Project overview

Mahindra Happinest Palghar-2 Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000026225. Mahindra Happinest Palghar-2 Phase 1 is located at 158/ 183 P/ 183 P/ Plot No. 2. This is a New being developed by Mahindra Happinest Developers Limited(Formerly Known As Mahindra Happinest Developers Pvt. Ltd).

Mahindra Happinest Palghar-2 Phase 1 has 1 BHK A & STUDIO Apartments with carpet areas ranging from 157 to 290 Sq.ft. Carpet. The Project has total 485 of which 164 are currently available for sale.

Mahindra Happinest Palghar-2 Phase 1 is being developed on a total land area of 152161 Sq.ft. out of which 17665 Sq.ft. i.e 12% is reserved for recreational purposes. Mahindra Happinest Palghar-2 Phase 1 has 7 Wings / Towers Block 5 Wing A,Block 5 Wing B,Block 6 Wing A,Block 7 Wing A,Block 7 Wing B,Block 8 Wing A,Block 8 Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Mahindra Happinest Palghar-2 Phase 1
  • Location:
  • 158/ 183 P/ 183 P/ Plot No. 2
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Mahindra Happinest Developers Limited(Formerly Known As Mahindra Happinest Developers Pvt. Ltd)
  • Phone:
  • Address:
  • Mahindra Towers
Project RERA Details
MAHA REARA No: P99000026225
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Dec 2024
Last Retrived 28 Jul 2025
Mahindra Happinest Palghar-2 Phase 1 QR Code
Mahindra Happinest Palghar-2 Phase 1
MahaRERA - P99000026225
Apartment Details & Configuration
TypeArea
1 BHK B36.28 Sq.mts. ( 391 Sq.ft. )
1 BHK C34.35 Sq.mts. ( 370 Sq.ft. )
2 BHK A50.36 Sq.mts. ( 542 Sq.ft. )
2 BHK B47.89 Sq.mts. ( 515 Sq.ft. )
2 BHK C47.98 Sq.mts. ( 516 Sq.ft. )
2 BHK D50.5 Sq.mts. ( 544 Sq.ft. )
1 BHK A26.96 Sq.mts. ( 290 Sq.ft. )
STUDIO14.63 Sq.mts. ( 157 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mahindra Happinest Palghar-2 Phase 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Yet Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Yet Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Not Yet Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)75% completed
75% Complete
Not Yet Started
Solid Waste Management And Disposal
Not Yet Started
Storm Water Drains10% completed
10% Complete
Not Yet Started
Street Lighting
Not Yet Started
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Yet Started
Water Supply
Not Yet Started
Buildings / Wings in Mahindra Happinest Palghar-2 Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mahindra Happinest Palghar-2 Phase 1 by Mahindra Happinest Developers Limited(Formerly Known As Mahindra Happinest Developers Pvt. Ltd)last updated on 28 Jul 2025 as per information obtained from MARA RERA.

152161 Sq. ft.

Project Area

17665 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

485 apartments in total
Total
485
Booked
321
Available
164

Saleable Area Statistics (Sq. ft.)

120267 Total
Total
120267
Booked
76453
Available
43814
Total 485 apartments in project. 321 apartments booked. 66% apartments booked.
Total 120267 Sq.ft. saleable area. 76453 saleable area booked.
64% area booked.

Block 5 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Block 5 Wing AJun 20245100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK B36.28 Sq.mts. ( 391 Sq.ft. )30
25 Booked83% Booked
83% Booked
1 BHK C34.35 Sq.mts. ( 370 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK A50.36 Sq.mts. ( 542 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK B47.89 Sq.mts. ( 515 Sq.ft. )1
None Booked0% Booked
0% Booked
40 total apartments / 25 apartments booked. 62% apartments booked.
Work Description in Building Block 5 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress54% done
54% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress22% done
22% Booked
Stilt Floor

Block 5 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Block 5 Wing BJun 20245100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK B36.28 Sq.mts. ( 391 Sq.ft. )45
35 Booked77% Booked
77% Booked
1 BHK C34.35 Sq.mts. ( 370 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK A50.36 Sq.mts. ( 542 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK C47.98 Sq.mts. ( 516 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK D50.5 Sq.mts. ( 544 Sq.ft. )4
2 Booked50% Booked
50% Booked
55 total apartments / 37 apartments booked. 67% apartments booked.
Work Description in Building Block 5 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress33% done
33% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress22% done
22% Booked
Stilt Floor

Block 6 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Block 6 Wing AJun 20245100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A26.96 Sq.mts. ( 290 Sq.ft. )59
34 Booked57% Booked
57% Booked
59 total apartments / 34 apartments booked. 57% apartments booked.
Work Description in Building Block 6 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress36% done
36% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress51% done
51% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress22% done
22% Booked
Stilt Floor

Block 7 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Block 7 Wing AJun 20245100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A26.96 Sq.mts. ( 290 Sq.ft. )25
13 Booked52% Booked
52% Booked
STUDIO14.63 Sq.mts. ( 157 Sq.ft. )64
28 Booked43% Booked
43% Booked
89 total apartments / 41 apartments booked. 46% apartments booked.
Work Description in Building Block 7 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Block 7 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Block 7 Wing BJun 20245100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A26.96 Sq.mts. ( 290 Sq.ft. )15
10 Booked66% Booked
66% Booked
STUDIO14.63 Sq.mts. ( 157 Sq.ft. )54
53 Booked98% Booked
98% Booked
69 total apartments / 63 apartments booked. 91% apartments booked.
Work Description in Building Block 7 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Block 8 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Block 8 Wing AJun 20245100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A26.96 Sq.mts. ( 290 Sq.ft. )15
6 Booked40% Booked
40% Booked
STUDIO14.63 Sq.mts. ( 157 Sq.ft. )54
52 Booked96% Booked
96% Booked
69 total apartments / 58 apartments booked. 84% apartments booked.
Work Description in Building Block 8 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Block 8 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Block 8 Wing BJun 20245100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A26.96 Sq.mts. ( 290 Sq.ft. )30
21 Booked70% Booked
70% Booked
STUDIO14.63 Sq.mts. ( 157 Sq.ft. )74
42 Booked56% Booked
56% Booked
104 total apartments / 63 apartments booked. 60% apartments booked.
Work Description in Building Block 8 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Mahindra Happinest Developers Limited(Formerly Known As Mahindra Happinest Developers Pvt. Ltd)
for Project
Mahindra Happinest Palghar-2 Phase 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation