 561 Sq.ft. )
2 BHK53.88 Sq.mts. ( 580 Sq.ft. )
2 BHK55.93 Sq.mts. ( 602 Sq.ft. )
2 BHK57.79 Sq.mts. ( 622 Sq.ft. )
2 BHK59.55 Sq.mts. ( 641 Sq.ft. )
2 BHK61.22 Sq.mts. ( 659 Sq.ft. )
2 BHK62.06 Sq.mts. ( 668 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Malad Shitalnath Chsllast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
Cc Received Till 19Th Flr
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Cc Received Till 19Th Flr
Energy management
Na
Fire Protection And Fire Safety Requirements25% completed
25% Complete
Cc Received Till 19Th Flr
Landscaping & Tree Planting
Cc Received Till 19Th Flr
Open Parking
Cc Received Till 19Th Flr
Sewerage (Chamber, Lines, Septic Tank , STP)
Cc Received Till 19Th Flr
Solid Waste Management And Disposal
Cc Received Till 19Th Flr
Storm Water Drains
Cc Received Till 19Th Flr
Street Lighting
Cc Received Till 19Th Flr
Treatment And Disposal Of Sewage And Sullage Water
Cc Received Till 19Th Flr
Water Conservation, Rain water Harvesting
Cc Received Till 19Th Flr
Water Supply
Cc Received Till 19Th Flr
Buildings / Wings in Malad Shitalnath Chsl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Malad Shitalnath Chsl by K. Talsania Constructionslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

22486 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

128 apartments in total
Total
128
Booked
124
Available
4

Saleable Area Statistics (Sq. ft.)

66867 Total
Total
66867
Booked
64774
Available
2093
Total 128 apartments in project. 124 apartments booked. 96% apartments booked.
Total 66867 Sq.ft. saleable area. 64774 saleable area booked.
97% area booked.

Malad Shitalnath Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Malad Shitalnath ChslDec 202520201331
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK54.63 Sq.mts. ( 588 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK33.63 Sq.mts. ( 362 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK37.63 Sq.mts. ( 405 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK41.34 Sq.mts. ( 445 Sq.ft. )17
16 Booked94% Booked
94% Booked
2 BHK45.52 Sq.mts. ( 490 Sq.ft. )38
36 Booked94% Booked
94% Booked
2 BHK52.12 Sq.mts. ( 561 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK53.88 Sq.mts. ( 580 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK55.93 Sq.mts. ( 602 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK57.79 Sq.mts. ( 622 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK59.55 Sq.mts. ( 641 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK61.22 Sq.mts. ( 659 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK62.06 Sq.mts. ( 668 Sq.ft. )7
6 Booked85% Booked
85% Booked
128 total apartments / 124 apartments booked. 96% apartments booked.
Work Description in Building Malad Shitalnath ChslCompletion
Excavation
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress71% done
71% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress85% done
85% Booked
X number of Basement(s) and Plinth
X number of Podiums
work-in-progress95% done
95% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
K. Talsania Constructions
for Project
Malad Shitalnath Chsl
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation