Project overview

Mahaveer Horizon Wing A And Wing B is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700051107. Mahaveer Horizon Wing A And Wing B is located at 28/4/5/2/1. This is a New being developed by Mahaveer Infrastructure Pvt Ltd.

Mahaveer Horizon Wing A And Wing B has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 128 to 622 Sq.ft. Carpet. The Project has total 95 of which 86 are currently available for sale.

Mahaveer Horizon Wing A And Wing B is being developed on a total land area of 26910 Sq.ft. Mahaveer Horizon Wing A And Wing B has 2 Wings / Towers Mahaveer Horizon B Wing,Mahaveer Horizon Wing A

ProjectDeveloperLocationPossession
Mangeshi City IiiMangesh Dashrath Gaikar9/2-A, 9/2-B, 9/2-C30-05-2022 00:00:00
Atrinandan HeightsHeramb ConstructionS.No- 40, Plot No-1230-12-2022 00:00:00
Project Details
  • Project:
    Mahaveer Horizon Wing A And Wing B
  • Location:
  • 28/4/5/2/1
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    Mahaveer Infrastructure Pvt Ltd
  • Phone:
  • Address:
  • Mahaveer Infrastructure
Project RERA Details
MAHA REARA No: P51700051107
Project Type Residential / Group Housing
RERA Project Status New
Architect Vitan Consultants
Funding Bank BANK OF BARODA
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Jun 2024
Last Retrived 26 Jul 2025
Mahaveer Horizon Wing A And Wing B QR Code
Mahaveer Horizon Wing A And Wing B
MahaRERA - P51700051107
Apartment Details & Configuration
TypeArea
2 BHK47.13 Sq.mts. ( 507 Sq.ft. )
2 BHK57.76 Sq.mts. ( 622 Sq.ft. )
2 BHK62.58 Sq.mts. ( 674 Sq.ft. )
Shop11.88 Sq.mts. ( 128 Sq.ft. )
Shop13.61 Sq.mts. ( 146 Sq.ft. )
Shop14.51 Sq.mts. ( 156 Sq.ft. )
Shop16.08 Sq.mts. ( 173 Sq.ft. )
Shop16.09 Sq.mts. ( 173 Sq.ft. )
Shop17.29 Sq.mts. ( 186 Sq.ft. )
1 BHK42.81 Sq.mts. ( 461 Sq.ft. )
2 BHK57.82 Sq.mts. ( 622 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mahaveer Horizon Wing A And Wing Blast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
At The Time Of Oc
Energy management
Solar Heater At The Time Of Oc
Fire Protection And Fire Safety Requirements
At The Time Of Oc
Landscaping & Tree Planting
At The Time Of Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
At The Time Of Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
At The Time Of Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
At The Time Of Oc
Water Supply
To Be Sanctioned By Kdmc At The Time Of Oc
Buildings / Wings in Mahaveer Horizon Wing A And Wing B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mahaveer Horizon Wing A And Wing B by Mahaveer Infrastructure Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

26910 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

95 apartments in total
Total
95
Booked
9
Available
86

Saleable Area Statistics (Sq. ft.)

49183 Total
Total
49183
Booked
5051
Available
44132
Total 95 apartments in project. 9 apartments booked. 9% apartments booked.
Total 49183 Sq.ft. saleable area. 5051 saleable area booked.
10% area booked.

Mahaveer Horizon B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mahaveer Horizon B WingDec 202820101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47.13 Sq.mts. ( 507 Sq.ft. )18
2 BHK57.76 Sq.mts. ( 622 Sq.ft. )20
None Booked0% Booked
0% Booked
2 BHK62.58 Sq.mts. ( 674 Sq.ft. )20
Shop11.88 Sq.mts. ( 128 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.61 Sq.mts. ( 146 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.51 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.08 Sq.mts. ( 173 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.09 Sq.mts. ( 173 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop17.29 Sq.mts. ( 186 Sq.ft. )1
None Booked0% Booked
0% Booked
67 total apartments / 2 apartments booked. 2% apartments booked.
Work Description in Building Mahaveer Horizon B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress57% done
57% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Mahaveer Horizon Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mahaveer Horizon Wing ADec 20287101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.81 Sq.mts. ( 461 Sq.ft. )6
3 Booked50% Booked
50% Booked
2 BHK57.76 Sq.mts. ( 622 Sq.ft. )7
3 Booked42% Booked
42% Booked
2 BHK57.82 Sq.mts. ( 622 Sq.ft. )7
Shop11.88 Sq.mts. ( 128 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.61 Sq.mts. ( 146 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop16.09 Sq.mts. ( 173 Sq.ft. )2
None Booked0% Booked
0% Booked
28 total apartments / 7 apartments booked. 25% apartments booked.
Work Description in Building Mahaveer Horizon Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Mahaveer Infrastructure Pvt Ltd
for Project
Mahaveer Horizon Wing A And Wing B
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation