Project overview
Mahavir Ville is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900020220. Mahavir Ville is located at Matunga East. This is a New Project being developed by Eknath Infrastructure Llp.
Mahavir Ville has 3 BHK GRAND A, 3 BHK GRAND B, 3 BHK SMART A, 3 BHK SMART B, 5 BHK, DUPLEX 1 & DUPLEX 2 Apartments with carpet areas ranging from 1318 to 1030 Sq.ft. Carpet. The Project has total 155 of which 155 are currently available for sale.
Mahavir Ville is being developed on a total land area of 29063 Sq.ft. Mahavir Ville has 2 Wings / Towers Mahavir Ville 1 To 28 - Wing C,Mahavir Ville 29-36 - Wing C
| Project | Developer | Location | Possession |
-
Project:
Mahavir Ville
-
Location:
-
Matunga East
-
Const. Stage:
New Project
-
Possession:
31 Dec 2024
-
Developer:
Eknath Infrastructure Llp
-
Phone:
-
Address:
-
C-31, G - Block, Naman Centre, Bandra Kurla Complex, Opposite Dena Bank, Bandra East, 400051
| MAHA REARA No: |
P51900020220 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
YES BANK |
| Proposed Possession |
31 Dec 2024 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
Yes |
| Last Modified |
17 Oct 2023 |
| Last Retrived |
28 Jul 2025 |
Mahavir Ville QR Code
Mahavir Ville
MahaRERA - P51900020220
| Type | Area |
| 3 BHK COMFORT | 116.91 Sq.mts. ( 1258 Sq.ft. ) |
| 3 BHK GRAND A | 122.48 Sq.mts. ( 1318 Sq.ft. ) |
| 3 BHK GRAND B | 126.83 Sq.mts. ( 1365 Sq.ft. ) |
| 3 BHK SMART A | 94.78 Sq.mts. ( 1020 Sq.ft. ) |
| 3 BHK SMART B | 95.7 Sq.mts. ( 1030 Sq.ft. ) |
| 3 BHK SMART C | 103.8 Sq.mts. ( 1117 Sq.ft. ) |
| 5 BHK | 192.02 Sq.mts. ( 2067 Sq.ft. ) |
| DUPLEX 1 | 240.1 Sq.mts. ( 2584 Sq.ft. ) |
| DUPLEX 2 | 249.34 Sq.mts. ( 2684 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Mahavir Villelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Work Yet To Commence |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Work Yet To Commence |
|
|
|
Work Yet To Commence |
Fire Protection And Fire Safety
Requirements
|
|
Work Yet To Commence |
Landscaping & Tree Planting
|
|
Work Yet To Commence |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)20% completed
|
|
Work In Progress |
Solid Waste Management And Disposal
|
|
Work Yet To Commence |
|
|
|
Work Yet To Commence |
|
|
|
Work Yet To Commence |
Treatment And Disposal Of Sewage And Sullage Water20% completed
|
|
Work In Progress |
Water Conservation, Rain water Harvesting
|
|
Work Yet To Commence |
|
|
|
Work Yet To Commence |
Buildings / Wings in Mahavir Ville
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mahavir Ville by Eknath Infrastructure Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
155
apartments in total
Saleable Area Statistics (Sq. ft.)
204042
Total
Total 155 apartments in project. 0 apartments booked. 0% apartments booked.
Total 204042 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Mahavir Ville 1 To 28 - Wing C | Jun 2024 | 29 | 1 | 0 | 1 | 5 | 0 | 275 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 3 BHK COMFORT | 116.91 Sq.mts. ( 1258 Sq.ft. ) | 28 | |
| 3 BHK GRAND A | 122.48 Sq.mts. ( 1318 Sq.ft. ) | 28 | |
| 3 BHK GRAND B | 126.83 Sq.mts. ( 1365 Sq.ft. ) | 22 | |
| 3 BHK GRAND C | 126.83 Sq.mts. ( 1365 Sq.ft. ) | 7 | |
| 3 BHK SMART A | 94.78 Sq.mts. ( 1020 Sq.ft. ) | 18 | |
| 3 BHK SMART B | 95.7 Sq.mts. ( 1030 Sq.ft. ) | 21 | |
| 3 BHK SMART C | 103.8 Sq.mts. ( 1117 Sq.ft. ) | 1 | |
| 5 BHK | 192.02 Sq.mts. ( 2067 Sq.ft. ) | 7 | |
132 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Mahavir Ville 1 To 28 - Wing C | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Mahavir Ville 29-36 - Wing C | Jun 2024 | 9 | 0 | 0 | 0 | 0 | 0 | 65 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 3 BHK GRAND A | 122.48 Sq.mts. ( 1318 Sq.ft. ) | 4 | |
| 3 BHK GRAND B | 126.83 Sq.mts. ( 1365 Sq.ft. ) | 4 | |
| 3 BHK SMART A | 94.78 Sq.mts. ( 1020 Sq.ft. ) | 3 | |
| 3 BHK SMART B | 95.7 Sq.mts. ( 1030 Sq.ft. ) | 4 | |
| 5 BHK | 192.02 Sq.mts. ( 2067 Sq.ft. ) | 4 | |
| DUPLEX 1 | 240.1 Sq.mts. ( 2584 Sq.ft. ) | 2 | |
| DUPLEX 2 | 249.34 Sq.mts. ( 2684 Sq.ft. ) | 2 | |
23 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Mahavir Ville 29-36 - Wing C | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Eknath Infrastructure Llp
for Project
Mahavir Ville
last updated on
28 Jul 2025 as per information obtained from MARA RERA.