Project overview
Mahi Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700033262. Mahi Residency is located at Dombivali East. This is a New Project being developed by M/S Dream Homes Developers.
Mahi Residency has 1 BHK & 1RK Apartments with carpet areas ranging from 335 to 535 Sq.ft. Carpet. The Project has total 24 of which 24 are currently available for sale.
Mahi Residency is being developed on a total land area of 13993 Sq.ft. Mahi Residency has 3 Wings / Towers A Wing,B Wing,C Wing
| Project | Developer | Location | Possession |
-
Project:
Mahi Residency
-
Location:
-
Dombivali East
-
Const. Stage:
New Project
-
Possession:
25 Dec 2025
-
Developer:
M/S Dream Homes Developers
-
Phone:
-
Address:
-
Shop No A By 2, Navoday Society, Shankara Nagar, Near Jopndhale College Sonarpada, Dombivali East, 421201
| MAHA REARA No: |
P51700033262 |
| Project Type |
Others |
| RERA Project Status |
New Project |
| Architect |
S D Oak |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
25 Dec 2025 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
22 May 2022 |
| Last Retrived |
28 Jul 2025 |
Mahi Residency QR Code
Mahi Residency
MahaRERA - P51700033262
| Type | Area |
| 1 BHK | 49.7 Sq.mts. ( 535 Sq.ft. ) |
| 1 BHK | 54.34 Sq.mts. ( 585 Sq.ft. ) |
| 1 BHK | 58.52 Sq.mts. ( 630 Sq.ft. ) |
| 1RK | 33.44 Sq.mts. ( 360 Sq.ft. ) |
| 1RK | 35.3 Sq.mts. ( 380 Sq.ft. ) |
| Shop | 9.29 Sq.mts. ( 100 Sq.ft. ) |
| Shop | 15.32 Sq.mts. ( 165 Sq.ft. ) |
| Shop | 18.11 Sq.mts. ( 195 Sq.ft. ) |
| Shop | 25.08 Sq.mts. ( 270 Sq.ft. ) |
| 1 BHK | 50.16 Sq.mts. ( 540 Sq.ft. ) |
| 1 BHK | 61.78 Sq.mts. ( 665 Sq.ft. ) |
| 1RK | 34.37 Sq.mts. ( 370 Sq.ft. ) |
| 1RK | 36.23 Sq.mts. ( 390 Sq.ft. ) |
| 1RK | 40.87 Sq.mts. ( 440 Sq.ft. ) |
| 1 BHK | 45.98 Sq.mts. ( 495 Sq.ft. ) |
| 1RK | 31.12 Sq.mts. ( 335 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Mahi Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station80% completed
|
|
1 Electric Meter Room Space For Each Wing |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Minimum Trees |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Connected With Kdmc Underground Sewerage Lines |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Wip |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting |
|
|
|
Water Supply Will Be Provide By Kdmc |
Buildings / Wings in Mahi Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mahi Residency by M/S Dream Homes Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
24
apartments in total
Saleable Area Statistics (Sq. ft.)
9884
Total
Total 24 apartments in project. 0 apartments booked. 0% apartments booked.
Total 9884 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A Wing | Dec 2025 | 8 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 49.7 Sq.mts. ( 535 Sq.ft. ) | 1 | |
| 1 BHK | 54.34 Sq.mts. ( 585 Sq.ft. ) | 1 | |
| 1 BHK | 58.52 Sq.mts. ( 630 Sq.ft. ) | 1 | |
| 1RK | 33.44 Sq.mts. ( 360 Sq.ft. ) | 1 | |
| 1RK | 35.3 Sq.mts. ( 380 Sq.ft. ) | 1 | |
| Shop | 9.29 Sq.mts. ( 100 Sq.ft. ) | 1 | |
| Shop | 15.32 Sq.mts. ( 165 Sq.ft. ) | 1 | |
| Shop | 18.11 Sq.mts. ( 195 Sq.ft. ) | 1 | |
| Shop | 25.08 Sq.mts. ( 270 Sq.ft. ) | 1 | |
9 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building A Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B Wing | Dec 2025 | 8 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 50.16 Sq.mts. ( 540 Sq.ft. ) | 1 | |
| 1 BHK | 61.78 Sq.mts. ( 665 Sq.ft. ) | 1 | |
| 1RK | 34.37 Sq.mts. ( 370 Sq.ft. ) | 1 | |
| 1RK | 36.23 Sq.mts. ( 390 Sq.ft. ) | 2 | |
| 1RK | 40.87 Sq.mts. ( 440 Sq.ft. ) | 1 | |
6 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building B Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| C Wing | Dec 2025 | 8 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 45.98 Sq.mts. ( 495 Sq.ft. ) | 2 | |
| 1 BHK | 49.7 Sq.mts. ( 535 Sq.ft. ) | 2 | |
| 1RK | 31.12 Sq.mts. ( 335 Sq.ft. ) | 2 | |
| 1RK | 35.3 Sq.mts. ( 380 Sq.ft. ) | 3 | |
9 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building C Wing | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
M/S Dream Homes Developers
for Project
Mahi Residency
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |