Project overview

Majestic Towers is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007283. Majestic Towers is located at Cts 300/A/1/Pt. This is a Ongoing being developed by Housing Development And Infrastructure Ltd.

Majestic Towers has 2 BHK, 2.5 BHK & 3 BHK Apartments with carpet areas ranging from 711 to 963 Sq.ft. Carpet. The Project has total 964 of which 563 are currently available for sale.

Majestic Towers is being developed on a total land area of 106709 Sq.ft. out of which 34282 Sq.ft. i.e 32% is reserved for recreational purposes. Majestic Towers has 7 Wings / Towers Wing - B,Wing - C,Wing - D,Wing A,Wing A -Phase 2-36Th Floor,Wing B - Phase 2 - 36Th Floor,Wing C - Phase 2- 36Th Floor

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Majestic Towers
  • Location:
  • Cts 300/A/1/Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2020
Developer Details

  • Developer:
    Housing Development And Infrastructure Ltd
  • Phone:
  • Address:
  • Hdil Towers
Project RERA Details
MAHA REARA No: P51800007283
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Indrajeet S. Deshmukh
Funding Bank YES BANK
Proposed Possession 30 Dec 2020
Revised Possession 30 Dec 2020
Extended Possession
Litigations No Litigations
Last Modified 17 Aug 2017
Last Retrived 26 Jul 2025
Majestic Towers QR Code
Majestic Towers
MahaRERA - P51800007283
Apartment Details & Configuration
TypeArea
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )
2.5 BHK75.06 Sq.mts. ( 808 Sq.ft. )
2.5 BHK75.26 Sq.mts. ( 810 Sq.ft. )
2 BHK66.01 Sq.mts. ( 711 Sq.ft. )
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )
2.5 BHK76.67 Sq.mts. ( 825 Sq.ft. )
3 BHK89.49 Sq.mts. ( 963 Sq.ft. )
3 BHK90.67 Sq.mts. ( 976 Sq.ft. )
2.5 BHK76.95 Sq.mts. ( 828 Sq.ft. )
2.5 BHK77.02 Sq.mts. ( 829 Sq.ft. )
2.5. BHK76.39 Sq.mts. ( 822 Sq.ft. )
2.5 BHK75.6 Sq.mts. ( 814 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Majestic Towerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Provided For Entire Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
Receiving Station Work Completed
Energy management
Yet To Commence
Fire Protection And Fire Safety Requirements
Yet To Commence
Landscaping & Tree Planting
Yet To Commence
Open Parking
Yet To Commence
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Commence
Solid Waste Management And Disposal
Yet To Commence
Storm Water Drains
Yet To Commence
Street Lighting
Yet To Commence
Treatment And Disposal Of Sewage And Sullage Water
Yet To Commence
Water Conservation, Rain water Harvesting
Yet To Commence
Water Supply
Yet To Commence
Buildings / Wings in Majestic Towers
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Majestic Towers by Housing Development And Infrastructure Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

106709 Sq. ft.

Project Area

34282 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

964 apartments in total
Total
964
Booked
401
Available
563

Saleable Area Statistics (Sq. ft.)

784865 Total
Total
784865
Booked
311354
Available
473511
Total 964 apartments in project. 401 apartments booked. 41% apartments booked.
Total 784865 Sq.ft. saleable area. 311354 saleable area booked.
40% area booked.

Wing - B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - BJan 190036121601
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )66
42 Booked63% Booked
63% Booked
2.5 BHK75.06 Sq.mts. ( 808 Sq.ft. )66
20 Booked30% Booked
30% Booked
2.5 BHK75.26 Sq.mts. ( 810 Sq.ft. )70
21 Booked30% Booked
30% Booked
202 total apartments / 83 apartments booked. 41% apartments booked.
Work Description in Building Wing - BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress47% done
47% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress59% done
59% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress59% done
59% Booked

Wing - C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - CJan 190036121631
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.01 Sq.mts. ( 711 Sq.ft. )70
45 Booked64% Booked
64% Booked
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )70
48 Booked68% Booked
68% Booked
2.5 BHK76.67 Sq.mts. ( 825 Sq.ft. )62
22 Booked35% Booked
35% Booked
3 BHK89.49 Sq.mts. ( 963 Sq.ft. )70
17 Booked24% Booked
24% Booked
272 total apartments / 132 apartments booked. 48% apartments booked.
Work Description in Building Wing - CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress62% done
62% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked

Wing - D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - DJan 1900361216251
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.01 Sq.mts. ( 711 Sq.ft. )66
40 Booked60% Booked
60% Booked
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )62
39 Booked62% Booked
62% Booked
3 BHK89.49 Sq.mts. ( 963 Sq.ft. )70
3 BHK90.67 Sq.mts. ( 976 Sq.ft. )70
15 Booked21% Booked
21% Booked
268 total apartments / 100 apartments booked. 37% apartments booked.
Work Description in Building Wing - DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress68% done
68% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress68% done
68% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJan 190036121601
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK76.95 Sq.mts. ( 828 Sq.ft. )70
32 Booked45% Booked
45% Booked
2.5 BHK77.02 Sq.mts. ( 829 Sq.ft. )66
25 Booked37% Booked
37% Booked
2.5. BHK76.39 Sq.mts. ( 822 Sq.ft. )66
29 Booked43% Booked
43% Booked
202 total apartments / 86 apartments booked. 42% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress27% done
27% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress27% done
27% Booked

Wing A -Phase 2-36Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A -Phase 2-36Th FloorJan 19001000600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2.5 BHK76.39 Sq.mts. ( 822 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK76.95 Sq.mts. ( 828 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK77.02 Sq.mts. ( 829 Sq.ft. )2
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing A -Phase 2-36Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B - Phase 2 - 36Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - Phase 2 - 36Th FloorJan 19001000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.11 Sq.mts. ( 712 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK75.26 Sq.mts. ( 810 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK75.6 Sq.mts. ( 814 Sq.ft. )2
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing B - Phase 2 - 36Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C - Phase 2- 36Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C - Phase 2- 36Th FloorJan 19001000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.01 Sq.mts. ( 711 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )2
None Booked0% Booked
0% Booked
2.5 BHK76.67 Sq.mts. ( 825 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK89.49 Sq.mts. ( 963 Sq.ft. )2
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing C - Phase 2- 36Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Housing Development And Infrastructure Ltd
for Project
Majestic Towers
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation