Project overview
Malad Shaligram is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800045945. Malad Shaligram is located at 307/42/17 & 307/42/18. This is a New being developed by Stans Buildtech Realtors.
Malad Shaligram has 1 BHK & 2 BHK Apartments with carpet areas ranging from 436 to 646 Sq.ft. Carpet. The Project has total 9 of which 9 are currently available for sale.
Malad Shaligram is being developed on a total land area of 4525 Sq.ft. Malad Shaligram has 1 Wings / Towers Malad Shaligram Chs Ltd
| Project | Developer | Location | Possession |
-
Project:
Malad Shaligram
-
Location:
-
307/42/17 & 307/42/18
-
Const. Stage:
New
-
Possession:
31 Mar 2025
-
Developer:
Stans Buildtech Realtors
-
Phone:
-
Address:
-
Samartha Aishwarya
| MAHA REARA No: |
P51800045945 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Point To Point Architects & Consultants |
| Funding Bank |
ICICI BANK LIMITED |
| Proposed Possession |
31 Mar 2025 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
15 Jun 2022 |
| Last Retrived |
26 Jul 2025 |
Malad Shaligram QR Code
Malad Shaligram
MahaRERA - P51800045945
| Type | Area |
| 1 BHK | 41.76 Sq.mts. ( 450 Sq.ft. ) |
| 2 BHK | 60.03 Sq.mts. ( 646 Sq.ft. ) |
| 2 BHK | 40.54 Sq.mts. ( 436 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Malad Shaligramlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
As Per Fire Noc |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
As Per Norms |
Landscaping & Tree Planting
|
|
Na |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
As Per Norms |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
As Per Norms |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Na |
|
|
|
As Per Norms |
Buildings / Wings in Malad Shaligram
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Malad Shaligram by Stans Buildtech Realtorslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
9
apartments in total
Saleable Area Statistics (Sq. ft.)
4806
Total
Total 9 apartments in project. 0 apartments booked. 0% apartments booked.
Total 4806 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Malad Shaligram Chs Ltd | Mar 2025 | 8 | 1 | 0 | 10 | 0 | 2 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 41.76 Sq.mts. ( 450 Sq.ft. ) | 3 | |
| 2 BHK | 60.03 Sq.mts. ( 646 Sq.ft. ) | 4 | |
| 2 BHK | 40.54 Sq.mts. ( 436 Sq.ft. ) | 2 | |
9 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Malad Shaligram Chs Ltd | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Stans Buildtech Realtors
for Project
Malad Shaligram
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |