Project overview

Mahirr is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800035053. Mahirr is located at Final Plot No -37. This is a New being developed by Shree Balaji Enterprise.

Mahirr has 1 BHK, 1RK, 2 BHK, 3 BHK, Multipurpose Room & Shop Apartments with carpet areas ranging from 203 to 919 Sq.ft. Carpet. The Project has total 40 of which 4 are currently available for sale.

Mahirr is being developed on a total land area of 8219 Sq.ft. Mahirr has 1 Wings / Towers Mahirr

ProjectDeveloperLocationPossession
Om Sarjan ChslGlasswood Realty Private Limited777/9 149A Fp No 680/A/1/231-12-2019 00:00:00
Madhuban HeightsWadhwana Housing Development And Infrastructure Co740/4131-08-2018 00:00:00
Target The MallMahendra Jamnadas Kara590/1 To 6 F P No 33, Cts No 59031-12-2017 00:00:00
The ZoneMs Amann Raj Housing And Development CorporationCts No 655, 663, 664, 656Pt, 659, 662, 665Pt31-01-2021 00:00:00
Redevlopment Of Rajendra Nagar - Shree Ganesh Chs Ltd.Kaustubh Construction Private Limited88 Pt31-12-2018 00:00:00
Rustomjee SummitKeystone Realtors LimitedCts No 88 Pt31-12-2021 00:00:00
Pushp Vinod-3Vas Infrastructure Ltd.Mumbai Suburban, 40009215-12-2015 00:00:00
Paarijat Chs LtdMaan Housing Development94531-12-2018 00:00:00
Sakshat NavkarNavkar Infra ProjectsFinal Plot No 4930-09-2019 00:00:00
Navkar ParadiseNavkar Infra Projects65415-06-2021 00:00:00
Sajag ChsNavkar Infra ProjectsFp No 719/324-06-2019 00:00:00
Palkhi AuraKcd And Synergy Ventures29731-12-2019 00:00:00
Rite AspireRite Developers Pvt. Ltd.Cts No 4/A30-06-2021 00:00:00
Ekta Apartment Upto 17Th FloorAditya Enterprise 8831-03-2019 00:00:00
Rooprajat EnclaveSiddhivinayak Developers55 5730-12-2021 00:00:00
Modispaces AmazonModispaces Real Estate Pvt LtdFp No. 628 Of Village Borivali31-12-2019 00:00:00
Krishna KamalGraphic Housing Developments Pvt. Ltd.Cts No 290-301-03-2020 00:00:00
Rustomjee PinnacleKeystone Realtors LimitedCts No 88 Pt31-12-2018 00:00:00
Sbi Ragvihar ChsTuvin Consultancy Llp41210-12-2020 00:00:00
Borivali Ranjee ChsAditya Developers400092, Mumbai Suburban27-12-2018 00:00:00
Fortune Avirahi Wing AFortune ConstructionsPlot No 1 & Cts No 10430-12-2022 00:00:00
Parag - Reserve Co-Op Hsg SocSadguru Buildspacespvt. Ltd.536/C30-12-2020 00:00:00
Redevelopment Of Ulka ChslPranav Constructions LimitedCts No 116 Village Eksar Tps Borivali Iii Fp 32031-12-2019 00:00:00
Adinath ChsAditya Developers400092, Mumbai Suburban22-04-2020 00:00:00
Satra ParkShreenivas DevelopersFp 17930-12-2021 00:00:00
Redevlopment Of Sun And Moon Chs Ltd. Bldg No. 12 And 13Kaustubh Construction Private Limited88 Part31-12-2019 00:00:00
Ashtavinayak NxAshtavinayak InfrastructureGut No 19 Cts No 932331-03-2019 00:00:00
Sai Laxmi ChslShreejani Developers136/A 1To6, 136/A31-12-2017 00:00:00
Kaveri HeightsKaveri GoldCts No 607/A30-12-2021 00:00:00
VrindavanRight Channel Construction Pvt LtdCarter Road No 331-12-2017 00:00:00
Kcd RidgewoodKcd Heritage Pvt LtdBorivali, 400092, Mumbai Suburban29-02-2020 00:00:00
Neelkamal HeightsOsho Developers620/1031-12-2017 00:00:00
KrishnaSunit EnterpriseCts No 1142 1143 114730-12-2028 00:00:00
Pushp Vinod - 15Vas Infrastructure Ltd.F.P. No.64830-12-2021 00:00:00
Esspee TowerBhatia Builders And Developers Pvt Ltdc79/1-30, Cts 7930-06-2021 00:00:00
New Anamika Triveni FortuneTriveni DevelopersMumbai Suburban, 40009230-09-2017 00:00:00
Mangaldeep Chsl.Dhariwal Constructions (India) Private Limited88Pt31-12-2018 00:00:00
Akar PinnacleAkar Creations Private Limited12731-12-2017 00:00:00
MadhukunjDhara ConstructionCts No 799/C-1 And C-231-03-2018 00:00:00
Ami ChslMehta Group4831-12-2018 00:00:00
Casa RareGeopreneur Corp Pvt Ltd68331-03-2019 00:00:00
DhanrajAneisha Livings LlpFp No.31128-02-2025 00:00:00
Unicorn HeightsTeoama Infrastructure Private LimitedCts No 19/327, Plot No Am-330-06-2025 00:00:00
ZenonEntity Developers Private LimitedDattapada Road, Opp Dattapada Bmc School31-12-2025 00:00:00
Rishabraj RameshwarH Rishabraj Realty275 Part31-08-2024 00:00:00
Bella VistaSidharth EnterprisesCts No.64231-12-2026 00:00:00
Chaitanya Om Shivam - Om Shivam Premises CslChaitanya Enterprises680A/1/ 831-05-2024 00:00:00
Ankur PalaceOsho Developers719/815-08-2019 00:00:00
Samet Sikar MahalKothari Construction Company353, 351, 351/1 To 1631-12-2018 00:00:00
SiddhivinayakTriumph Ventures8830-06-2021 00:00:00
Ostwal TowerUnnati BuildersFp No. 37931-12-2018 00:00:00
Mayur Pankh Chs Ltd.Brightmen Buildspaces Llp280A130-12-2022 00:00:00
Rakhi Tower Phase 2 9Th To 11Th Floor PartWestern DevelopmentsMumbai Suburban, 40006621-12-2020 00:00:00
MahirrShree Balaji EnterpriseFinal Plot No -3731-12-2026 00:00:00
Kedar DarshanKosmos Developer275/811-04-2027 00:00:00
Borivali New Roma Sadan ChslSumukh Infraproject659.2030-06-2023 00:00:00
Casa PalazzoM/S. Paradigm Real Estates Llp4/10, Bearing Cts No. 38431-03-2019 00:00:00
Shivoham EnclaveSiddheshwar Builders Pvt. Ltd.389 Pt, 398/1-8 Of Village Kanheri, 389/131-143, 396/1-15, 395, 39730-06-2022 00:00:00
Ipsit Anand MangalNavkar Developers111/1 To 17, Cts No 111, Fp No 70 Of Village Kanheri31-12-2027 00:00:00
The Jambli Galli Chs LtdMahavir CorporationsFp No 8331-03-2024 00:00:00
Maya MamtaGreenbuilding Lifescapes Llp15907-10-2025 00:00:00
Manek Terrace Chs LtdK T GroupMumbai Suburban, 40009228-02-2017 00:00:00
Rakhi Tower Phase 1Western Developments332A 332B 332C 332D 332E21-12-2019 00:00:00
New Tashkent Terrace ChslAmar Associates5181 To 7, 51801-10-2018 00:00:00
Kashi BhuvanBharat V Kenny1011/A31-12-2024 00:00:00
Ashirwad ChslKranvis Realty Llp21901-08-2025 00:00:00
Vir EnclaveJkd Engineers And Infrastructure Private Limited27530-06-2025 00:00:00
Redevelopment Of Nahar ChslRishubh Developers544, 544/1 To 425-12-2021 00:00:00
Rosary Villa Co Operative Housing Society LimitedJay Vee ConstructionSurvey No 8 And 3 And Cts No 10131-03-2018 00:00:00
SwastikReliance Corporation55 /A30-09-2026 00:00:00
Rite PerintoRite Developers Pvt. Ltd.Cts No 225 Part30-03-2021 00:00:00
Rajal - Veer Abhimanyu Chs LtdNisar Properties Pvt. Ltd.Plot No 275, Cts No 511/330-06-2023 00:00:00
Borivali Neelkanth Nagar Chs LtdMahavir InfrastructureFp No. 768 Of Tps Borivali No. Iii31-12-2020 00:00:00
Borivali Gulmohar Terrace ChsAditya Developers13725-12-2019 00:00:00
Jessika Chs.Ltd.Vinayak Developers137/A30-12-2020 00:00:00
Ganesh Siddhi 2Shanti Enterprise400092, Mumbai Suburban08-01-2018 00:00:00
Jay KrishnaThe Green Venturez31331-12-2025 00:00:00
Preesha ParadiseVastu Realtors And Developers784, 783, 78231-12-2025 00:00:00
Rishabraj MangaleshRishabraj Infra Llp275A31-12-2026 00:00:00
Avenue 641Dimple CreationsFinal Plot No 64130-09-2020 00:00:00
SwashrayShanti Enterprise347 Plus Fp 28930-05-2022 00:00:00
Jayakunj Apartment ChslJayakunj Apartment Chsl1267/A/230-10-2022 00:00:00
Rbies Jaidatta ChslRbies Jaidatta Chsl719C31-12-2023 00:00:00
Supreme MadhukarSupreme EnterpriseTps Iii Borivali At Kastur Park, Cts No 620/17 Of Village Borivali05-01-2025 00:00:00
Borivali Padam ChslAmisha Constructions Private LimitedFp No 777, Plot No 8930-06-2025 00:00:00
Om Satyam Niwas Chs LtdGreenfield Developers & Realtors LlpF. P. No. 680/A/1/3 Of T.P.S. Iii Village Borivali31-07-2020 00:00:00
Dlh KesleyDlh Pansn Developers LlpCts No 4 C31-03-2019 00:00:00
Om SamarpanK Mehta And CompanyFp No. 680 A/1/431-07-2019 00:00:00
Muktangan ResidencyRaaz Mohammed Abdul Samad Pathan1062 ,1061 ,1061/131-10-2027 00:00:00
House Of Shreeji SharanMiles Infra Llp620/2630-09-2026 00:00:00
Gautam PrabhuH Rishabraj Realty65730-04-2027 00:00:00
TreviAshirwad Nice Developers72131-12-2025 00:00:00
Garden ViewSmlife Shreeji Developers Llp30-05-2025 00:00:00
DreamsvilleParadiso Builders Private Limited630A31-05-2024 00:00:00
VrindavanDinesh Amrutlal ThakkarFp No 37731-12-2025 00:00:00
OmkareshwarTriumph Ventures88/482 To 49731-12-2024 00:00:00
Mehta Premiere-ResidentialAsiatic Trading And Construction Company19/1, C.T.S. No.-19, 19/231-12-2025 00:00:00
Sky City Tower GIncline Realty Private LimitedCts No 107 E Of Village Magathane31-12-2027 00:00:00
Shree YashodhanK Mehta And Company6330-09-2025 00:00:00
Orchid TowerShree Laxmi Estate Pvt. Ltd.Final Plot No.2631-03-2026 00:00:00
Rishabraj Park VistasH Rishabraj RealtyFp No 71431-12-2025 00:00:00
Anjani TirthGeeta Space RealtorsBorivali, Tps Iii, 69131-12-2024 00:00:00
Auris Business CentreDev Pooja Builders Pvt Ltd169B31-12-2024 00:00:00
Borivali Veer DhavalShree Durga Vastu Makers Llp43, 222/1 To 5, 45, 44, 222, 225, 226 And 22931-05-2024 00:00:00
Ajmera ManorAjmera Manor Private LimitedO. P. No. 29, F. P. No. 20 Of Tps- Iii Borivali31-12-2025 00:00:00
Ramkrupa ChslKosmos&Amp;T-CreationL T Road30-03-2024 00:00:00
Rite Nectar Phase IiRite Developers Pvt. Ltd.Cts No 212 B30-09-2022 00:00:00
Himat Mansion Chs LtdBhatia Builders And Developers Pvt LtdcF.P.No.3130-06-2027 00:00:00
Project Details
  • Project:
    Mahirr
  • Location:
  • Final Plot No -37
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Shree Balaji Enterprise
  • Phone:
  • Address:
  • Rama Residency
Project RERA Details
MAHA REARA No: P51800035053
Project Type Others
RERA Project Status New
Architect Manish
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 May 2025
Last Retrived 26 Jul 2025
Mahirr QR Code
Mahirr
MahaRERA - P51800035053
Apartment Details & Configuration
TypeArea
1 BHK42.76 Sq.mts. ( 460 Sq.ft. )
1 BHK43.87 Sq.mts. ( 472 Sq.ft. )
1 BHK32.04 Sq.mts. ( 345 Sq.ft. )
1RK27.19 Sq.mts. ( 293 Sq.ft. )
2 BHK54.39 Sq.mts. ( 585 Sq.ft. )
2 BHK55.5 Sq.mts. ( 597 Sq.ft. )
2 BHK73.17 Sq.mts. ( 788 Sq.ft. )
3 BHK85.34 Sq.mts. ( 919 Sq.ft. )
Multipurpose Room7.18 Sq.mts. ( 77 Sq.ft. )
Multipurpose Room7.75 Sq.mts. ( 83 Sq.ft. )
Shop18.85 Sq.mts. ( 203 Sq.ft. )
Shop36.95 Sq.mts. ( 398 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mahirrlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
As Per Power Supply Authority
Energy management
Na
Fire Protection And Fire Safety Requirements90% completed
90% Complete
As Per Cfo Noc
Landscaping & Tree Planting
As Per Sg Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Rwh Consultant Design
Water Supply80% completed
80% Complete
As Per P Form
Buildings / Wings in Mahirr
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mahirr by Shree Balaji Enterpriselast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8219 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

40 apartments in total
Total
40
Booked
36
Available
4

Saleable Area Statistics (Sq. ft.)

27129 Total
Total
27129
Booked
23454
Available
3674
Total 40 apartments in project. 36 apartments booked. 90% apartments booked.
Total 27129 Sq.ft. saleable area. 23454 saleable area booked.
86% area booked.

Mahirr

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
MahirrDec 2026201000032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.76 Sq.mts. ( 460 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK43.87 Sq.mts. ( 472 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK32.04 Sq.mts. ( 345 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK27.19 Sq.mts. ( 293 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK54.39 Sq.mts. ( 585 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK55.5 Sq.mts. ( 597 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK73.17 Sq.mts. ( 788 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK85.34 Sq.mts. ( 919 Sq.ft. )21
17 Booked80% Booked
80% Booked
Multipurpose Room7.18 Sq.mts. ( 77 Sq.ft. )1
1 Booked100% Booked
100% Booked
Multipurpose Room7.75 Sq.mts. ( 83 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.85 Sq.mts. ( 203 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop36.95 Sq.mts. ( 398 Sq.ft. )1
1 Booked100% Booked
100% Booked
40 total apartments / 36 apartments booked. 90% apartments booked.
Work Description in Building MahirrCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Balaji Enterprise
for Project
Mahirr
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation