Project overview

Mahalaxmi Nagar is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000013575. Mahalaxmi Nagar is located at 97/1. This is a Ongoing being developed by Mahalaxmi Homemakers Private Limited.

Mahalaxmi Nagar has 1 BHK, 1RK & SHOP Apartments with carpet areas ranging from 117 to 108 Sq.ft. Carpet. The Project has total 574 of which 281 are currently available for sale.

Mahalaxmi Nagar is being developed on a total land area of 153710 Sq.ft. out of which 20137 Sq.ft. i.e 13% is reserved for recreational purposes. Mahalaxmi Nagar has 4 Wings / Towers Bldg No 1,Bldg No 3,Bldg No 4,Bldg No 5

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Mahalaxmi Nagar
  • Location:
  • 97/1
  • Const. Stage:
    Ongoing
  • Possession:
    27 Jul 2023
Developer Details

  • Developer:
    Mahalaxmi Homemakers Private Limited
  • Phone:
  • Address:
  • Paras Plaza
Project RERA Details
MAHA REARA No: P99000013575
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 27 Jul 2023
Revised Possession 27 Jul 2023
Extended Possession
Litigations No Litigations
Last Modified 13 Oct 2017
Last Retrived 28 Jul 2025
Mahalaxmi Nagar QR Code
Mahalaxmi Nagar
MahaRERA - P99000013575
Apartment Details & Configuration
TypeArea
1 BHK24.11 Sq.mts. ( 260 Sq.ft. )
1 BHK24.26 Sq.mts. ( 261 Sq.ft. )
1 BHK24.45 Sq.mts. ( 263 Sq.ft. )
1RK19.02 Sq.mts. ( 205 Sq.ft. )
1RK19.17 Sq.mts. ( 206 Sq.ft. )
1RK19.36 Sq.mts. ( 208 Sq.ft. )
SHOP9.38 Sq.mts. ( 101 Sq.ft. )
SHOP9.63 Sq.mts. ( 104 Sq.ft. )
SHOP10.49 Sq.mts. ( 113 Sq.ft. )
SHOP14.55 Sq.mts. ( 157 Sq.ft. )
1 BHK24.52 Sq.mts. ( 264 Sq.ft. )
1 BHK24.7 Sq.mts. ( 266 Sq.ft. )
1 BHK24.97 Sq.mts. ( 269 Sq.ft. )
1RK19.18 Sq.mts. ( 206 Sq.ft. )
1RK19.44 Sq.mts. ( 209 Sq.ft. )
1RK19.63 Sq.mts. ( 211 Sq.ft. )
SHOP19.16 Sq.mts. ( 206 Sq.ft. )
SHOP8.71 Sq.mts. ( 94 Sq.ft. )
SHOP9.69 Sq.mts. ( 104 Sq.ft. )
SHOP9.95 Sq.mts. ( 107 Sq.ft. )
SHOP10.89 Sq.mts. ( 117 Sq.ft. )
SHOP13.53 Sq.mts. ( 146 Sq.ft. )
SHOP14.95 Sq.mts. ( 161 Sq.ft. )
SHOP21.48 Sq.mts. ( 231 Sq.ft. )
1 BHK24.37 Sq.mts. ( 262 Sq.ft. )
1 BHK24.71 Sq.mts. ( 266 Sq.ft. )
1RK19.03 Sq.mts. ( 205 Sq.ft. )
1RK19.62 Sq.mts. ( 211 Sq.ft. )
SHOP24.12 Sq.mts. ( 260 Sq.ft. )
1RK19.34 Sq.mts. ( 208 Sq.ft. )
1RK19.49 Sq.mts. ( 210 Sq.ft. )
1RK19.68 Sq.mts. ( 212 Sq.ft. )
SHOP9.99 Sq.mts. ( 108 Sq.ft. )
SHOP12.54 Sq.mts. ( 135 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Mahalaxmi Nagarlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space50% completed
50% Complete
Completed For Bldg.No.1 &Amp; 3
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
All Major Works Are Completed Except Bldg.No.4 &Amp; 5
Energy management
Na
Fire Protection And Fire Safety Requirements
Applied For Cfo Noc
Landscaping & Tree Planting50% completed
50% Complete
Completed For Bldg.No.1 &Amp; 3
Open Parking50% completed
50% Complete
Completed For Bldg.No.1 &Amp; 3
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Completed For Bldg.No.1 &Amp; 3
Solid Waste Management And Disposal50% completed
50% Complete
Completed For Bldg.No.1 &Amp; 3
Storm Water Drains50% completed
50% Complete
Completed For Bldg.No.1 &Amp; 3
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
Completed For Bldg.No.1 &Amp; 3
Water Supply
Water Connection Yet Not Given By Vvcmc
Buildings / Wings in Mahalaxmi Nagar
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mahalaxmi Nagar by Mahalaxmi Homemakers Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

153710 Sq. ft.

Project Area

20137 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

574 apartments in total
Total
574
Booked
293
Available
281

Saleable Area Statistics (Sq. ft.)

132646 Total
Total
132646
Booked
68410
Available
64236
Total 574 apartments in project. 293 apartments booked. 51% apartments booked.
Total 132646 Sq.ft. saleable area. 68410 saleable area booked.
52% area booked.

Bldg No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 1Jul 20226100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.11 Sq.mts. ( 260 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK24.26 Sq.mts. ( 261 Sq.ft. )22
22 Booked100% Booked
100% Booked
1 BHK24.45 Sq.mts. ( 263 Sq.ft. )33
33 Booked100% Booked
100% Booked
1RK19.02 Sq.mts. ( 205 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK19.17 Sq.mts. ( 206 Sq.ft. )8
8 Booked100% Booked
100% Booked
1RK19.36 Sq.mts. ( 208 Sq.ft. )12
12 Booked100% Booked
100% Booked
SHOP9.38 Sq.mts. ( 101 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.63 Sq.mts. ( 104 Sq.ft. )4
4 Booked100% Booked
100% Booked
SHOP10.49 Sq.mts. ( 113 Sq.ft. )5
1 Booked20% Booked
20% Booked
SHOP14.55 Sq.mts. ( 157 Sq.ft. )6
6 Booked100% Booked
100% Booked
100 total apartments / 96 apartments booked. 96% apartments booked.
Work Description in Building Bldg No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress79% done
79% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Bldg No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 3Jul 20228100050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.11 Sq.mts. ( 260 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK24.26 Sq.mts. ( 261 Sq.ft. )48
48 Booked100% Booked
100% Booked
1 BHK24.45 Sq.mts. ( 263 Sq.ft. )63
63 Booked100% Booked
100% Booked
1 BHK24.52 Sq.mts. ( 264 Sq.ft. )9
9 Booked100% Booked
100% Booked
1 BHK24.7 Sq.mts. ( 266 Sq.ft. )9
9 Booked100% Booked
100% Booked
1 BHK24.97 Sq.mts. ( 269 Sq.ft. )4
4 Booked100% Booked
100% Booked
1RK19.18 Sq.mts. ( 206 Sq.ft. )6
6 Booked100% Booked
100% Booked
1RK19.36 Sq.mts. ( 208 Sq.ft. )8
8 Booked100% Booked
100% Booked
1RK19.44 Sq.mts. ( 209 Sq.ft. )3
3 Booked100% Booked
100% Booked
1RK19.63 Sq.mts. ( 211 Sq.ft. )4
3 Booked75% Booked
75% Booked
1RK19.02 Sq.mts. ( 205 Sq.ft. )4
4 Booked100% Booked
100% Booked
SHOP19.16 Sq.mts. ( 206 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP8.71 Sq.mts. ( 94 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP9.69 Sq.mts. ( 104 Sq.ft. )2
2 Booked100% Booked
100% Booked
SHOP9.95 Sq.mts. ( 107 Sq.ft. )9
9 Booked100% Booked
100% Booked
SHOP10.89 Sq.mts. ( 117 Sq.ft. )5
5 Booked100% Booked
100% Booked
SHOP13.53 Sq.mts. ( 146 Sq.ft. )4
4 Booked100% Booked
100% Booked
SHOP14.95 Sq.mts. ( 161 Sq.ft. )11
11 Booked100% Booked
100% Booked
SHOP21.48 Sq.mts. ( 231 Sq.ft. )1
1 Booked100% Booked
100% Booked
198 total apartments / 197 apartments booked. 99% apartments booked.
Work Description in Building Bldg No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress79% done
79% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Bldg No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 4Jan 19008100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.26 Sq.mts. ( 261 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK24.37 Sq.mts. ( 262 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK24.45 Sq.mts. ( 263 Sq.ft. )28
None Booked0% Booked
0% Booked
1 BHK24.52 Sq.mts. ( 264 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK24.71 Sq.mts. ( 266 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK24.97 Sq.mts. ( 269 Sq.ft. )1
None Booked0% Booked
0% Booked
1bhk24.11 Sq.mts. ( 260 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK19.03 Sq.mts. ( 205 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK19.17 Sq.mts. ( 206 Sq.ft. )9
None Booked0% Booked
0% Booked
1RK19.36 Sq.mts. ( 208 Sq.ft. )12
None Booked0% Booked
0% Booked
1RK19.44 Sq.mts. ( 209 Sq.ft. )6
None Booked0% Booked
0% Booked
1RK19.62 Sq.mts. ( 211 Sq.ft. )8
None Booked0% Booked
0% Booked
SHOP21.48 Sq.mts. ( 231 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP9.69 Sq.mts. ( 104 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP9.95 Sq.mts. ( 107 Sq.ft. )4
None Booked0% Booked
0% Booked
SHOP10.89 Sq.mts. ( 117 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.53 Sq.mts. ( 146 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP14.95 Sq.mts. ( 161 Sq.ft. )6
None Booked0% Booked
0% Booked
SHOP19.16 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP24.12 Sq.mts. ( 260 Sq.ft. )1
None Booked0% Booked
0% Booked
123 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 4Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bldg No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bldg No 5Jan 19008100050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.11 Sq.mts. ( 260 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK24.26 Sq.mts. ( 261 Sq.ft. )33
None Booked0% Booked
0% Booked
1 BHK24.45 Sq.mts. ( 263 Sq.ft. )44
None Booked0% Booked
0% Booked
1 BHK24.52 Sq.mts. ( 264 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK24.71 Sq.mts. ( 266 Sq.ft. )12
None Booked0% Booked
0% Booked
1RK19.02 Sq.mts. ( 205 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK19.17 Sq.mts. ( 206 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK19.34 Sq.mts. ( 208 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK19.36 Sq.mts. ( 208 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK19.44 Sq.mts. ( 209 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK19.49 Sq.mts. ( 210 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK19.62 Sq.mts. ( 211 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK19.68 Sq.mts. ( 212 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK9.95 Sq.mts. ( 107 Sq.ft. )6
None Booked0% Booked
0% Booked
SHOP9.99 Sq.mts. ( 108 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.89 Sq.mts. ( 117 Sq.ft. )4
None Booked0% Booked
0% Booked
SHOP12.54 Sq.mts. ( 135 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.53 Sq.mts. ( 146 Sq.ft. )4
None Booked0% Booked
0% Booked
SHOP14.95 Sq.mts. ( 161 Sq.ft. )9
None Booked0% Booked
0% Booked
SHOP9.69 Sq.mts. ( 104 Sq.ft. )1
None Booked0% Booked
0% Booked
153 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bldg No 5Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Mahalaxmi Homemakers Private Limited
for Project
Mahalaxmi Nagar
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation